Loading...
HomeMy WebLinkAboutDrainage ReportDRAINAGE REPORT MiTA Precision Tune Lot 4, Block "B" Ashford Square Subdivision Morgan Rector Survey, A46 College Station, Brazos County, Texas 16- December, 1999 FOB G ( " T 41 LPN 1 ..` xoo DEVELOPED BY: W Jun Allega Allega Holiday Travel Six Desta Drive, Suite 1000 Midland, Texas 79702 (915) 682 -2817 PREPARED BY: Kling Engineering & Surveying 4103 Texas Avenue, Suite 212 Bryan, TX 77802 (409) 846 -6212 DRAINAGE REPORT for Precision Tune Lot 4, Block "B" Ashford Square Subdivision Morgan Rector Survey, A-46 College Station, Brazos County, Texas 16- December, 1999 GENERAL LOCATION & DESCRIPTION: The area to be developed consists of a 0.73 acre tract within the Ashford Square Subdivision (Lot 4, Block `B ") located adjacent to the southeast side of Southwest Parkway approximately 1000 feet east of the Texas Avenue (SH 6- Business) and Southwest Parkway intersection (see Appendix 1: "General Location Map "). Private, v- section, concrete alleys comprise the existing means of vehicle circulation around the tract as well as stormwater conveyance away from the tract. Currently, the lot is vacant. Existing ground cover consists of grass only with no trees. This site is not within the 100 year floodplain according to the Flood Insurance Rate Map for Brazos County, Texas and Incorporated Areas, Community No. 480083, Panel No. 0144C, effective date: July 2, 1992 (see Appendix 2: "Flood Insurance Rate Map "). Surrounding developments include a Wendy's restaurant to the west, a day care center to the east, and a pool hall to the south. Proposed improvements include an auto service center consisting of a 4200 sf metal building with associated drives, parking, and landscaping. DRAINAGE BASIN: The primary drainage basin for this area is the Bee Creek drainage basin. Stormwater runoff leaving the site is conveyed to a detention pond designed for the Ashford Square Duplex and Dartmouth Addition Apartment projects. The tract receives offsite runoff from a portion of the Wendy's parking lot. DRAINAGE DESIGN CRITERIA: Due to the expected increase in runoff; detention will be provided within the parking areas of the site. An analysis of existing conditions was made to determine design constraints. The Rational Method was used to determine pre and post - developed runoff rates from the site areas. Rational `C' factors of 0.25 for grassed areas and 0.90 for impervious areas were used. The project was analyzed with two drainage areas under pre - development conditions and five drainage areas under post - developed conditions. Detention pond routing was performed using the Level Pool Routing Method. This report documents the 2 - 100 year storm events. DRAINAGE ANALYSIS AND DESIGN: EXISTING CONDITIONS: The two drainage areas in the pre - developed or existing conditions analysis consist of the area within the bounds of the lot, 0.73 acres designated drainage area 1, and approximately 0. 17 acres of offshe contributing area from the Wendy's parking lot (refer to Appendix 3, "Drainage Area Map "). The following table summarizes these drainage area characteristics. inage Area Total Area (acre) Avg. C (pre) Tc Mn) 1 Foffsite 0.732 0.46 10 2.11 0.170 0.86 10 Table 1 (refer to Appendix 4, "Hydrologic Calculations for computation) Total pre - developed runoff rates for the various storm events are summarized in the following table. Drainage Area Q2 (mss) Q5 (c') Q10 WS) Q25 (ds) Q50 (ms Q100 (mss) 1 2.11 2.57 2.89 3.30 3.73 3.89 Offsite 0.92 1.12 1.26 1.44 1.63 1.70 Total / Allowed 3.04 3.69 4.14 4.73 3.35 5.59 Table 2 (refer to Appendix 4, Hydrologic Calculations for computation) PROPOSED CONDITIONS: Under post - developed or proposed conditions, the site is broken up into five drainage areas corresponding to post - developed drainage patterns (refer to Appendix 3, "Drainage Area Map "). The contributing offshe runoff is directed to proposed Pond Area 2 and is included as Pond Area 2 inflow. The following table summarizes post - developed drainage area characteristics (refer to Appendix 4 "Hydrologic Calculation" for computations). Drainage Area Total Area Avg. C Tc Description Q50 (ds) (acre) (post) (Min) 1.17 1R 0.192 0.79 10 consists of existing alley and 0.55 0.67 0.76 0.86 gassed area to remain - 1.02 DA -1 1.06 1.29 drains to alley 2R 0.122 0.72 10 consists of proposed parking 