Loading...
HomeMy WebLinkAboutDevelopment Permit 02/14/01 10:35 FAX 817 640 9474 FAIRFIELD 4003 /003 0:0 DEVELOPMENT PERMIT PERMIT NO. 500027 COLLEGE SEAEION DP- FAIRFIELD AT LUTHER FLOOD FOR AREAS OUT OF THE RE: CHAPTER 13 OF THE COLLEGE STATION TT C AREA SITE LEGAL DESCRIPTION: SITE ADDRESS: LUTHER STREET IMPROVEMENTS 2001 HOLLEMAN DR W FROM MELROSE APTS. TO 1 DRAINAGE BASIN: FM 2818 1 J v 0t/ WHITE CREEK DATE OF ISSUE: January 19, 2001 VALID FOR 6 MONTHS OWNER: CONTRACTOR: ARAPAHO LTD 4 11Ag < 1 vn was -' o / C/O EDSEL G JONES pry� OA - 011e CM 1 >NC • COLLEGE STATION, TX 77840 r J TYPE OF DEVELOPMENT: CLEARING AND GRADING ONLY SPECIAL CONDITIONS: Contact Bob Mosley, P.E. , City Engineer, City of College Station Public Works Department, to coordinate construction; 979- 764 -3690. All construction must be in compliance with the approved construction plans. All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter. Trees required to be protected by 1rdinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. If prescribed SWPPP measures are inadequate, it is the contractors duty to implement corrective measures. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. inistrator/Re re entative Dat .-16n I 12-4 101 Owner /Agent/ Contractor Date 02/14/01 10:35 FAX 817 640 9474 FAIRFIELD 4 002/003 ‘/ DEVELOPMENT PERMIT PERMIT NO. 500027 COLLEGE STATION DP- FAIRFIELD AT LUTHER FOR AREAS NOT IN THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: �o R•REe'T 1101 W. Luther St. DRAINAGE BASIN: White Creek DATE OF ISSUE: I /10 /01 VALID FOR MONTHS 6 mos OWNER: CONTRACTOR: To be named Fairfield Development ' 2045 N. Hwy. 360 Ste. 250 Grand Prairie, TX 75050 TYPE OF DEVELOPMENT: Multi- family housing SPECIAL CONDITIONS: CLEARING AND GRADING PERMIT, Contact TXDOT per construction plans All construction must be in compliance with the approved construction plans All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter. ie Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site In accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. • In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area not in the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. �r • ( Lc r finis ato . • five Da e , (0 at '4,— 1 Al L.. ► vdner /Agent! Contr .," or Date • a DEVELOPMENT PERMIT PERMIT NO. 500027 COLLEGL STATION DP- FAIRFIELD AT LUTHER FOR AREAS NOT IN THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: - SITE ADDRESS: 1101 W. Luther St. DRAINAGE BASIN: White Creek DATE OF ISSUE: 1/10/01 VALID FOR MONTHS 6 mos OWNER: CONTRACTOR: To be named Fairfield Development • 2045 N. Hwy. 360 Ste. 250 Grand Prairie, TX 75050 TYPE OF DEVELOPMENT: Multi- family housing SPECIAL CONDITIONS: CLEARING AND GRADING PERMIT, Contact TXDOT per construction plans All construction must be in compliance with the approved construction plans All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter. me Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site In accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shalt be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. • In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area not in the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. .....c II 11. A . il ( °) 0 t • e • inis ato ' se. .tive Da e � /44m 1 • L&' 1 t 'b e vdner /Agent/ Contr.e or Date ` DEVELOPMENT o PERMIT COLLEGE STATION DP- FAIRFIELD AT LUTHER FOR AREAS OUT OF THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: LUTHER STREET IMPROVEMENTS 1101 W. Luther Street FROM MELROSE APTS. TO DRAINAGE BASIN: FM 2818 WHITE CREEK DATE OF ISSUE: January 19, 2001 VALID FOR 6 MONTHS OWNER: CONTRACTOR: Fairfield Development To be named 2045 N. Hwy. 360 Ste. 250 Grand Priairie, TX 75050 TYPE OF DEVELOPMENT: CLEARING AND GRADING ONLY SPECIAL CONDITIONS: Contact Bob Mosley, P.E. , City Engineer, City of College Station Public Works Department, to coordinate construction; 979 - 764 -3690. All construction must be in compliance with the approved construction plans. All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter. Trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. If prescribed SWPPP measures are inadequate, it is the contractors duty to implement corrective measures. