Loading...
HomeMy WebLinkAboutStaff Comments 1101 Texas Avenue, P.O. Box 9960 (irffCollege Station, Texas 77842 Phone 979.764.3570/ Fax 979.764.3496 CITY OF COLLEGE STATION MEMORANDUM May 27, 2008 TO: Julie Wehmeyer, Greenberg Farrow via fax: 847-788-9536 FROM: Jennifer Prochazka, Senior Planner, AICP and Lauren Hovde, Staff Planner SUBJECT: TEXAS ROADHOUSE (SP) -Site Plan Staff reviewed the above-mentioned site plan as requested. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Kerri Smith, Texas Roadhouse via email: kerri.smith(cr�.texasroadhouse.com Frank Frieco, Greenberg Farrow via fax: 847-788-9536 Case file #08-00500084 STAFF REVIEW COMMENTS NO. 2 Project: TEXAS ROADHOUSE (SP) - 08-00500084 PLANNING 1. No Comments. Reviewed by: Jennifer Prochazka, Senior Planner, AICP and Lauren Hovde, Staff Planner Date: May 23, 2008 3455 Salt Creek Lane Suite 100 Arlington Heights, IL 60005 t: 847 788 9200 f: 847 788 9536 GreenbergFarraw ATLANTA NEW YORK CHICAGO LOS ANGELES BOSTON DALLAS NEW JERSEY ST.PETERSBURG May 15,2008 To Ms. Lauren Hovde Project Texas Roadhouse College Station,TX City of College Station 1101 Texas Avenue Project# 20080091.5 College Station,TX 77842 Re Plan Review Comments Response t: 979.764.3570 Dear Ms. Hovde: In regard to the proposed Texas Roadhouse restaurant in College Station,Texas and the Plan Review submitted to you,we have received your memorandum,via facsimile on April 21,2008, and we offer the following responses: Planning: Comment 1 Please submit a NRA(Non-Residential Architectural)application. Response 1 Please refer to attached,completed NRA Application. Comment 2 Please submit a revised site plan showing where the existing landscape is being replaced. Response 2 Refer to Note on Revised Site Plan. Comment 3 The square footage of the addition needs to be added to the site plan/revised landscape plan. Response 3 Refer to Square Footage on the Revised Site Plan. Comment 4 Provide a general note that all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150'of the subject lot,measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Response 4 No Landscape Revision required at this time. Comment 5 Please note that any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Response 5 No additional changes have been incorporated. • City of College Station Plan Review Comments May 15, 2008 Page 2 of 2 Landscaping/Streetscapinq/Buffer: Comment 1 Provide a general rule that 100%coverage of groundcover,decorative paving,decorative rock(not loose), or a perennial grass is required in parking lot islands,swales and drainage areas,the parking lot setback, rights-of-way, and adjacent property disturbed during construction. Response 1 Please refer to Note on Revised Site Plan. We trust that our response has sufficiently answered your comment; if however,you need more information, please do not hesitate to contact me at 847.788.9200,ext.232, or iwehmevert greenbergfarrow.com. Thank you. Sincerely, oc,kk..7-0_,1,1 fh.12-le-A....., Julie T.Wehmeyer,AIA Project Manager JTW/rrg cc: Kerni Smith,Texas Roadhouse(w/attach.via email) Mike Laur,Texas Roadhouse(w/attach.via email) David Banet,Texas Roadhouse(w/attach.via email) Angelina Robinson, GF TX(w/attach.via email) Susan Nelson-Kougias, GF IL(w/attach.via email) P:\20081200800915\999 General Correspondence1200800915 Plan Review Response Ltr.to City of College Station,TX 2008-05-15A.doc City of College Station Requirements for Electric Service: All electric service will be provided underground. • Electric department personnel have the discretion to provide overhead service if deemed appropriated. Developer I Owner is responsible for providing and installing at developers cost: • Conduits per Electrical Divisions spec and design. • 30 ft. of rigid conduit for riser poles (install first 10 ft. city will install remainder) provide weatherhead if secondary riser. • Concrete transformer pads for commercial and apartment complex projects per city specs and design. • Concrete junction box pads per city specs and design. • Subsurface pull boxes per city spec and design (pull boxes supplied by City). • Street lighting per city spec and design. • CT can on building if necessary per city spec and design. Developer/ Owner needs to provide the City of College Station Electric Division with: • Plat and/or site plan • Digital (Autocad version) of plat and/or site plan. E-mail to jreeves@ci.coiiege-station.tx.us • Electric load data for project (need ASAP transformer delivery is currently 20 to 26 weeks) • Temporary Blanket easement (see attached form, fill out and return with necessary paperwork). • Upon completion of project surveyed sealed meets & bounds descriptive easements are necessary to release temporary blanket easement. Electric service will not be energized unless easement form is on file in our legal department. 