CITY OF COLLEGE STATION
`� DEVELOPMENT SERVICES
1 1101 Texas Avenue South, PO Box 9960
COLLEGE STATION College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
March 3, 2003
TO: Louise Fischer, Kerr Surveying, Via fax 691-8904
FROM: Bridgette George, Assistant Development Manager
SUBJECT: CARTER'S GROVE, SECOND INSTALLMENT (FP) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Monday, March 10, 10:00 a.m., your
project will be placed on the next available Planning and Zoning Commission meeting
scheduled for, air 23, 2003, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas
Avenue. ik(°vv-3
$100 fee for a variance to the Subdivision Regulations;
Two (2) copies of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart@ci.college-station.tx.us
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have
not been addressed your project will be pulled from the scheduled Planning & Zoning
Commission Agenda. Your project may be placed on a future agenda once all the revisions
have been made and the appropriate fees paid. If you have any questions or need additional
information, please call Brett McCully or myself at 764-3570.
Attachments: Staff review comments
cc: Clifford Fry & Don House, 100 Shady Drive, College Station, TX, 77840
Case file #03-00500054
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: CARTER'S GROVE, SECOND INSTALLMENT(FP) - 03-00500054
ENGINEERING
1. Variance request and fee are required to Ordinance Chapter 9, Section 18 for lot
frontages in older residential subdivisions.
2. Suggest designating resulting parcels as 'lots' instead of 'tracts' to preclude
assumption of more intense subdivision in future.
3. Please include utility easement dedication to extend use of existing easement on
existing Lot C, Block A across 20' section of new Tract 1B to new Tract 1A.
4. Please include note describing to whom the private utility easement(s) are being
granted.
5. Please verify that no private access easement is desired on Tract 1A for the benefit
of Tract 1B.
6. Please include dedication of remaining cul-de-sac ROW on Shady Lane.
Reviewed by: BRETT A MCCULLY Date: March 3, 2003
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of#4 rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
5. Developer provides digital AutoCAD 2000i version of plat and/or site plan.
email to rbolin(a�ci.college-station.tx.us
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
Reviewed by: Ronnie Bolin Date:2-27-03
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review.