Loading...
HomeMy WebLinkAboutStaff Comments CITY OF COLLEGE STATION coiDEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM March 17, 2003 TO: Edward Froehling, Via fax 774.0565 FROM: Bridgette George, Assistant Development Manager SUBJECT: SHENANDOAH SUBDIVISION, PHASES 8-15 MDPLAN Staff reviewed the above-mentioned master development plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, March 24, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for Thursday, April 3, 2003, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Ten (10) copies of the revised master development plan; One (1) Mylar original of the revised master development plan; and, One (1) copy of the digital file of the master development plan on diskette or e-mail to nmanhart@ci.college-station.tx.us Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Spencer Thompson or myself at 764-3570. Attachments: Staff review comments cc: Michael McClure, McClure Engineering Inc., Via fax 693-2554 Case file #03-00500068 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: SHENANDOWH SUBDIVISION, PHASES 8-15 - 03-068 ENGINEERING 1. Are there any anticipated OP requests? 2. Continuation of the FEMA floodplain is required for this portion of Spring Creek, LOMR. Reviewed by: Spencer Thompson Date: March 13, 2003 PLANNING 1. Please clarify in the title block that the plan is for Phases 8-15. 2. Please label the different phases. 3. The 3.273-acre tract labeled as PUD-2 did not meet the platting and development deadline requirements of the PUD zoning district, and reverted back to its original zoning of A-O. Please show the land as A-O and call out the planned zoning district. 4. The green belt area is shown on the Comprehensive Plan as Floodplain/Streams. Please show this as a land use to remain A-O. Proposed rezoning of areas conflicting with the LUP is usually not supported by Staff. 5. To mirror the terminology of the Comprehensive Plan, please identify the land uses in General Note #6 as Single Family Residential Medium Density, Park, Floodplain/Streams, Office, etc. 6. It appears the creek centerline has been mislabeled in the legend. Please correct. 7. Please show C-1 zoning on KTH toward SH 6 and the R-1 zoning of the property to the west. Reviewed by: Molly Hitchcock Date: March 13, 2003 ELECTRICAL 1. Developer installs conduit as per city specs and design. 2. Developer installs street lighting as per city specs and design. 3. Developer provides 30' of#4 rigid conduit for riser pole(s). 4. Developer installs pull boxes as per city specs and design. (pull boxes provided by the city). 5. Developer provides digital AutoCAD 2000i version of plat and/or site plan. Email to rbolinci.college-station.tx.us. 6. Developer provides temporary blanket easement for construction purposes. 7. Developer provides easements for electric infrastructure as installed for all electric lines (including street lighting). Reviewed by: Ronnie Bolin Date: 3-12-03 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and `bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. STAFF REVIEW COMMENTS NO. 2 Project: SHENANDOAH SUBDIVISION, PH 8-15 (MDP) - 03-068 PLANNING 1. As you have commented, the phasing of the property is appropriate for the preliminary plat; but as it is a MDP for only a portion of the Shenandoah Subdivision, it will be necessary to clarify this project (using phase numbers or a different subdivision name) in the title block. Reviewed by: Molly Hitchcock Date: March 25, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2 In response to ELECTRICAL Review Comments dated March 13, 2003: I am not sure how to respond to these comments. This information does not seem to be applicable at this stage. Can the digital files submitted to Nanette be shared with the Electrical Department? Attached please find Ten (10) copies of the revised Master Development Plan and One (1) Mylar original of the revised Master Development Plan,for your use. One(1)copy of the digital file of the Master Development Plan has been e-mailed to NmanhartAci.college-station.tx.us. It is my understanding that this project will be placed on the Planning and Zoning Commission meeting scheduled for Thursday, April 3, 2003, 7:00 PM in the City Hall Council Chambers, 1101 Texas Avenue. Should have any questions or require additional information regarding this submittal, please do not hesitate to call. Very truly yours, /<<G M. hael R. cClure, '.E., R.P.L.S. MRM/gsm