April 11, 2003
TO: Louise Fischer, Kerr Surveying, via fax 691.8904
FROM: Bridgette George, Assistant Development Manager
SUBJECT: GRAHAM CORNER PLAZA (FP) - Final Plat
Staff reviewed the above-mentioned final plat as requested but had to stop review due
to an incomplete submittal. The following page is a preliminary list of staff review
comments detailing items that need to be addressed. Please address the comments
and submit the following information by an established deadline to be scheduled for a
future Planning & Zoning Commission meeting:
Two (2) copies of the revised final plat;
Two (2) copies of construction documents for all proposed public
infrastructure;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart@ci.college-station.tx.us
If you have any questions or need additional information, please call Carol Cotter or
myself at 764-3570.
Attachments: Staff review comments
cc: Ted Whitmer, 2508 Merrimac Court, College Station, TX, 77845
Case file #03-00500084
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: GRAHAM CORNER PLAZA (FP) - 03-00500084
THIS IS A STOP REVIEW. THESE COMMENTS DO NOT CONSTITUTE A
COMPLETE REVIEW.
ENGINEERING
1. Provide construction documents for all proposed public infrastructure as part of final
plat application.
2. Only two driveways will be allowed to access Graham Road. The plat shows three.
If you intend to use the westernmost access easement as one of the driveways and
want to give access to the adjacent property, then the access will need to extend to
that property line.
3. Only one driveway access to State Highway 6 will be allowed. You are showing two.
4. The base flood elevations need to be corrected to match those provided in the
hydraulic model (We corrected them by hand on the previous plat).
Reviewed by: Carol Cotter Date: April 10, 2003
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of#4 rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
5. Developer provides digital AutoCAD 14 version of plat and/or site plan.
email to rbolin(a ci.colleoe-station.tx.us
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction
purposes.
8. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
Reviewed by: Ronnie Bolin Date: April 11, 2003
NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review.
Page 2 of 2
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
COLLEGE STATION College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
August 6, 2003
TO: Louise Fischer, Kerr Surveying, Via fax 691.8904 ✓
FROM: Bridgette George, Assistant Development Manager
SUBJECT: GRAHAM CORNER PLAZA (FP)
Staff reviewed the above-mentioned engineering documents as requested. The
following page is a list of staff review comments detailing items that need to be
addressed. Please address the comments and submit the following information
for further staff review and approval of the plans:
Two (2) sets of revised construction documents.
If you have any questions or need additional information, please call Carol Cotter
or myself at 764.3570.
Attachments: Staff Review Comments
Cc: Ted Whitmer, 2508 Merrimac Ct., College Station, TX, 77845 ✓
Case file no. 03-00500084
Home of Texas A&M University
GRAHAM CORNER PLAZA (FP) (03-00500084)
ENGINEERING REVIEW
COMMENTS No. 2
1. Provide profiles for 8-inch waterline stub outs on Waterline W-1 at Station
3+90 and Waterline W-2 at Stations 3+57 and 6+32.
2. A fire hydrant is shown on the plan of Waterline W-2 at Station 6+32, but is
not called out on plan or profile.
Reviewed by: Carol Cotter Date: July 30, 2003
NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must
be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on
these plans that have not been pointed out to the City of College Station will constitute a
completely new review.
Page 2 of 2
03 -�
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
COLLEGE STATION College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
May 23, 2003
TO: Louise Fischer, Kerr Surveying, Via fax 691-8904
FROM: Bridgette George, Assistant Development Manager
SUBJECT: Graham Corner Plaza — Construction Documents
Staff reviewed the above-mentioned engineering documents as requested. The
following page is a list of staff review comments detailing items that need to be
addressed. Please address the comments and submit the following information
for further staff review and approval of the plans:
Three (3) sets of revised construction documents.
If you have any questions or need additional information, please call Carol Cotter
or myself at 764.3570.
Attachments: Staff Review Comments
Cc: -
ved Whitmer, 2508 Merrimac Ct, College Station, TX, 77845
Case file no. 03-84
Home of Texas ABM University
GRAHAM CORNER PLAZA (FP) - (03-00500084)
ENGINEERING REVIEW
COMMENTS No. 1
1. Wastewater mains shall be imbedded in cement-stabilized sand where
waterlines cross in accordance with TCEQ regulations. Add note and indicate
on profile
2. Add watertight lid to Manhole No.2. Its elevation is below the Base Flood
Elevation in that area.
Reviewed by: Carol Cotter Date: May 23, 2003
NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must
be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on
these plans that have not been pointed out to the City of College Station will constitute a
completely new review.