April 14, 2003
TO: Paul Wright, 1427 Andover Court, College Station, TX, 77845
FROM: Bridgette George, Assistant Development Manager
SUBJECT: POST OAK FOREST, PHASE ONE (FP) - Final Plat
Staff reviewed the above-mentioned final plat as requested and has determined it to be
an amending plat. The following page is a list of staff review comments detailing items
that need to be addressed. Please address the comments and submit the following
information for the final plat to be filed at the Brazos County Courthouse:
One (1) copy of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart@ci.college-station.tx.us
If you have any questions or need additional information, please call Carol Cotter or
myself at 764-3570.
Attachments: Staff review comments
cc: Stewart Kling, Kling Engineering & Surveying, Via fax 846-8252
James L. Way, 1000 Northpoint #1103, San Francisco, CA 94109
Arlette Hill, 19 Forest Drive, College Station, TX 77840
Timothy J. Rabroker, 20 Forest Drive, College Station, TX 77840
Clyde E. Cole & Jane Cole, 21 Forest Drive, College Station, TX 77840
Paul A. Wright & Carolyn Wright, 1427 Andover Ct., College Station, TX 77845
Case file #03-00500090
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: POST OAK FOREST, PHASE ONE (FP) - 03-00500090
ENGINEERING
1. Because you are not dedicating any new public utility easements and only adjusting
lot lines, this plat can be an Amending Plat, that is approved at staff level. Remove
"Approval of Planning and Zoning Commission" certification.
2. The plat you turned in showing the "Existing Conditions" can be used as the survey
of the property. Amending Plat format shows how the property was originally platted
(only what was on original plat) with any instruments to date, and the Amending Plat.
Change the "Existing Conditions" to "Original Plat"
Reviewed by: Carol Cotter Date: April 14, 2003
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of#4 rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
5. Developer provides digital AutoCAD 2000i version of plat and/or site plan.
email to rbolin(a�ci.college-station.tx.us
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
Reviewed by: Ronnie Bolin Date: 4-9-03
NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review.
Page 2 of 2
STAFF REVIEW COMMENTS NO. 1
Project: POST OAK FOREST, PHASE ONE (FP) - 03-00500090
ENGINEERING
1. Because you are not dedicating any new public utility easements and only adjusting
lot lines, this plat can be an Amending Plat, that is approved at staff level. Remove
"Approval of Planning and Zoning Commission" certification.
2. The plat you turned in showing the "Existing Conditions" can be used as the survey
of the property. Amending Plat format shows how the property was originally platted
(only what was on original plat) with any instruments to date, and the Amending Plat.
Change the "Existing Conditions" to "Original Plat"
Reviewed by: Carol Cotter Date: April 14, 2003
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of#4 rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
5. Developer provides digital AutoCAD 2000i version of plat and/or site plan.
email to rbolin@ci.college-station.tx.us
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
Reviewed by: Ronnie Bolin Date: 4-9-03
NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review.
Page 2 of 3