CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 /Fax (979) 764-3496
MEMORANDUM
August 5, 2000
TO: Davis M. Young, Pebble Creek Development Co., via fa 690-6081
FROM: Bridgette George, Asst. Development Coordinator
SUBJECT: Pebble CreekPhase 8-C - Frnal Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information by Monday, August 15, 10:00 a.m. to be placed on the next
available Planning and Zoning Commission meeting scheduled for September 7, 2000, 7:00
p.m. in the City Hall Council Chambers, 1101 Texas Avenue.
Ten (10) copies of the revised final plat; and
The Mylar original of the revised final plat with the owner's signature.
If you have any questions or need additional information, please call me at 764-3570.
Attachments: Staff review comments
cc: The Wallace Group, Via fax (254) 776-2924
Case file #00-59
Home of Texas A&M University
MEMORANDUM
September 11, 2000
TO: Planning and Zoning Commission
FROM: Jessica Jimmerson
SUBJECT: Final Plat for Pebble Creek Phase 8-C
Item: Consideration of a Final Plat of approximately 18.17 acres for Pebble
Creek Phase 8-C located south of Phase 8-B and Phase 8-A, adjacent to the
College Station Business Center. (00-59)
Applicant: The Wallace Group
Item Summary: The Final Plat complies with the Land Use Plan, which shows
this area as single family medium density. The Commissio n approved the
preliminary plat for this area in March of this year. In 1998 , the developer
submitted a revised master development plan and master utility layout. This
Final Plat complies with the preliminary plat and the maste r plan, as well as, the
current zoning classification of this property, which is R-1, Single Family
Residential.
Staff Recommendation: Staff recommends approval of the plat.
Attachments:
1. Area map
2. Application
3. Copy of Final Plat
J:U'ZTEXT1PZ03589.DOC Page 1 of 1
STAFF REVIEW COMMENTS
No. 1
Project: PEBBLE CREEK PH. 8-C (FP)-FINAL PLAT (0-59)
PLANNING
1. Easements adjacent to lots 70, 79 and 80 need to be drainage and utility
easements as per the preliminary plat.
2. The off site easements will need to be recorded at the same time as or
before this plat can be filed at the courthouse.
3. The 10 foot easement along the edge of the subdivision will need to be
filed as separate easement as well.
4. The 10 foot easement along the rear of the lots adjacent to Phase 8-A,
either need to be shown with volume and page or not in shadow similar to
the other easements being dedicated with this plat.
5. The graphic of the floodplain and the floodplain note do not match. Why is
the location of the floodplain shown different on the final plat from the
preliminary plat?
Reviewed by: JESSICA JIMMERSON Date: 8/3/00
ENGINEERING
1. No comments.
ELECTRICAL
1. No comments
Reviewed by: Jennifer Reeves Date: 8/4/00
LAND MANAGEMENT
1. Remove the "s" on Plum Hollows to read Plum Hollow.
Reviewed by: Melissa Rodgers Date: 8/4/00
NOTE: Any changes made to the plans, that have not been requested by the
City of College Station, must be explained in your next transmittal letter and
"bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.
J:\PZTEXT\PZ03502.DOC Page 1 of 2