Loading...
HomeMy WebLinkAboutStaff Comments E. a -10 -03 gL ASH & BROWNE ENGINEERING, INC. �3- Engineers and Consultants P.O. Box 10838, College Station, Texas 77842 979 - 846 -6914 877 - 245 -4839 Fax: 979 -846 -8914 February 7, 2003 Bridgette George Asst. Development Manager City of College Station P.O. Box 9960 College Station, Texas 77842 Re.: Stonebrook Subdivision - Master Preliminary Plat COCS file #03- 00500018 Dear Mrs. George, This letter is in response to the City of College Station's comments on the Master Preliminary Plat submitted for Stonebrook Subdivision on January 27, 2003. Engineering Comments (Carol Cotter) 1. Building setback lines have been added to the preliminary plat. 2. The bearing for the northeast property line is already on the plat and has been revised for clarification. 3. Note #6 has been added to dedicate all Right -Of -Ways to the City of College Station. 4. Property boundaries have been added and clarified per your request. 5. There is currently an existing fire hydrant on Old Rock Prairie Road. To sufficiently accommodate the duplex subdivision and Reserve Tract 'A', there are fire hydrants on Limestone Drive and also on Stone Brook Extension. 6. Note #4 has been revised to require all property owners within 600 feet of well site to sign a waiver acknowledging the location and proximity of the well site. The public utility easement on the backs of lots 9 through 15 of Block 1 are more than 50 feet away from the well location itself. The easement for the well site and perimeter fencing is currently being adjusted via a separate instrument to reduce its size to accommodate the development. 7. The 10' -0" P.U.E. on the back of lots 6 through 15 of Block 1, adjoining Tract 'A', have been expanded to 20 P.U.E. per your request. 8. The 7'-6" P.U.E. has been revised to a 10' -0" P.U.E. split down the property line per your request. 9. A 10'-0" P.U.E. has been added to the sanitary sewer line behind the Rock Prairie Baptist Church per your request. 10. The Right -Of -Ways for Limestone Drive and Stone Brook Extension have been (: \Projects \1045 - Munsey Developments \004 - Rock Prairie Meadows -17 acres\Docs\staff- comments- reply .wpd revised per your request. 11. The distances from the centerline of the streets to the nearest edges of the opposite and adjacent roadways and driveways have been added per your request. 12. Note #7 has been added to address the City's Bikeway and Pedestrian Master Plan. 13. Lots 6 & 7 of Block 1 have been revised to meet minimum lot requirements per City of College Station Zoning Ordinance. 14. Note #8 has been added to note the placement of parking for Lot 9 of Block 3. 15. Lot 7 of Block 2 has been revised to meet minimum lot requirements per City of College Station Zoning Ordinance. 16. The storm water detention area has been revised to Reserve Tract 'B'. Note #9 has been added to the plat to note that it will be maintained by the Home Owner's Association. 17. Upon being surveyed, this property shall be tied to the existing city monument #130 at the intersection of Woodcreek Drive and Hwy. 6 northbound access road. 18. Note #7 has been added to address the City's Pedestrian Master Plan, which includes sidewalks for this development. Thank you for your time and help on this project. Please call me if you have any questions. Sincerely, ASH : BR WNE ENGINEERING, INC. / • J• - -t s, P.E. P oject Engineer F:\Projecls \1045 - Munsey Developments1004 - Rock Prairie Meadows -17 acres\Docs\staff- comments - reply.wpd