12-15-99 Date City of College Station Contacts: Public Utilities Department Tony Michalsky Electrical Division Electric T&D Superintendent, 409-764-3438 P.O. Box 9960 e-mail—tmichals@ci.college-station.tx.us College Station, Texas Jennifer Reeves fax#409-764-3452 Electric Planning/Project Assistant, 409-764-3502 e-mial—jreeves@ci.college-station.tx.us RE: ELECTRICAL SERIVCE REQUEST We the undersign hereby request electric service for: Business Name Location Owner's Name Contact Person Phone # Fax# E-mail Estimated Date Construction Begins Estimated Construction Completion Date Anticipated Date Permanent Service Required THIS IS NOT A REQUEST FOR METER INSTALLATION Return by MAIL OR FAX Thank You CITY OF COLLEGE STATION PLANNING DIVISION POST OFFICE BOX 99601101 TEXAS AVENUE COLLEGE STATION,TEXAS 77842-9960 COLLEGE STATION TELEPHONE:(409)764-3570 MEMORANDUM January 10, 2000 TO: Bob Cornett, Via fax (606) 276.2Q L'70 I i C FROM: Bridgette George, Asst. Development Coordinato '`.. SUBJECT: Texas Roadhouse - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for plan approval and distribution: Six (6) sets of civils with the revised site and landscaping plans attached; and, Three (3) revised site and landscaping plans only. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Sheila Brown, Via fax (502) 327-4689 Delmar Baronhead I, Ltd., Via fax (972) 233-1501 Case file #99-439 STAFF REVIEW COMMENTS No. 2 Project: Texas Roadhouse Site Plan #99-439 ,--->1. In the paving notes on SP-1, notes 4 & 5 need to comply with the City's Fire Lane marking requirements. '� 2. Recalculate the landscape/streetscape point requirements. All existing trees will need to be barricaded, but the point status will be non-protected (35 pts ea) due to previous damage caused while clearing the site. Please include point status for all new plantings provided in the landscape requirement (plant list). The streetscape total point requirement is 1650. This includes the 1- canopy tree/25 feet of frontage plus an additional 300-points/50 feet of frontage. Provide approximately 7 more (4" min. caliper) canopy trees added to this site. The project must expend 50% of its point total on canopy trees. This is derived from 50% of the landscape total requirement (1100 pts) plus the streetscape total point requirement (1670 pts), for a total of 2750 points towards canopy trees. (Note: 2 non-canopy trees can be substituted for 1 canopy tree.) A. The City's requires a 20 feet site triangle at driveways with no obstructions between the heights of 2.5 and 9 feet. ,,( Provide a fire hydrant on the northwest corner of the site and include the construction drawings. You will not be able to use the existing location near University Drive because it will not meet the City's Fire Protection Ordinance requirement. An approved fire hydrant location shall be in place before the fire department will allow combustibles on site. \ Reviewed by: Scott Hester Date: 1-10-00 � 4 , , ti, f)i ft, C,,.#oy etr.k. `i L t kt t.}o,_. "\ .0 ,, ":;• ..A./ . `1 o- t) f' e if n 0.(1---, .. a:y t 1 .e• L.7 r;1 F Staff Review Comments Page 1 of 1 CITY OF COLLEGE STATION j PLANNING DIVISION POST OFFICE BOX 9960 1101 TEXAS AVENUE COLLEGE STATION,TEXAS 77842-9960 COLLEGE STATION TELEPHONE (409)764-3570 MEMORANDUM January 27, 2000 TO: Bob Cornett, Via fax (606) 276-2901 I, ',01 FROM: Bridgette George, Asst. Development Coordinator • SUBJECT: Texas Roadhouse - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the attached comments and submit the following information for further staff review and for the plans to be stamped approved and distributed: Six (6) revised site and landscaping plans; Six (6) plan and profiles from the waterline to the fire hydrant and backflow preventer at the building where the FDC is located; and, $100 processing fee for the next round of three (3) staff reviews; If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Sheila Brown. Via fax (502) 327-4689 Delmar Baronhead I, Ltd. Via fax (972) 233-1501 Case file #99-439 STAFF REVIEW COMMENTS No. 3 Project: Texas Roadhouse Site Plan #99-439 /1. In the paving notes on SP-1, also amend the text in notes 4 and 5 regarding the 8" fire lane stripe. —h> 2. Provide barricading for all the existing trees that are to be included in the streetscape points requirement. Only 16 of the 20 existing trees depicted on the landscape plan are barricaded. /3. PLANT LIST: Remove the statement at the bottom of the Plant List. This list is the official landscape list approved by the city unless you request to amend it. Also, Item "E" in the plant lists shows a quantity of 80 with 800 points. The drawing depicts a quantity of 90 and should show 900 points. /4. LANDSCAPE REQUIREMENTS: Amend the total points for the new non- canopy trees plantings from 2520 to 2620, and the total landscape new planting points from 4620 to 4720. Also, Amend the total points provided for new and existing from 5320 to 5420. Reviewed by: Scott Hester Date: 1-24-00 Staff Review Comments Page 1 of 1 Bridetteeorge:::..e_RRe ». .... - . .....