Loading...
HomeMy WebLinkAboutStaff Comments 1. CITY OF COLLEGE STATION ‘jDEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM April 11, 2003 TO: Louise Fischer, Kerr Surveying, via fax 691.8904 FROM: Bridgette George, Assistant Development Manager SUBJECT: GRAHAM CORNER PLAZA (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested but had to stop review due to an incomplete submittal. The following page is a preliminary list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by an established deadline to be scheduled for a future Planning & Zoning Commission meeting: Two (2) copies of the revised final plat; Two (2) copies of construction documents for all proposed public infrastructure; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart@ci.college-station.tx.us If you have any questions or need additional information, please call Carol Cotter or myself at 764-3570. Attachments: Staff review comments cc: Ted Whitmer, 2508 Merrimac Court, College Station, TX, 77845 Case file #03-00500084 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: GRAHAM CORNER PLAZA (FP) - 03-00500084 THIS IS A STOP REVIEW. THESE COMMENTS DO NOT CONSTITUTE A COMPLETE REVIEW. ENGINEERING 1. Provide construction documents for all proposed public infrastructure as part of final plat application. 2. Only two driveways will be allowed to access Graham Road. The plat shows three. If you intend to use the westernmost access easement as one of the driveways and want to give access to the adjacent property, then the access will need to extend to that property line. 3. Only one driveway access to State Highway 6 will be allowed. You are showing two. 4. The base flood elevations need to be corrected to match those provided in the hydraulic model (We corrected them by hand on the previous plat). Reviewed by: Carol Cotter Date: April 10, 2003 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of#4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 14 version of plat and/or site plan. email to rbolin(a ci.colleoe-station.tx.us 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). Reviewed by: Ronnie Bolin Date: April 11, 2003 NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 2 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 6, 2003 TO: Louise Fischer, Kerr Surveying, Via fax 691.8904 ✓ FROM: Bridgette George, Assistant Development Manager SUBJECT: GRAHAM CORNER PLAZA (FP) Staff reviewed the above-mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: Two (2) sets of revised construction documents. If you have any questions or need additional information, please call Carol Cotter or myself at 764.3570. Attachments: Staff Review Comments Cc: Ted Whitmer, 2508 Merrimac Ct., College Station, TX, 77845 ✓ Case file no. 03-00500084 Home of Texas A&M University GRAHAM CORNER PLAZA (FP) (03-00500084) ENGINEERING REVIEW COMMENTS No. 2 1. Provide profiles for 8-inch waterline stub outs on Waterline W-1 at Station 3+90 and Waterline W-2 at Stations 3+57 and 6+32. 2. A fire hydrant is shown on the plan of Waterline W-2 at Station 6+32, but is not called out on plan or profile. Reviewed by: Carol Cotter Date: July 30, 2003 NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City of College Station will constitute a completely new review. Page 2 of 2 03 -� CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM May 23, 2003 TO: Louise Fischer, Kerr Surveying, Via fax 691-8904 FROM: Bridgette George, Assistant Development Manager SUBJECT: Graham Corner Plaza — Construction Documents Staff reviewed the above-mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: Three (3) sets of revised construction documents. If you have any questions or need additional information, please call Carol Cotter or myself at 764.3570. Attachments: Staff Review Comments Cc: - ved Whitmer, 2508 Merrimac Ct, College Station, TX, 77845 Case file no. 03-84 Home of Texas ABM University GRAHAM CORNER PLAZA (FP) - (03-00500084) ENGINEERING REVIEW COMMENTS No. 1 1. Wastewater mains shall be imbedded in cement-stabilized sand where waterlines cross in accordance with TCEQ regulations. Add note and indicate on profile 2. Add watertight lid to Manhole No.2. Its elevation is below the Base Flood Elevation in that area. Reviewed by: Carol Cotter Date: May 23, 2003 NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City of College Station will constitute a completely new review. Page 2 of 2