Loading...
HomeMy WebLinkAboutStaff Report STAFF REPORT Project Manager: Jennifer Reeves, Staff Planner Report Date: July 14, 2005 Email: jreeves @cstx.gov Meeting Date: August 4, 2005 Item: Presentation, discussion, and possible action on a Final Plat for Phase 1 of Meadowcreek Subdivision, consisting of 90 lots on 20.919 acres, generally located on the south side of Koppe Bridge Road just west of the Wellborn Community in the City's ETJ. Applicant: Chris Menger, Agent for Main Street Homes -CS, LTD, Owner Staff Recommendations: Staff recommends approval of the Final Plat as submitted. Item Summary: This property is located on Koppe Bridge Road just west of Wellborn Community. Phase 1 of Meadowcreek Subdivision consists of 90 lots and is part of a proposed 338 lot development in the City's ETJ. All of the lots will be approximately 0.15 acres. Koppe Bridge Road is a Minor Collector on the City's Thoroughfare Plan. Additional right -of -way for Koppe Bridge Road is being dedicated this Plat. This Final Plat meets the minimum requirements for ETJ subdivisions. Water will be provided by Wellborn Special Utility District (SUD). A wastewater treatment plant has been permitted by the Texas Commission on Environmental Quality (TCEQ) and will also be owned and operated Wellborn SUD. Street construction within the subdivision will be to City standards and will include curb and gutter. This allows for reduced lot width compared to the minimum requirement of 100 feet for a rural designed road. Comprehensive Plan Considerations: The subject property is located in the (ETJ) Extra Territorial Jurisdiction. Item Background: December 2, 2004 the Commission unanimously approved the Preliminary Plat. Budgetary & Financial Summary: N/A Supporting Materials: 1. Location Map 2. Aerial Map 3. Application 4. Copy Final Plat FILE NOTES Project: Meadowcreek Phase 1 Final Plat (05 -10) Telecom: Brian Serant, TCEQ Carol Cotter, COCS Public Works gi Date: August 2, 2005 Re: Discharge Permit for Wastewater Treatment Plant The Discharge permit was renewed on July 9, 2004. Two notifications were required and published. The first notice was published 12/01/03, and the second 05/10/04. The comment period ended on 06/09/04. No comments were received during the comment period, and the permit was renewed. There is a 23 day period from the date the permit is issued in which a motion to revoke can be made; however, no motion was made, and the period expired on 08/09/04. Four commenters are shown in the file and are from the letter sent by the adjacent property owners on May 11, 2005. No action will be taken from this letter as it was received after the comment period. ■ CITY OF COLLEGE STATION Planning & Development Services CITY OF COLLEGE STATION PLANNING & DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979)764 -3570 / Fax (979)764 -3496 TO: MAIN STREET HOMES - CS, LTD. RE: MEADOWCREEK SUBDIVISION PHASE 1 FAX: 512 -478 -5678 FROM: Lisa Lindgren, Staff Assistant DATE: August 3, 2005 RE: Agenda & Staff Report P &Z Meeting, August 4, 2005 Following this coversheet is a copy of the Staff Report that was prepared for the above referenced project. Please keep in mind that staff's responsibility is to provide the Planning & Zoning Commission with all pertinent facts of a development case, but that staff is not acting as an advocate for the applicants. Therefore, it is in the applicant's best interest to send a representative to the Planning & Zoning Commission meeting to speak on behalf of the proposal. This item is scheduled for the August 4, 2005, Planning & Zoning Commission Meeting. This meeting will begin at 7:00 P.M. in the City Hall Council Chambers., 1101 Texas Avenue. I have included a copy of the agenda for this meeting. Please contact our office at (979) 764 -3570 if you should have any questions. Thanks. CITY OF COLLEGE STATION Planning er Development Services CITY OF COLLEGE STATION PLANNING & DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979)764 -3570 / Fax (979)764 -3496 TO: MAIN STREET HOMES — CS, LTD. CHRIS MENGER RE: MEADOWCREEK SUBDIVISION PHASE 1 FAX: 512 -478 -5678 FROM: Lisa Lindgren, Staff Assistant DATE: August 3, 2005 RE: Agenda & Staff Report P &Z Meeting, August 4, 2005 Following this coversheet is a copy of the Staff Report that was prepared for the above referenced project. Please keep in mind that staffs responsibility is to provide the Planning & Zoning Commission with all pertinent facts of a development case, but that staff is not acting as an advocate for the applicants. Therefore, it is in the applicant's best interest to send a representative to the Planning & Zoning Commission meeting to speak on behalf of the proposal. This item is scheduled for the August 4, 2005, Planning & Zoning Commission Meeting. This meeting will begin at 7:00 P.M. in the City Hall Council Chambers., 1101 Texas Avenue. I have included a copy of the agenda for this meeting. Please contact our office at (979) 764 -3570 if you should have any questions. Thanks. Grff 1414 CITY OF COLLEGE STATION Planning & Development Services CITY OF COLLEGE STATION PLANNING & DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979)764 -3570 / Fax (979)764 -3496 TO: TEXCON JOE SCHULTZ, P.E. RE: MEADOWCREEK SUBDIVISION PHASE 1 FAX: 979 - 764 -7759 FROM: Lisa Lindgren, Staff Assistant DATE: August 3, 2005 RE: Agenda & Staff Report P&Z Meeting, August 4, 2005 Following this coversheet is a copy of the Staff Report that was prepared for the above referenced project. Please keep in mind that stars responsibility is to provide the Planning & Zoning Commission with all pertinent facts of a development case, but that staff is not acting as an advocate for the applicants. Therefore, it is in the applicant's best interest to send a representative to the Planning & Zoning Commission meeting to speak on behalf of the proposal. This item is scheduled for the August 4, 2005, Planning & Zoning Commission Meeting. This meeting will begin at 7:00 P.M. in the City Hall Council Chambers., 1101 Texas Avenue. I have included a copy of the agenda for this meeting. Please contact our office at (979) 764 -3570 if you should have any questions. Thanks. STAFF REPORT Project Manager: Jennifer Reeves, Staff Planner Report Date: July 14, 2005 Email: jreeves @cstx.gov Meeting Date: August 4, 2005 Item: Presentation, discussion, and possible action on a Final Plat for Phase 1 (..) of Meadowcreek Subdivision, consisting of 90 lots on 20.919 acres, generally located on the south side of Koppe Bridge Road just west of the Wellborn Community in the City's ETJ. Applicant: Chris Menger, Agent for Main Street Homes -CS, LTD, Owner Staff Recommendations: Staff recommends approval of the Final Plat as submitted. Item Summary: This property is located on Koppe Bridge Road just west of Wellborn Community. Phase 1 of Meadowcreek Subdivision consists of 90 lots and is part of a proposed 338 lot development in the City's ETJ. All of the lots will be approximately 0.15 acres. Koppe Bridge Road is a Minor Collector on the City's Thoroughfare Plan. Additional right -of -way for Koppe Bridge Road is being dedicated this Plat. This Final Plat meets the minimum requirements for ETJ subdivisions. Water will be provided by Wellborn Special Utility District (SUD). A wastewater treatment plant has been permitted by the Texas Commission on Environmental Quality (TCEQ) and will also be owned and operated Wellborn SUD. Street construction within the subdivision will be to City standards and will include curb and gutter. This allows for reduced lot width compared to the minimum requirement of 100 feet for a rural designed road. Comprehensive Plan Considerations: The subject property is located in the (ETJ) Extra Territorial Jurisdiction. Item Background: December 2, 2004 the Commission unanimously approved the Preliminary Plat. Budgetary & Financial Summary: N/A Supporting Materials: 1. Location Map 2. Aerial Map 3. Application 4. Copy Final Plat