Loading...
HomeMy WebLinkAboutStaff Comments CITY OF COLLEG E STATION DEVELOPMENT S ERVICES 1101 Texas Avenue South , PO Box 9960 College Station, Tex as 77842 Phone (979) 764-3570 /Fax (979) 764-3496 MEMORANDUM August 7, 2000 TO: Robert Payne, R.L. Payne & Associates fax 696-8114 FROM: Natalie Ruiz, Development Coordinat SUBJECT: Courtyard by Marriott -Site Plan Staff reviewed the above-mentioned site plan as requested; however, staff was unable to perform a complete site plan review. The following page is a list of preliminary staff review comments detailing items that need to be addressed. Please address the comments and provide a complete submittal for further staff review. Submit ten complete sets of revised site plans by an established deadline date for processing. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Village Hotel Partners, Via fax 696-0601 Case file #00-60 C s~ s~ ~ e-` ~v~ ~t C°~::r` `F ~,;,; ,~,C~ I _ `` _ q~-~ ~~u,~_ ~~~. ~2 Home of Texas A&M University ~~~IA CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 /Fax (979) 764-3496 MEMORANDUM October 27, 2000 TO: Robert Payne, R. L. Payne & Associates, Via fax 696-8114 FROM: Bridgette George, Asst. Development Coordinator SUBJECT: CourtyardbyMarrrott - SltePlarl Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $100 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: Two (2) complete sets construction documents for the proposed development with the revised site and landscaping plans. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Village Hotel Partners, Via fax 696-0601 Case file #00-60 Home of Texas A&M University STAFF REVIEW COMMENTS No. 1 Project: MARRIOTT COURTYARD (SP)-SITE PLAN (0-60) This review has been stopped. The next submittal for this project will be subject to a full review. Although these comments do not constitute a full review, staff has identified the following issues: PLANNING 1. Not all plans are the same. Some details change from plan to plan. All plans must be consistent for a site review. 2. Fire lanes need to be designated and their details shown. 3. According to the landscape plan, landscaping requirements will not be met. The points were miscalculated. Three-inch canopy trees are worth 150 points each, not 300. Reviewed by: Molly Hitchcock Date: August 3, 2000 ENGINEERING 1. Please include a table of estimated flow data (minimum, average, maximum) for domestic water and sewer. 2. If there is the need for an irrigation line, a tap must be shown on the plans and estimated flow data included. The irrigation line will require a meter followed by a private backflow preventer. The line must be in a PUE up to the meter. 3. The domestic water line coming off the loop must be separate from the fire line. Only the domestic line will need a meter. They must both be in a PUE up to the building. The private sewer need not be in the PUE. 4. TNRCC regulations require a 9'-0" separation between a manhole and a water line. The plans call for 9'-0" minimum separation on pipe lines. This may not provide the necessary separation at the manhole. Reviewed by: Spencer Thompson Date: 08/04/00 Staff Review Comments Page 1 of 2 ELECTRICAL 1. Developer responsible for installing conduit per city spec and design. 2. Developer responsible for pouring transformer pad per city spec and design. 3. Developer responsible for providing easements to cover all primary electrical lines and equipment. 4. CT's and Metering will be on the transformer. 5. **Developer MUST provide a Temporary Blanket Easement (or) Easement by Description before ANY UTILITY CONSTRUCTION BEGINS (see attached Easement Dedication Sheet). Reviewed by: Jennifer Reeves Date: NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City will constitute a completely new review. Staff Review Comments Page 2 of 2 l~ STAFF REVIEW COMMENTS No. 3 PROJECT: MARRIOTT COURTYARD (SP)-SITE PLAN (0-60) PLANNING ~"_ II~~~u1 ~° 1. On the site plan, please add the owner's name of the C-1 property west of the subject site (Lot 1). Reviewed by: Molly Hitchcock Date: November 14, 2000 ENGINEERING 1. No Comments ,~ Reviewed by: Spencer Thompson Date: 11 /3/00 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City will constitute a completely new review. Staff Review Comments J: \PZTEXT\PZ03918. DOC Page 1 of 1 STAFF REVIEW COMMENTS No. 2 Project: MARRIOTT COURTYARD (SP)-SITE PLAN (0-60) PLANNING 1. Please include the legal description of the property in the title block. 2. The name, address, and telephone number of the developer/owner needs to be included in the title block. 3. The ownership and current zoning of the subject p arcel and all abutting parcels needs to be shown on the site plan. 4. If a 100-year floodplain/floodway is not on or adjace nt to the site, please add a note to this effect citing the appropriate inform ation. 5. The number of rooms needs to be included with the parking information to verify how many parking spaces are required. 6. Please note: the location of the proposed access ea sement may need to be moved or adjusted and will need to be coordinat ed with the design on the Rock Prairie Road extension. Due to the close proximity to the Rock Prairie/frontage road intersection, it would not be a ble to be located at a median opening using its proposed location. The ac cess easement would be better located further east. 7. Water meters need to be in a PUE. 8. Please show the square footage of the pool hous e and its associated buildings. 9. Please indicate curb leave-outs where ramps a re used to access sidewalks. 10. The fire lane needs to be extended so the Fire Depa rtment can reach the FDC and the hydrant at the back of the property. Consideration also needs to be given to how the trucks can exit the pro perty-extra fire lane may need to be designated for this purpose. 11.If the Landscape Plan turned in with this site plan is to be considered, please remove the note in the "Landscape Requirements" that the Landscape Plan will be submitted at a later date. 12. The project has frontage on Woodcreek Drive which is a minor collector. Streetscaping is required. 13. The symbols for existing trees were not included or faded completely out when copied. 14. Please show the existing tree barricade plan. 15. By ordinance, Live Oaks are required to be separated from other Live Oaks by 35 ft. Staff Review Comments Page 1 of 2 16. There is a concern with the placement of the crepe myrtles at the front of the hotel. Please include that water line on the landscaping plan to show there is no conflict between landscaping placement and utility locations. Reviewed by: Molly Hitchcock Date: October 27, 2000 ENGINEERING 1. Please ensure that the information referring to the 18" waterline on the profile view on Sheet C-9 is correct. 2. The pond and piping design is shown on the plans, however, the final approval is subject to review and approval of the project drainage report. Reviewed by: Spencer Thompson Date: 10/17/00 MISCELLANEOUS: 1. Contractor responsible for testing all back flows devices, as required, upon installation. Test report originals to be sent to City of College Station Water Department. 2. Any chemical sanitizer hooked directly to water system must be protected against back flow device. All back flow devices must be installed as per AWWA standard. 3. Back flow protector required and fire sprinkler system. Installed as per AWWA and USC FCCAR. Device tested upon installation. 4. Any irrigation installed for landscaping must be protected by back flow device. City of College Station requires either a pressure vacuum breaker or reduced pressure device installed as per AWWA standards and tested upon installation. 5. Pool fill line must have proper back flow protection, air gap or back flow devices installed as per AWWA standards. Reviewed by: Rob Werley Date: 10-25-00 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City will constitute a completely new review. Staff Review Comments Page 2 of 2 November 16, 2000 TO: Robert Payne, CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM FROM: Bridgette George, Asst. Development Coordinator SUBJECT: - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the attached comments and submit the following information for further staff review: Two (2) revised site and landscaping plans (additional sets will be required once the plans have been approved); $100 processing fee for the next round of three (3) staff reviews; and, If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Case file # Home of Texas A&M University