Loading...
HomeMy WebLinkAboutMisc. Jul 23 02 02: 06p Ash & Browne 979 846 8914 p. 1 ASH & BROWNE ENGINEERING, INC. Engineers and Consultants P.O. Box 10838,College Station,Texas 77842 979-846-6914 877-245-4839 Fax:979-846-8914 Post-it"°Fax Note 7671 Dale Z3_ „ �ag s� / -�1�TZ���-7C���1�7 July 23, 2002 To e �l From�7�'4l. �i�i i -/L Co./Dept./�e ,`.` Co4[S/t- Spencer Thompson, E. I. T. Graduate Engineer Phone* 5,764_ 3570 Phone# _6,5L�¢ City of College Station Fax tl -1 4.,345 Fax tl 9/ P.O. Box 9960 n College Station, Texas 77842 lf� v Re.: University Preserve Subdivision Changes to Construction drawings. ABEL No. 1042001 Dear Spencer: As per our conversation, this letter is to inform you that we will be installing 6” of cement stabilized base in lieu of the 6" of flexible base course as shown in the pavement sections found in the construction drawings. I will forward a copy of the City's Specification No. 203 A to the Contractor to ensure that the cement stabilized base is prepared and installed in accordance with City standards. If you have any questions regarding this information, please do not hesitate to call. Sincerely, le OF T-01% ASH & BRO NE . GIN .RING, INC. 5�•'..... � .. t4 �i� �* 1A- •'••. *� 6 • J. DALE BROWNE, JR. J. Dale Browne, Jr., P.E. e9o••.;� 81890 0 .:4t: cisTER,.�V", Attachment cc: Keith Pierson, Young Contractors, Inc. Switzer Deason 11AbeittolOFFICEIProjects11042-Switzer Deason1001-12 Acre Subdivtsion1Letters\COCS-Thompson05-Letter.wpd Jul 23 02 02: 06p Ash & Browne 979 846 8914 p. 1 ASH & BROWNE ENGINEERING, INC. Engineers and Consultants P.O. Box 10838,College Station,Texas 77842 979-846-6914 877-245-4839 Fax: 979-846-8914 Post-it"'Fax Note 7671 Dale..moi July 23, 2002 To Spab ,zi/ From s 4.1. Ai.20tAwz. Spencer Thompson, E. I. T. ca./Dept. Q=S co SF,� / '�i�� Graduate Engineer Phone# > ,7 4_ Phone# 4� a City of College Station Fax# iLT,s496 Fax# P.O. Box 9960 College Station, Texas 77842 Re.: University Preserve Subdivision Changes to Construction drawings. ABET No. 1042001 Dear Spencer: As per our conversation, this letter is to inform you that we will be installing 6" of cement stabilized base in lieu of the 6" of flexible base course as shown in the pavement sections found in the construction drawings. I will forward a copy of the City's Specification No. 203 A to the Contractor to ensure that the cement stabilized base is prepared and installed in accordance with City standards. If you have any questions regarding this information, please do not hesitate to call. Sincerely, 1 ASH & BRO NE ••NGIN - E of T s��+ RING, INC.fNC. �SSP'"• / *:1-23L•::� 4 1�� • J. DALE BROWNE, JR. i 11 J. Dale Browne, Jr., P.E. .81890 9: 81890 C/STE . 1ee� R G�� Attachment ` �off`. cc: Keith Pierson, Young Contractors, Inc. Switzer Deason ❑AbeiA610FFICE1Projec 11042-Switzer Deason1001-12 Acre Subdivision\Letters\COCS-Thompson05-Letter.wpd