Loading...
HomeMy WebLinkAboutStaff CommentsCOLLEGE STATION P. O. Box 9960 1101 Texas Avenue College Station, TX 77842 Tel: 409 764 3500 MEMORANDUM April 5, 2000 TO: Greg Taggart, MDG, Via fax (979) 693-5359 FROM: Bridgette George, Asst. Development Coordinator SUBJECT: Ramsey Twins Subdivison -Preliminary Plat Staff reviewed the above-mentioned preliminary plat as request. is a list of staff review comments detailing items that need to address the comments and submit the following information by P a.m. to be placed on the next available Planning and Zoninc scheduled for April 20, 2000, 7:00 p.m. in the City Hall Council Avenue. Ten (10) copies of the revised preliminary plat; and The Mylar original of the revised preliminary plat. ~d. The following page be addressed. Please Monday, April 10, 10:00 ~ Commission meeting chambers, 1101 Texas If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments Electrical & W/WW comments Preliminary Plat with Redlines (please pick up at Development Services) cc: Frank Ramsey, c/o Jim Woods, J.H.W. Contractors, Via fax (979) 846-9133 Case file #00-58 Home of Texas A&M University 04/06/00 09:34 $409 764 3496 DEVELOPMENT SVCS STAFF REVIEW COMMENTS No. 1 Project: RAMSEY TWINS SUBDIVISION (0-58) I~J00] /001. Provide deeds or other documentation to verify that the property was in this configuration prior to 1970, and is not part of a larger parent tract that would need to be included in the preliminary plat. ~-~~' Provide sewer service through Lot 1 to the property on the west side of the ~ ~, _ . subject tract. G' Are there any other existing structures on the property? Where is the property line located between Tract E to the east of the subject property and the First Baptist Church Property? Several of the surrounding properties are not identified as platted or not platted. ~13~Building setbacks do not need to be shown on plats. FYI -The building setback for the entire length of the frontage of both lots is 25ft. The corner of the building that encroaches into the building setback is considered legally nonconforming. FYI - Please be aware that, because of the M-1 zoning, when these lots develop, "Not only site design and layout, but facades, materials, lighting and apparent architectural aspects of the project are subject to review and approval." Reviewed by: JESSICA JIMMERSON Date: 4-Apr-00 J:IPZTEXT1PZ02883. DOC Page 1 of 7