Loading...
HomeMy WebLinkAboutStaff Comments CITY OF COLLEGE STATION ‘_/ DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM February 28, 2003 TO: Veronica J. B. Morgan, Mitchell & Morgan, L.L.P., Via fax 260-3564 FROM: Bridgette George, Assistant Development Manager SUBJECT: GATTITOWN/ H.E.B STORE (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the site plan: Six (6) revised site plans. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Jodie Kirksey, H.E. Butt Store Property Company No. One, Via fax 210.938.7788 Case file #03-00500056 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: GATTITOWN/ H.E.B STORE (SP) — 03-00500056 PLANNING 1. End island and interior islands are required to be a minimum of 180-sq.ft. there are several that do not meet this requirement. 2. The two existing interior islands to be removed will need to be relocated. For every 15-parking spaces a 180-sq.ft.interior island is required. 3. The two parallel parking spaces that are shown will not be allowed, as they are located adjacent to the loading dock. 4. The end islands that are between parking spaces 38 & 39 need to be the same length as the parking spaces. 5. The enclosure located closest to the NW corner of the old HEB is facing straight into a curb only 25 feet away. The collection vehicles are longer. This will need a relocation or major angle of approach change, per Pete Caler, Sanitation Superintendent. Reviewed by: Jennifer Reeves Date: 02-27-03 ENGINEERING 1. N/A Reviewed by: Carol Cotter Date: 02-28-03 ELECTRICAL 1. No comments. Reviewed by: Ronnie Bolin Date:2-27-03 NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 2