MEMORANDUM
April 11, 2003
TO: Mark W. Buchanan, via fax 822.7604
FROM: Bridgette George, Assistant Development Manager
SUBJECT: BUCHANAN ESTATES (FP) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list
of staff review comments detailing items that need to be addressed. If all comments
have been addressed and the following information submitted by Monday, April 21,
2003, 10:00 a.m., your project will be placed on the next available Planning and Zoning
Commission meeting scheduled for Thursday, May 1, 2003, 7:00 p.m. in the City Hall
Council Chambers, 1101 Texas Avenue:
Two (2) copies of the revised final plat;
Parkland Dedication in the amount of $556 must be submitted prior to the
filing of the final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart@ci.college-station.tx.us
Upon receipt of the required documents for the Planning & Zoning meeting, your project
will be considered formally filed with the City of College Station. Please note that if all
comments have not been addressed your project will be pulled from the scheduled
Planning & Zoning Commission Agenda. Your project may be placed on a future
agenda once all the revisions have been made and the appropriate fees paid. If you
have any questions or need additional information, please call or myself at 764-3570.
Attachments: Staff review comments
cc: Emerald Forest Joint Venture No. 1, via fax 777.1313
Spencer J. Buchanan Associates Inc., via fax 822.7604
Case file #03-00500089
Home of Texas AB&M University
STAFF REVIEW COMMENTS NO. 1
Project: BUCHANAN ESTATES (FP) - 03-00500089
ENGINEERING
1. You must tie-down survey to known point.
2. Please show all line dimensions on plat figure or in line table. L.31-L.34.
3. Plat must specifically state Minimum Finished Floor for each lot; Minimum finished
floor for Lot 1 and Lot 2 is 240.5.
4. Please add note: Access to Lots 1 and 2 shall be restricted to easement location.
5. Please label point of beginning of plat.
6. It was my understanding that either a 5-ft or 10-ft easement would be placed along
C.1.
Reviewed by: Spencer Thompson Date: April 8, 2003
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of#4 rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
4. Developer provides digital AutoCAD 14 version of plat and/or site plan.
email to rbolinci.college-station.tx.us
5. Developer provides load data for project.
6. Developer provides temporary blanket easement for construction
purposes.
7. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
Reviewed by: Ronnie Bolin Date: 4-9-03
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review.
Page 2 of 2