Loading...
HomeMy WebLinkAboutStaff Comments L 0J -7 CITY OF COLLEGE STATION `,•� DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 COLLEGE STATION Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM December 19, 2000 TO: Danny Miller, Longaro & Clarke, Inc., Via fax (512) 306 -0338 FROM: Bridgette George, Assistant Development Review Manager •', SUBJECT: DP- FAIRFIELD AT LUTHER (0- 500027) Staff reviewed the above - mentioned project as requested. Please address the attached comments and submit the following for further staff review and approval of the documents: Six (6) sets of construction documents Development permit application and minimum submittal requirements Please call Spencer Thompson or myself if you have any questions. & -`ro-i4 I Home of Texas A &M University . 4 STAFF REVIEW COMMENTS No. 1 Project: DP- Fairfield at Luther (00 -27) ENGINEERING 1. The erosion control sheet EC -0 is acceptable. Please submit the actual construction set(s) to be stamped. This should includeEC -0, Sheet 3/39 (EC details), and any other grading sheet(s) you wish to include. 2. This project will need three development permits: 1) apartment site, 2) street construction, and 3) lift station. Each will need an erosion control plan. Sheet EC -0 9/39 is the approved erosion control plan for the apartment site Building Permit. Each permit can be separated into "Clearing and Grading" and "Full" Development Permit. A Clearing and Grading Permit will be issued for the apartment phase when the construction plan sets have been stamped approved. 3. There is still one issue yet to be addressed. The culvert, which is downstream of this site and crosses FM 2818, contained 2' -3' of silt the last time it was checked. Since this project is depending on drainage through this culvert, please contact TXDOT to correct this problem. TXDOT contact information is Neal Munn or Ronnie Waller at 979 - 778 -8054. Reviewed by: Spencer Thompson Date: 12/15/00 If you have any questions, please contact me at 979 - 764 -3570 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 1 of 2 STAFF REVIEW COMMENTS No. 2 Project: DP- Fairfield at Luther (00 -27) ENGINEERING These comments are from my review of your latest submittal. Please apply these comments to your redesign where applicable. 1. Sheet 6 of 17. There are notes on several sheets for a "STD Curb Inlet ". I did not see a "standard" inlet detail. Please ensure the applicable detail has the same wording/ name as the drawing note. 2. After speaking with several staff members it has been concluded that the sidewalk between this project and Melrose will not be required with the construction Luther Street. Please ignore any redline comments concerning this. 3. Please show any curb inlets on street plans such as Sheets 7 and 8. 4. Sheet 9. Please ensure that the information for Line B at Line A on the profile view agrees with the plan view. 5. Please include manholes on storm sewers where applicable (300 ft max). 6. Storm sewers under street pavement must be embedded with cement stabilized sand. Include note and/ or detail. 7. All storm sewers accepting runoff from Luther Street will become City infrastructure. Reviewed by: Spencer Thompson Date: February 1, 2001 If you have any questions, please contact me at 979- 764 -3570 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments J: \PZTEXT\PZ04258. DOC STAFF REVIEW COMMENTS No. 4 Project: FAIRFIELD @ LUTHER (SP) -SITE PLAN (0 -83) PLANNING 1. On the dumpster detail on page 37, please show an 8 ft. screening wall. 2. Please provide Knox Box information in the notes on page. A note similar to the following is acceptable: Location of Knox Box to be approved by Fire Marshal before installation. Order and purchase of Knox Box should be coordinated though the Fire Marshal. 3. Please provide water demands and sewer loadings for the Leasing Office /Clubhouse on page 8. Is the information provided the averages or maximums? 4. NOTE: The tract was zoned to PDD -H on February 10, 2000 (see page 1 note #2). Reviewed by: MOLLY HITCHCOCK Date: February 14, 2001 ENGINEERING 1. Sheet 9/17 on Street drawings. Reviewed by: Spencer Thompson Date: February 14, 2001 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City will constitute a completely new review. Post -it® Fax Note 7671 Date a I, (pages■ To l � Frorri - �X_n Co. /Dept. Co. Phone # Phone # Fax# Fax # Staff Review Comments Page 1 of 1 P ,,\~ STAFF REVIEW COMMENTS No. 1 Project:: FAIRFIELD AT LUTHER (PP) (0-40) General 1. Include title block information as per submittal checklist (subdivider information, name of subdivision, preparation date, etc.). Is the name of the Subdivision to be "Fairfield at Luther"? 2. Select lot and block number of subdivision (i.e . Lot 1, Block 1). 3. Indicate the zoning of surrounding properties t o the northwest (TAMU- C-U) and southwest across FM 2818 (R-1 ). 4. The preliminary plat should not show trees or existing buildings to be removed. The plat should show easements (l ight), elevations (light) and utilities (dark) and outline of subdivision ( dark). 5. Locate and show gas pipelines along souther n boundary as indicated on plans. Note content of pipeline. 6. Developer needs to provide a 10' easement a ll around the property, except for the south side of the property that n eeds a 20' easement. Developer needs to provide easements to cov er primary electric lines and equipment that will be going on this prope rty. 7. On-site septic systems must be abandoned b efore water lines are installed. Streets 8. The City will not be party to ensuring street im provement payments due the developer from another developer as noted on page 7 of 7 of the impact study. Any private agreement is so lely between the two parties. 