-......:................................. - .... - ...............:........................................---......:........,............ ......:::9Geo NewDevelopment ListPage 1 From: Tony Michalsky To: Bridgette George Date: 8/30/99 7:55AM Subject: Re: New Development List Sorry I'm late with these. Super B Subdivision (99-312) No Comments Lake View Acres (99-243) There is an existing overhead electrical line that crosses this property to provide service to a residence besides the U-haul property. Easement will need to be provided to cover existing line. If line needs to be relocated, we will work with property owner on relocation. Ismaili Jamatkhana&Center(99-438) Developer installs electrical conduit per city specs and design. (There is an electrical J-box existing at the Edelweiss Ave. & Rock Pr Rd intersection and at the property line of the commercial lot show on site plan. Service will be provide from these two locations. Conduit will need to be installed from the J-box to the proposed transformer location and then carried to the J-box by the commercial lot.) Developer pour transformer pad per city specs. Developer will need to provide easements to cover electical infrastructure as installed. Need electrical load data. Super Trac Convenience Store and Gas Station (99-719) Developer installs conduit per city spec and design. Developer pours transformer pad per city specs. Need electrical load data. Developer provides easements to cover electrical infrastructure as installed. Proposed electric service location must be in the same location unless building is seperated by necessary firewall. Would like to discuss possible relocation of transformer. Electrical service will be provide from the existing power line along the Hwy 158 right of way. Christ United Methodist Church (99-438) No Comment Texas Road House Restaurant(99-439) • Developer installs conduit per city spec and design. Proposed transformer location is okay. Metering will be located on transfomer, service from transformer to building by developer. Need electric load data. Developer provides easements to cover electrical infrastructure as installed. Wal-Mart Seasonal Box Addition (99-440) No comments >>> Bridgette George 08/24/99 11:33AM >>> GOOD MORNING! Attached is the list of new development for this week. Thank you! Bridgette George :o) Asst. Development Coordinator MEMORANDUM September 1, 1999 TO: '-"Sheila Brown, Via fax (502) 327-4689 FROM: Bridgette George, Asst. Development Coordinat. jJ SUBJECT: Texas Roadhouse - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Three (3) complete sets of building construction documents for the proposed development with the revised site and landscaping plans attached; and, The attached redlined site plan with staff comments. I am still waiting to receive the civil construction documents from the engineer who is reviewing those. There may be additional comments that will need to be addressed concerning grading, drainage, and utilities. As soon as I receive those I will forward those to you. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Redlined site plans Staff review comments cc: vbelmar Baronhead I, Ltd., Via fax (972) 233-1501 ✓The Roberts Group, Via fax (606) 276-2901 Case file #99-439 boa 4'-/ 3 , STAFF REVIEW COMMENTS No. 1 Project: Texas Roadhouse Restaurant #99-439 ;1. Who will construct the roadway within this 30-foot access and utility easement? Will it be installed before the development of this site? Will the roadway extend to the intersection of University Drive and Glenhaven? The City will not issue a C.O. until this roadway is complete to provide access to your site. -,1 2. The City has approved the 20-foot utility easement along University Drive, but the waterline location has not been approved. Your site plan should reflect the approved civil plans. -3. The off-street parking requirement is 1 per 65 sq. feet (97 spaces). Also give the dimensions to each section of the parking spaces. - 4. Several parking end islands are not the required 180 square feet. The property line should evenly divide the two end islands on the southeast and southwest corners of the property for the perimeter parking facing University Drive. There is an additional 180 square feet required for every 15 interior parking spaces (4 total). Provide 2 additional interior