Loading...
HomeMy WebLinkAboutStaff Comments CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM April 2, 2003 TO: Jimmy Lopez, Via fax 817.329.7671 FROM: Bridgette George, Assistant Development Manager SUBJECT: HEB PAVING & UTILITY - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) complete sets of revised construction documents for the proposed development. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Mary Rohrer, P. E, H. E. Butt Grocery Company, Via fax 210.938.8091 Case file #03-00500083 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: HEB PAVING & UTILITY — 03-00500083 PLANNING 1. All parking islands must have an approved ground cover or have enhanced pavement. Please label the material used in the parking islands. 2. Please show existing fire lane. 3. Please show that the trees lost in the construction of this parking lot are replaced within this parking area. Please provide location, caliper, and species of trees. Any trees that are preserved need to be barricaded during construction and a barricade detail and plan must be approved with the site plan. 4. All parking visible from the right-of-way will need to be screened (this may be accomplished using shrubbery, a berm, or a fence at a minimum of 3 feet in height). This screening will be required at the ends of the 3 parking rows. 5. Please provide plan for revised irrigation system necessary for new landscaping. Reviewed by: Jennifer Flanery Date: April 1, 2003 ENGINEERING 1. Please show all proposed underground electric conduits to be installed between lights and to power/meter source. 2. Please provide calculations showing new inlet captures sufficient runoff to be compliant with approved site drainage plan. 3. At this time, the grading shown on the City water tank site cannot be approved., An evaluation will need to be made to verify that the tank foundation will not be affected by the removal of this material. We will forward comments to you regarding this evaluation as soon as they area available. Reviewed by: Brett McCully, P.E. Date: April 1, 2003 ELECTRICAL 1. Any change in electrical service contact College Station Utilities. Reviewed by: Ronnie Bolin Date: 4-2-03 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 2 03 -S/3 CITY OF COLLEGE STATION ‘jDEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM May 5, 2003 TO: Jimmy Lopez, Via fax 817.329.7671 FROM: Bridgette George, Assistant Development Manager SUBJECT: HEB ADDITIONAL PARKING (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: $200 Site plan review fee; One (1) revised grading plan. If you have any questions or need additional information, please call Brett McCully at 764-3570. Attachments: Staff review comments cc: Mary Rohrer, P.E., H.E. Butt Grocery Company, Via fax 210.93.8091 Case file #03-00500083 (6,A11-k Home of Texas A&M University STAFF REVIEW COMMENTS NO. 2 Project: HEB ADDITIONAL PARKING (SP) - 03-00500083 ENGINEERING 1. The College Station Public Utilities Department has completed their review of the grading proposed, and believes that the negative impacts would be too significant to allow. Specifically, the grading within the City lot may threaten the stability of the water tank. In addition, there are numerous other issues involving the relocation of site lighting, private installation, operation and maintenance of irrigation systems on City property, and the loss of usability of the graded area due to excessive grade. Please revise the drawings to match existing grade at the property line, and along the eastern edge of the public utility easement to the west of the proposed work. Reviewed by: Brett McCully, P.E. Date: May 5, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and 'bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 2 CITY OF COLLEGE STATION ‘jDEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 8, 2003 TO: Jimmy Lopez, Via fax 817.329.7671 / FROM: Bridgette George, Assistant Development Manager SUBJECT: HEB ADDITIONAL PARKING (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: $400 processing fee (includes $200 for the next round of three (3) staff reviews); and, One (1) complete set of construction documents for the proposed development with the revised site and landscaping plans attached; If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call Jennifer Prochazka or Brett McCully, P.E., at 979.764.3570. Attachments: Staff review comments cc: Mary Rohrer, P.E., H.E. Butt Grocery Company, Via fax 210.9.8091 Case file #03-00500083 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 3 Project: HEB ADDITIONAL PARKING (SP) - 03-00500083 PLANNING 1. Required landscaping and irrigation plans were not supplied, so no review was performed. Further submittals without these required plans will be returned unchecked as incomplete. **Please remember that the trees lost in the construction of this parking lot must be replaced within this parking area. Please provide location, caliper, and species of trees. Any trees that are preserved need to be barricaded during construction and a barricade detail and plan must be approved with the site plan. 2. Any parking space shown to only be 18 feet in length must have space for a 2-foot overhang between the curb and the retaining wall. Drive aisles are only required to be 23 feet wide; you may consider lengthening your parking spaces and reducing your drive aisle width. 3. In addition to the end island requirement, 180 s.f. of INTERIOR parking islands is required for each group of 15 (or less) interior parking spaces. Reviewed by: Jennifer Prochazka Date: 8/8/03 ENGINEERING 1. Parking end islands (minimum of 180 S.F. at each end of each row) must be on same level as parking spaces, not above retaining wall(s). Please show required end island areas. 2. Southern island shown must be modified to fully protect southernmost parking space along alley access, or said parking space must be eliminated. (This space is currently extending into marked fire lane. This is not acceptable) 3. Please indicate how the wall can be constructed without encroachment onto the City Water Tank property. It appears that extensive shoring will be necessary to provide a vertical drop of approximately 13 feet within 18 inches of property line for foundation construction. Reviewed by: Brett McCully, P.E. Date: 8/6/03 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 2 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM September 17, 2003 TO: Jimmy Lopez, Via fax 817.329.7671 FROM: Bridgette George, Assistant Development Manager SUBJECT: HEB ADDITIONAL PARKING (SP) - Site Plan Staff reviewed the above-mentioned revised site plan as requested and has no comments. Please submit the following information for the plans to be stamped approved and distributed: Three (3) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Mary Rohrer, P.E., H.E. Butt Grocery Company, Via fax 210.938.8091 k/ Case file #03-00500083 Home of Texas A&M University STAFF REVIEW COMMENTS No. 4 Project: HEB ADDITIONAL PARKING (SP) - 03-00500083 PLANNING 1. No Comments Reviewed by: Jennifer Prochazka Date: August 28, 2003 ENGINEERING 1. The grading plan still does not demonstrate how the northern retaining wall can be constructed without encroaching on the City's elevated water tank parcel. The plan provides no room for shoring, bracing, or even forming the wall foundation. This is a repeat comment. 2. The grading plan does not include the utility poles and overhead lines existing within the easement. Review Comments # 2 dated 5/5/03 required the proposed grading to match existing grade at the eastern easement line. After reviewing the Utility Department concerns, we would allow grading to start no closer than 10 feet from the existing poles. The grading must not exceed the 20% slope shown within the western 20 feet of the easement. The eastern 10 feet of the easement may be graded at whatever slope can be adequately landscaped and maintained. 3. Landscaping Plan should be modified to keep all trees at least 20 feet from the western property line to allow for future water pipe installation. Reviewed by: Brett McCully, P.E. Date: September 2, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 3 of 3