Loading...
HomeMy WebLinkAboutStaff Comments CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM June 10, 2003 TO: Joe Gattis, Ash & Browne Engineering, Inc., Via fax 846.8914 FROM: Bridgette George, Assistant Development Manager SUBJECT: City Limits Restaurant — Development Permit Staff reviewed the above - mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: Three (3) sets of driveway design drawings and details with three (3) copies of the application. If you have any questions or need additional information, please call Carol Cotter or myself at 764.3570. Attachments: Staff Review Comments Cc: John Fedora, Via fax 696.0001 Case file no. 03 -16 Home of Texas ABM University e DP -CITY LIMITS RESTAURANT - (03- 00100016) ENGINEERING REVIEW COMMENTS No. 1 1. TxDOT requires the driveway permit application to be signed by the property owner. 2. Please provide driveway design drawings and details for driveway permit and any additional supporting documents. Three copies of the permit are required. 3. Signature required on Certification Page of Drainage Report. Reviewed by: Carol Cotter Date: June 9, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City of College Station will constitute a completely new review. Page 2 of 2 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone (979) 764 -3570 / Fax (979) 764 -3496 MEMORANDUM January 31, 2003 TO: Louise Fischer, Kerr Surveying, Via fax 691 -8904 FROM: Bridgette George, Assistant Development Manager SUBJECT: RICHARDS LOT 8 & 9 (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, February 10, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for February 20, 2003, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Documentation that the Parkland Dedication has been approved by the Parks & Recreation Board; Two (2) copies of the revised final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart @ci.college - station.tx.us Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will be pulled from the scheduled Planning & Zoning Commission Agenda. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Spencer Thompson or myself at 764 -3570. Attachments: Staff review comments cc: Jay Burch, P.O. Box 9925, College Station, TX, 77842 Case file #03- 00500016 Home of Texas AB&M University r i STAFF REVIEW COMMENTS NO. 1 Project: RICHARDS LOT 8 & 9 (FP) - 03 -016 ENGINEERING 1. Please provide survey information showing exact location of existing structure on Lot 8A. Property line created by plat can not create a nonconformity. It must meet zoning requirements/ set backs. Reviewed by: Spencer Thompson Date: January 30, 2003 PLANNING 1. It will be necessary to contact the Parks Board to address parkland dedication for this subdivision. 2. This plat requires a variance to Section 18 of the Subdivision Regulations. Please include the variance request with the application and address the 4 items required to grant said variance. 3. Please include plat acreage in title block. Reviewed by: Molly Hitchcock Date: January 23, 2003 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 2000i version of plat and /or site plan. email to rbolin ©ci.college - station.tx.us 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines. Reviewed by: Ronnie Bolin Date:1 -30 -02 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 2