islands for this site. 5. Provide water meter locations and place them in a utility easement. (Note: the proposed electrical meter and gas meter locations at the building appear to be reversed.) -6. FDC locations shall be placed on the site plan. /7` Show fire lane(s) on the site plan. V8. The existing fire hydrant located on the southwest corner of proposed site is a proposed location by a private contractor and has not been approved by the City. If this proposed location is approved, you will need to provide an additional fire hydrant on the proposed site. The City has not approved the waterline location adjacent to University Drive. It may be located on the north side of the proposed development within the 30-foot Access and Utility Easement. The existing fire hydrant as shown will not be at this location if the waterline is relocated to the north of your site. If the waterline does stay at this location along University Drive you will not be able to use this existing fire hydrant location due to the City's Fire Protection Ordinance requirement (Chapter 6, Section 603, 603.1.36). A fire hydrant will need to be placed on site (suggest the NW corner near the 30' Access & Utility Easement) for use by the Fire Department, and to meet the City Fire Protection Ordinance requirement. An approved fire hydrant location shall be in place before the fire department will allow combustibles on site. Staff Review Comments Page 1 of 2 9. Provide wheel stops in the parking areas on the east and west property lines 2 feet from the edge of pavement to prevent the overhang of vehicles onto the adjacent properties. Also, a 6-inch raised curb shall be required around the entire perimeter of the lot. In this case, you may use knockdown curbing that can be removed in the event that future parking area on the adjacent property is installed. 4. 10.Recalculate the street tree points for the streetscape requirement. Will these existing trees along University Drive meet the streetscape point requirement since they are now under non-protected status? All existing trees will need to be barricaded, but the point status will be non-protected due to previous damage caused while clearing the site. - 11.Provide screening for the parking lot on the south side of your site facing University Drive. ,>12.Recalculate the new planting points for landscaping requirement. 413.The city will need to approve the materials used for the retaining wall prior to installation. -- 14.Chose one of the detail options from the zoning ordinance. Note: The engineering comments will follow upon completion of their review. Reviewed by: Scott Hester Date: 8-31-99 Staff Review Comments Page 2 of 2 Ar, STATION COLLEGE P. 0. Box 9960 • 1101 Texas Avenue • College Station, TX 77842 Tel: 409 764 3500 MEMORANDUM TO: Sheila C. Brown, Texas Roadhouse Via fax #(502) 426-3274 , FROM: Natalie Ruiz, Development "s o.i i : ,.7 / i3 'J DATE: Wednesday, February 23, 2000 RE: Building permit issuance for Texas Roadhouse in College Station. This week, staff received revised site plans along with the waterline plans for the Texas Roadhouse restaurant to be constructed on University Drive. A building permit will be issued for the restaurant once the following items are submitted: Punchlist for Building Permit An estimate of the proposed waterline sealed by a registered professional engineer. Building permit fee in the amount of$1,380. If you have any questions about the items listed above or need additional information pertaining to issuance of a building permit, please contact me at (409) 764-3570 or e-mail me at "nruiz@ci.collc«c-station.tx.us". Thank you. cc: ase file 1199-439 Lance Simms, Building Official Home of Texas A&M University MEMORANDUM February 14, 2000 TO: Bob Cornett, Via fax (606) 276-2901 FROM: Bridgette George, Asst. Development Coordinator SUBJECT: Texas Roadhouse - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the attached comments and submit the following information for further staff review and for the plans to be stamped approved and distributed: Six (6) revised site and landscaping plans; Six (6) plan and profiles from the waterline to the fire hydrant and backflow preventer at the building where the FDC is located; and, $100 processing fee for the next round of three (3) staff reviews; If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Sheila Brown, Via fax (502) 327-4689 Delmar Baronhead I, Ltd. Via fax (972) 233-1501 Case file #99-439 • I; COLLEGE STATION (t_ P. O. Box 9960 • 1101 Texas Avenue • College Station, TX 77842 Tel: 409 764 3500 MEMORANDUM TO: Sheila C. Brown, Texas Roadhouse Via fax #(502) 426-3274 FROM: Natalie Ruiz, Development Coord.)at., 111TI DATE: Friday, February 18, 2000 RE: Building permit issuance