HomeMy WebLinkAboutApplicationCITY OF COIJ.I3CE STATION
Home of Texas A&M University'
0��
SITE PLAN APPLICATION
GENERAL
FOR OFFICE USE ONLY
CASE NO.: ` �/
DATE SUBMITTED:'15 'IUo `I y
TIME: (A:30
STAFF:
MINIMUM SUBMITTAL REQUIREMENTS:
❑x $932 Site Plan Application Fee.
Fx� $350 Non -Residential Architectural Standards / Northgate Building Review Application Fee (if applicable).
FX -1 $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is
1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is
due prior to the issuance of any plans or development permit).
0 Application completed in full. This application form provided by the City of College Station must be used
and may not be adjusted or altered.
n Six (6) folded copies of site plan.
n One (1) folded copy of the landscape plan.
0 One (1) copy of the following for Non -Residential Architectural Standards building review or Northgate
Building Review (if applicable).
Ox Building elevations to scale for all buildings.
❑x A list of building materials for all facade and screening.
Ox Color samples for all buildings or list colors to be used from the approved color palette.
Ox Electronic copy of Site Plan e-mailed to csuelectdesign@cstx.gov.
x0 Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
Fx Two (2) copies of the Public infrastructure plans and supporting documents (if applicable).
n Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the
proposed request (if applicable).
0 The attached Site Plan Non -Residential Architectural Standards Building Review and Northgate Building
Review checklists (as applicable) with all items checked off or a brief explanation as to why they are not
check off.
Date of Optional Preapplication or Stormwater Management Conference 03-05-14
NAME OF PROJECT TDC Once Building
ADDRESS 1598 Copperfield Drive
LEGAL DESCRIPTION (Lot, Block, Subdivision) Lot 6R-1 Crescent Pointe Phase 2
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project):
Name Klunkert Construction, Inc. - Matt Klunkert E-mail mattk@klunkert-inc.com
Street Address 1722 Broadmoor, Suite 222
City Bryan
Phone Number 979.731.8584
PROPERTY OWNER'S INFORMATION:
Name TDC Properties LLC
Street Address
City Bryan
Phone Number
Revised 4/14
45nn Carte Creek Parkwaz Ste. 201
State Texas
Zip Code 77802
Fax Number 877.329.5615
E-mail ronnie@tdccpa.com
State Texas
Fax Number
Zip Code 77802
Page 1 of 11
ARCHITECT OR ENGINEER'S INFORMATION:
Name Schultz Engineering, LLC - Deven Doyen, P.E.
Street Address 2730 Longmire Drive, Suite A
City College Station
Phone Number 979.764.3900
OTHER CONTACTS (Please specify type of contact):
E-mail deven@schultzengineeringllc.com
State Texas Zip Code 77845
Fax Number 979.764.3910
Name E-mail
Street Address
City State Zip Code
Phone Number Fax Number
Current zoning
Present use of property Vacant
Proposed use of property Oflfce
Number of parking spaces required 45 Number of parking spaces proposed 59
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? r; Yes rl No
This information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
Yes
F- No
If yes, provide information regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name:
City Project Number (in known):
Date / Timeframe when submitted:
Page 2 of 11
Revised 4114
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re -issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Property Owner(s) e.oN r>` CRAT , Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin. F
3. The information and conclusions contained in the attached plans and supp ?$y mply with the
current requirements of the City of College Station, Texas City Code, Ch hs•a as�,� BCS Unified
Design Guidelines. All development has been designed in accordance 341 aple cox d ordinances
of the City of College Station and State and Federal Regulations. •••.....••••••••�••�`•••••
4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEME S• • ••,jF• CHMENTS
FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE B 9ichF: ,TRUE, AND
ACCURATE. 9n `._L �.,....�•�?
Engineer Date
Revised 4/14 Page 4 of 11
The following CERTIFICATIONS apply to development in Special Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only
Permits:*
A. I, certify, as demonstrated in the attached drainage study, that the
alterations or development covered by this permit, shall not:
(i) increase the Base Flood elevation;
(ii) create additional areas of Special Flood Hazard Area;
(iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor
(v) increase Base Flood velocities.
beyond those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances.
Engineer Date
Initial
* If a platting -status exemption to this requirement is asserted, provide written justification under separate
letter in lieu of certification.
Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits:
B I , certify to the following:
(i) that any nonresidential or multi -family structure on or proposed to be on this site as part of this application is
designed to prevent damage to the structure or its contents as a result of flooding from the 100 -year storm.
Engineer Date
Additional certification for Floodway Encroachments:
C. I, , certify that the construction, improvement, or fill covered by this
permit shall not increase the base flood elevation. I will apply for a variance to the Zoning Board of Adjustments.
Engineer
Revised 4/14
Date
Page 5 of 11
Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate
required).
Residential Structures:
D. I, , certify that all new construction or any substantial improvement
of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an
elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre -pour) and post construction.
Engineer / Surveyor
Commercial Structures:
Date
E. I, , certify that all new construction or any substantial improvement
of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all
utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation
Engineer / Surveyor Date
OR
1 , certify that the structure with its attendant utility, ductwork,
basement and sanitary facilities is designed to be flood -proofed so that the structure and utilities, ductwork,
basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions.
Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
Engineer / Surveyor
Conditions or comments as part of approval:
Date
Page 6 of 11
Revised 4/14