HomeMy WebLinkAboutStaff Comments 07/16/04 10:57 t-2979 846 8252 KLING ENGINEERIN -f-'- COCS MORGAN ETAL _ fj. 003 STAFF REVIEW COMMENTS Project: DP-GATEWAY PHASE 2 & 4 - 04-00100036 ENGINEERING & PLANNING 1. The items that have been submitted require Site Plan approval. A request for a Development Permit is only pertinent after a Site Plan has been approved. 2. This item has not been fully reviewed at this time due to Comment #1. Staff has not received a Site Plan to date. Therefore, this item is being returned to you. No design comments are provided at this time. Reviewed by: Spencer Thompson Date: July 15, 2004 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. • u l; 202 cc: Case file #03-00500069 STAFF REVIEW COMMENTS NO. 1 Project: GATEWAY SUBDIVISION PHASE 2-4 - 03-00500069 ENGINEERING 1. Please include the entire parent tract of the subject property, as required. In oreder to replat some areas as indicated, you will need to include Lot 1A, Phase 1. There is no Lot 8. Please include Lot 1A on plat to demonstrate final intentions. 2. The plat shows the existing 60-ft access easement from University to Phase to to be decreased from 60-ft to 40-ft. A traffic study was generated for this project showing an ADT of 7669 VPD at this future intersection. The study assumes 340 residential units for the subject property. According to the proposal shown, only about 1/3 that amount of residential units can be constructed on the property. The ADT would decrease to just over 6000 VPD. Therefore, the first portion of the drive will need to be the equivalent of a major collector street. You may wish to propose that the easement be reduced to a minor collector section after the access into gateway Phase 1. The City has a signal design for the intersection and the 40-ft easement will not allow for the design. 3. Some of the items in the Drainage Concept Plan can not be approved with a plat submission. Such items are approved with a Development Permit. 4. Whereas you show BFE's along the floodplain, it will need to be determined at which points will the BFE plus 1-ft apply. 5. Please refer to Final Plat Gateway Phase 2, March 2, 2001 (never filed). An access easement has been required to University Park II, Lot "Y". 6. It appears a drainage easement is needed; middle of Lot 1, Block 1 from University Drive to the floodplain. 7. Reviewed by: Spencer Thompson Date: March 13, 2003 PLANNING 1. Because the property is owned "in common" on condominium projects, the City will review these units as "apartments". Please remove all details of the condo layout NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 3 CITY OF COLLEGE STATION (.1 DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM March 17, 2003 TO: David Scarmardo, DWS Development inc., Via fax 822-1763 FROM: Bridgette George, Assistant Development Manager SUBJECT: GATEWAY SUBDIVISION PHASE 2-4 - Preliminary Plat Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, March 24, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for Thursday, April 3, 2003, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Ten (10) copies of the revised preliminary plat; and, One (1) Mylar original of the revised preliminary plat. One (1) copy of the digital file of the preliminary plat on diskette or e-mail to nmanhart@ci.college-station.tx.us Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed, your project will be pulled from the scheduled Planning & Zoning Commission agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Spencer Thompson or myself at 764-3570. Attachments: Staff review comments cc: Stewart Kling, Kling Engineering & Surveying, Via fax 846-8252 Case file #03-00500069 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: GATEWAY SUBDIVISION PHASE 2-4 - 03-00500069 ENGINEERING 1. Please include the entire parent tract of the subject property, as required. In order to replat some areas, as indicated, you will need to include Lot 1A, Phase 1 on this item. There is no Lot 8, Phase 1. Please include Lot 1A on plat to demonstrate final intentions. You can not leave the Reserve Tract out, as shown. 2. The plat proposes that the existing 60-ft access/ utility easement from University to Phase 2&4 to be decreased from 60-ft to 40-ft. A traffic study was generated for the Gateway project showing an ADT of 7669 VPD at the future University Drive intersection. The study assumes 340 residential units for the subject property. According to the proposal shown, only about 1/3 that amount of residential units can be constructed on the property. The ADT would decrease to just over 6000 VPD. Therefore, the first portion of the drive will need to be the equivalent of a major collector street. A 40-ft easement will not accommodate a major collector section plus utilities. You may wish to propose that the easement be reduced in order to accommodate a minor collector section after the access into Gateway Phase 1. 3. Some of the items in the Drainage Concept Plan can not be approved with a plat submission. Such items are approved with a Development Permit. Please remove items not related to platting. 4. Whereas the BFE's are shown on the Plat as required, it will need to be determined at which points which BFE (plus 1-ft) will apply. 5. Please refer to Final Plat Gateway Phase 2, March 2, 2001 (never filed). An access easement is required through Lot 1, Phase 3 to University Park II, Lot "Y". 6. It appears a drainage easement is needed; middle of Lot 1 , Block 1 from University Drive to the floodplain. 7. It is not clear as to Lot configuration proposed. Are the Phases different lots? 8. In order to subdivide Phase 4 separately, water must be extend to the lot. Reviewed by: Spencer Thompson Date: March 13, 2003 PLANNING 1. Because the property is owned "in common" on condominium projects, the City will review these units as "apartments". Please remove all details of the condo layout from the plat and show the lot and block of the tract, easements and the extension of utilities to and through the tract. Structure layout, driveway locations, individual utility connections, etc. will all be reviewed at time of site plan. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 3 2. If platted lots are included in this master preliminary plat (see Spencer's comments), then please clarify on Note #6 that the lots of Phases 2-4 will share signage. Reviewed by: Molly Hitchcock Date: March 12, 2003 ELECTRICAL 1. Developer installs conduit as per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser pole(s). Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design. (pull boxes provided by city). 5. Developer provides digital AutoCAD 2000i version of plat and/or site plan. Email to rbolinci.college-station.tx.us. 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for all electric lines (including street lighting). Reviewed by: Ronnie Bolin Date: 3-12-03 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 3 of 3 CITY OF COLLEGE STATION / DEVELOPMENT SERVICES �, 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM March 26, 2003 TO: Stewart Kling, Kling Engineering & Surveying, Via fax 846-8252 FROM: Bridgette George, Assistant Development Manager/ J SUBJECT: DP-GATEWAY PH 2-4 — Development Permit Staff has reviewed and approved the construction documents for the above- mentioned project. Upon receipt of the TCEQ NOI, staff will issue the development permit and release the approved construction documents. If you have any questions or need additional information, please contact Spencer Thompson or myself at 764-3570. Case file #03-00100009 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 2 Project: GATEWAY SUBDIVISION PHASE 2-4 - 03-069 ENGINEERING 1. Please note that Note #7 is in reference to a zoning ordinance requirement. 2. Minimum finished floor elevations to be defined and located on Final Plat. 3. Please include reference to zoning ordinance concerning access to University Drive. 4. A Private Access Easement is not needed on Phase 2 due to the fact that the entire property is under single ownership. 5. Water line shown on plat is as constructed. The depiction of the line is taken as what is proposed for this subdivision. 6. Due to the residential nature of Phases 2 and 4, Staff is requiring at least one sidewalk along street access to University Drive. 7. Intersection at University Drive to be designed in conjunction with signal design. Reviewed by: Spencer Thompson Date: March 27, 2003 PLANNING 1. Please change Note #6 to read, "...to be considered one building plot" rather than "...to be considered one lot". Reviewed by: Molly Hitchcock Date: March 26, 2003