Loading...
HomeMy WebLinkAboutStaff Comments • CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM February 28, 2003 TO: Mike Tomchesson, Via fax 696.5045 FROM: Bridgette George, Assistant Development Manager SUBJECT: SOUTHWOOD VALLEY SECT 19, L2R, B14C (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and return the following for the plat to be filed at the Brazos County Courthouse: One (1) copy of the revised final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart@ci.college-station.tx.us If you have any questions or need additional information, please Carol Cotter or myself at 764-3570. Attachments: Staff review comments cc: Christian A. Galindo Via fax 846-8868 Case file #03-00500048 Home of Texas A8&M University STAFF REVIEW COMMENTS NO. 1 Project: SOUTHWOOD VALLEY SECT 19, L2R, B14C (FP) - 03-00500048 ENGINEERING 1. Existing 20' PUE along southern boundaries of Lots 1 and 2R of Existing Plat measure 30' graphically. Please rectify. Reviewed by: Carol L. Cotter Date: February 28, 2003 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of#4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 14 version of plat and/or site plan. email to rbolin(a�ci.college-station.tx.us 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines. Reviewed by: Ronnie Bolin Date:2-20-03 NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 2