9. Please note on plans that the Luther Street cr oss section is to match existing improvements. Drainage 10. Will the drainage easement be excavated or landscaped in any way? The developer must determine 404 permitting requirements, if any. 11. Further demonstrate that the 60" storm water culvert is adequate to handle flows in excess of 300 cfs with headwa ter elevation at 297.91. 12. Show on plans the storm sewer extension alo ng Luther and the expected downstream flow route. Will a storm drain from Luther discharge through this site? If so, indicate ap proximate location for private drainage easement. Staff Review Comments Page 1 of 1 Water (as dicussed with Danny Miller 2/29/00) 13. Continue 16" waterline to 2818, install fire hydrant at corner of 2818 and Luther and cap line for future extension. Fire hydrants on the northwest side can be supplied from this line by means of lateral feeds. 14. Locate 8" water line stub-out to access adjacent property at Fairfeild/ Gorzycki/ 2818 corner. This will eliminate 15. The City does not allow 10" water lines and therefore 10" lines are not an option for OP. Sewer (as discussed with Danny Miller 2/29/00) 16. The 8" sewer at Melrose is inadequate to carry sewer flows from this development in addition to the already expect ed flows from the Melrose complex. Options: a) The required lift station will be constructed on private property and access the existing se wer (15") along 2818 to the east through an easement on th e adjacent property. If this option is selected, the constructed sewer will be considered private and sewer billing from the City will be to the property owners or agent and no t to individual occupants. b) The lift station is to be built as per C ity Master Plan requirements. If this option is select ed, the constructed sewer will be public and sewer billin g from the City will be to the individual users. The City will p articipate in the construction costs. Please submit a letter outlining the understanding of these options with the return of the Reviewed by: JEFF TONDRE, SPENCER THOMPSON Date: 4-Dec-00 Staff Review Comments Page 2 of 1 STAFF REVIEW COMMENTS No. 1 Project: FAIRFIELD @ LUTHER-WILLIAMS ADD'N (FP) (0-71) PLANNING 1. Since you are final platting off the Preliminary Plat, the Preliminary Plat needs to be updated. The Mylar I have reviewed shows very few of the PUE's for waterlines and drainage. It also shows the easement for the forcemain onto Gorzycki. So, please submit an updated Preliminary. In addition, the construction plans show a 20' easement on the east side/ 10' front, whereas the preplat shows the 20' on the front/ 10' east. City staff from electrical stated the 20' on front was the correct one (?). 2. Please submit an updated Final Plat. Using the updated Preliminary, remove elevation lines, zoning refs, building lines, and utility lines and it should be good. The final plat be will formally reviewed when it is submitted 3. How will electrical easements be addressed? Reviewed by: Spencer Thompson ~/ Date: December r , 2000 ELECTRICAL 1. Developer installs conduit, transformer pads & j-boxes /pull boxes per city specs and design. (provide 30 ft. of rigid conduit per riser pole) 2. Developer provides temporary blanket easement for constru ction purposes and necessary meet & bound descriptive easement upon compl etion of project. 3. Need electric load information as soon as possible so that w e may order transformers for project. (current delivery time is 20 to 26 w eeks) 4. Need digital (AutoCAD version) site plan, E-mail to tmichals Ca~ci.college-station.tx.us. 5. As soon as we receive the digital site plan we will do the ele ctric layout and provide it back to developer for installation. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Staff Review Comments Page 1 of 1 J:\PZTEXT\PZ04024.DOC CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 /Fax (979) 764-3496 MEMORANDUM December 29, 2000 TO: Danny Miller, P.E., Longaro & Clarke, Inc., Via fax 512-306-0338 FROM: Bridgette George, Asst. Development Review Manager SUBJECT: W111ramsAddltlon-FrralPlat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Thursday, January 4, 10:00 a.m. fo be placed on the next available Planning and Zoning Commission meeting scheduled for January 4, 2001, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Ten (10) copies of the revised final plat; and The Mylar original of the revised final plat with the owner's signature. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Paul Johnston, Fairfield Residential, Via fax 817-640-9474 Kling Engineering, Via fax 846~6zz1-~~~5a Case file #00-71 Home of Texas A&M University ENGINEERING REVIEW Isle] LVA lLVA IALl11&MLlrem1 Project. Fairfield at Luther, Williams Addition, College Station, TX Issue: Final Plat General Comments: The following comments have a direct impact on the final platting of this property. Layout of the water line directly impacts easement location and thus must be approved in order to place easements on the Final Plat. Sewer issues for this project have not been resolved to date. City of College Station staff will recommend denial of the final plat if this issue is not finalized. The developer has the option to withdraw plat consideration before the Planning and Zoning Commission meets. Specific Comments: Tee off water line branches with domestic services and meters before fire hydrants. It is our understanding that these buildings will include a fire sprinkler system. Fire sprinkler piping must come off the water main and be included in an easement up to the building or backflow preventer whichever comes first. They need not be metered. Example: Fire hydrant 6" Fire sprinkler line to bldg in easement Domestic water with meter Water Include profiles of all water lines. .Include conflicts with other utilities on profile drawings of water lines Water line drawings need some attention to clear up discrepancies; see drawings for redline comments. Include blow -off assemblies at end of water main locations. Reviewed by: Spencer Thompson Date: 27 -Jun -14