for Texas Roadhouse in College Station. This week, staff received revised site plans along with the waterline plans for the Texas Roadhouse restaurant to be constructed on University Drive. A building permit will be issued for the restaurant once the following items are submitted: Punchlist for Building Permit Four (4) copies of the revised waterline plans. (The only staff review comment is to note the mechanical joint at the 90°bend.) _ Seven (7) copies of the revised site plan package. (The only staff review comments that need to be addressed are on the landscape plan. Several of the existing trees that are presently accruing points (non-protected 35 pts. ea.) towards the landscape/streetscape point requirement will not be counted due to the intrusion of the pavement into the new barricaded areas. Also, you will need to recalculate the landscape/streetscape points due to the removal of the nine trees, which reduces the streetscape points by 385 points. In addition, in the Landscape Notes (sheet LA-1) you should add a note #10 that explains the definition of a barricaded area: Barricade area for existing trees: An area protected throughout construction and extending in a radius of 1 foot per caliper inch of tree diameter from every protected tree that prevents intrusion by construction equipment, vehicles and people.) Site plan review fee of $100. (This fee was required with the last round of site plan reviews and was not submitted.) _ Building Permit application. Submit the completed application. Once the application is received, staff will determine the total amount of building permit fees. Home of Texas A&M University Memo to Sheila Brown Texas Roadhouse Case#99-439 Page 2 of 2 Punchlist for Building Permit(cont.): _ An estimate of the proposed waterline sealed by a registered professional engineer. _ Water and sanitary sewer tap fees in the amount of$2,100. 6" sanitary sewer tap - $100 inspection fee (the developer is responsible for the making of the tap according to the City specifications and is subject to City inspection). _ 1"water tap (irrigation) - $500; and, _ 2"water tap (domestic) - $1500. Temporary electric pole fee in the amount of$45. Application for a Contractor's License. Your contractor will be required to submit the completed application along with the $54 application and processing fee prior to issuance of a building permit. If you have any questions about the items listed above or need additional information pertaining to issuance of a building permit, please contact me at (409) 764-3570 or e-mail me at "nruiz@ci.college-station.tx.us". Thank you. Attachments: Building Permit Application Contractor's License Application cc: Case file#99-439 Lance Simms, Building Official CITY OF COLLEGE STATION APPLICATION FOR CONTRACTOR LICENSE Type of Contractor. Applicant Name: Company Name: Company Address: City: State: Zip: Phone: Mobile: Pager _ Other List any persons authorized to apply for permits or inspections other than the applicant: I hereby make application to the City of College Station for a Contractor's License. I certify that the above statements are true and correct. I understand that the application fee of 550.00 and the processing fee of $4.00 is non-refundable. I further understand that the provision of false information on this application may result in the revocation of this license by the City of College Station. Signature of Applicant Date: Official Use Only State License Number. Exp.Date City License Number Exp.Date Issued by: L..i....96 To: Bridgette George From: Ted Mayo �. CC: Sabine McCully Date: 02/23/00 Re: OAKWOOD CUSTOM HOMES COMMERCIAL SITE PLAN Drainage Submittal Review I have reviewed the submittal of 02-17-2000 by Hester Engineering Corporation and all of my concerns relative to drainage have been addressed. •Page 1 STAFF REVIEW COMMNETS No. 4 Project: TEXAS ROAD HOUSE RESTAURANT (SP) (99-120) 1. Several of the existing trees that are presently accruing points (non-protected 35 pts. ea.) towards the landscape/streetscape point requirement will not be counted due to the intrusion of the pavement into the new barricaded areas. Also, you will need to recalculate the landscape/streetscape points due to the removal of the nine trees points, which reduces the streetscape points by 385 points. In addition, in the Landscape Notes (sheet LA-1) you should add a note #10 that explains the definition of for a barricaded area: Barricade area for existing trees: An area protected throughout construction and extending in a radius of 1 foot per caliper inch of tree diameter from every protected tree that prevents intrusion by construction equipment, vehicles, and people. Reviewed by: SCOTT HESTER Date: 18-Feb-00 Staff Review Comments Page 1 of 1