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. L7 , 0 � b D A ministrato 4 • •resentativ Date Owner /Agent/ Contractor Date .L..vvri Uv0 - DEVELOPMENT PERMIT PERMIT NO. 500027 COLIIGI. STATION DP- FAIRFIELD AT LUTHER FOR AREAS NOT IN THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: 1101 W_ Luther St. DRAINAGE BASIN: White Creek DATE OF ISSUE: I /10/01 VALID FOR MONTHS 6 mos OWNER: CONTRACTOR: To be named Fairfield Development ' 2045 N. Hwy. 360 Ste. 250 Grand Prairie, TX 75050 TYPE OF DEVELOPMENT: Multi- family housing SPECIAL CONDITIONS: CLEARING AND GRADING PERMIT, Contact TXDOT per construction plans All construction must be in compliance with the approved construction plans All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter. fie Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site In accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for . temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. • In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area not in the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. I t • •' finis ato .� -se. • tive Da e 1 to ivi e er /Agent/ Contr. . • or Date DEVELOPMENT PERMIT PERMIT NO. 500027 COLLEGE STATION DP- FAIRFIELD AT LUTHER FOR AREAS OUT OF THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: LUTHER STREET IMPROVEMENTS 1101 W. Luther Street FROM MELROSE APTS. TO DRAINAGE BASIN: FM 2818 WHITE CREEK DATE OF ISSUE: January 19, 2001 VALID FOR 6 MONTHS OWNER: CONTRACTOR: Fairfield Development To be named 2045 N. Hwy. 360 Ste. 250 Grand Priairie, TX 75050 TYPE OF DEVELOPMENT: CLEARING AND GRADING ONLY SPECIAL CONDITIONS: Contact Bob Mosley, P.E. , City Engineer, City of College Station Public Works Department, to coordinate construction; 979 - 764 -3690. All construction must be in compliance with the approved construction plans. All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter. Trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and /or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. If prescribed SWPPP measures are inadequate, it is the contractors duty to implement corrective measures. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. • ` : � trato rR - i re; ; iv- Dat 0 7//' / Owner / ; , ent/ Contractor Date DEVELOPMENT PERMIT PERMIT NO. 500027 COLLEGE STATION DP- FAIRFIELD AT LUTHER FOR AREAS NOT IN THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: Williams Addition 1101 W. Luther St. Corner of FM 2818 and Luther Street DRAINAGE BASIN: White Creek DATE OF ISSUE: 02/19/01 VALID FOR 6 MONTHS OWNER: CONTRACTOR: To be named Fairfield Development 2045 N. Hwy. 360 Ste. 250 Grand Prairie, TX 75050 TYPE OF DEVELOPMENT: Multi- family housing SPECIAL CONDITIONS: FULL DEVELOPMENT PERMIT, Contact TXDOT per construction plans All construction must be in compliance with the approved construction plans All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter. Submit TXDOT permits to this office. They will be reviewed and forwarded. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and /or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and /or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. If approved control devices are not effective, correction must be made to ensure effectiveness. I hereby grant this permit for development of an area not in the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. // c cc, ( d istrator /' • I a 've Date eti . . / / � / Owner ' gent/ Contractor Date DEVELOPMENT PERMIT PERMIT NO. 500027 COLLEGE STATION DP- FAIRFIELD AT LUTHER FOR AREAS NOT IN THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: SITE ADDRESS: 1 `l - S - 1101 W. Luther St. a\ L.. r DRAINAGE BASIN: White Creek DATE OF ISSUE: 1 /10 /01 VALID FOR MONTHS 6 mos OWNER: CONTRACTOR: To be named Fairfield Development 2045 N. Hwy. 360 Ste. 250 Grand Prairie, TX 75050 TYPE OF DEVELOPMENT: Multi- family housing SPECIAL CONDITIONS: CLEARING AND GRADING PERMIT, Contact TXDOT per construction plans All construction must be in compliance with the approved construction plans All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area not in the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. (v 0 finis ato ;Native - - ative Da e i., i � 1 10 V' ner /Agent/ Contr.A or Date NIP .k