1.47 1.65 1.88 2.13 and grassed areas Offsite 0.92 1.12 1.26 - drains to alley DA -1 0.187 0.90 10 consists of proposed 6.43 1 7.34 1 8.30 8.66 Wilding, drive and parking areas - drains to Pond Area 1 DA -2 0.231 0.82 10 consists of proposed drive parking, and gassed areas - drains to Pond Area 2 Offsite 0.170 0.86 10 consists of existing drive, parking and grassed arras on Wendy's site to remain - dtains to Pond Area 2 Table 3 Total post - developed runoff rates for the various storm events are summarized in the following table. Area Q2 (ds) Q5 (ds) Q10 (ds) Q25 (ds) Q50 (ds) Q100 (ds) [72R 0.96 1.17 1.31 1.50 1.69 1.77 0.55 0.67 0.76 0.86 0.98 1.02 DA -1 1.06 1.29 1.45 1.66 1.88 1.96 DA -2 1.21 1.47 1.65 1.88 2.13 2.22 Offsite 0.92 1.12 1.26 1.44 1.63 1.70 Total 1 4.71 1 5.72 6.43 1 7.34 1 8.30 8.66 Table 4 (refer to Appendix 4, Hydrologic Calculations for computation) Attenuation of the expected increase in stormwater runoff will be achieved within the site access drive and parking areas. Two areas will be designated for detention ponds as shown in Appendix 3 and labeled Pond Area 1 and Pond Area 2 (refer to Appendix 5, "Grading Plan" for site elevations). Required attenuation for each storm event was determined by finding the difference in pre -vs- post development peak runoff rates. The following table summarizes detention requirements of the storm events analyzed. Table 5 (See Appendix 4, "Hydrologic Calculations" for computation) Drainage areas designated 1R and 2R will be released from the site undetained. The peak site runoff rate, including the released areas, will be at the pre - developed peak runoff rate. To determine allowable release rate from the detention ponds, the undetained site runoff was subtracted from the pre - developed peak runoff rate as follows: Qpn = Q1R + Q2R + QP.*1 &2 QPond61 &2 = QPn - Q1R - Q2R Results for allowable pond outflow calculations are tabulated below. AREA STORM BETURN CONDITION Q2 Q5 Q10 Q25 Q50 Q100 3.04 (ds) WS) WS) WS) WS) WS) PRE 3.04 3.69 4.14 4.73 5.35 5.59 POST 4.71 5.72 6.43 7.34 8.30 8.66 REQUMM 1.67 2.03 2.28 2.61 2.95 3.08 ATTENUATION Table 5 (See Appendix 4, "Hydrologic Calculations" for computation) Drainage areas designated 1R and 2R will be released from the site undetained. The peak site runoff rate, including the released areas, will be at the pre - developed peak runoff rate. To determine allowable release rate from the detention ponds, the undetained site runoff was subtracted from the pre - developed peak runoff rate as follows: Qpn = Q1R + Q2R + QP.*1 &2 QPond61 &2 = QPn - Q1R - Q2R Results for allowable pond outflow calculations are tabulated below. AREA STORM RETURN Q2 (mss) Q5 WS) Q10 WS) Q25 (ds) Q50 (mss) Q100 (ds) PRE 3.04 3.69 4.14 4.73 5.35 5.59 1R 0.96 1.17 1.31 1.50 1.69 1.77 2R 0.55 0.67 0.76 0.86 0.98 1.02 ALLOWABLE POND OUTFLOW 1.52 1.85 2.08 2.37 2.68 2.80 Table 6 The design grades for the detention pond areas are based on obtaining a maximum depth of 0.83' as allowed by City Drainage Policy and Design Standards for impoundment of water in parking areas. Outlet structures for the two pond areas consist of a 1' wide rectangular curb opening for Pond Area 1 and a 0.5' wide rectangular opening for Pond Area 2. Both are modeled as weirs. Pond Area 2 includes a 3' wide (inside dimension) concrete flume located adjacent to the access drive. Water is metered out to the existing v- section alley via the above mentioned 0.5' rectangular opening (refer to Appendix 5, "Grading Plan" for graphical representation). The following table summarizes pond routing results for the various design storm events. Table 7 (Refer to Appendix 4, "Hydrologic Calculations" for computation) Peak pond depths are kept below the maximum 0.83' as allowed by City policy. Maximum depths occur at the 100 year event and are 0.64' and 0.67 for Pond Areas 1 and 2 respectively. There will be the inconvenience of parking lot and driveway ponding depths at 0.45' +, or 5.4 " +, for the 2 year and above storm returns. Total peak runoff leaving the site under post - developed conditions are tabulated in the following table. AREA STORM RETURN CHARACTERISTIC 2 YR 5 YR 10 YR 25 YR 50 YR 100 YR Pond Area 1- Peak Inflow 1.07 1.30 1.46 1.67 1.89 1.97 (Cfs) 0.67 0.76 0.86 1 0.98 1.02 Pond Area 1 Pond Area 1- Peak Outflow 0.84 0.98 1.10 1.21 1.31 1.35 (Cfs) 0.72 0.75 0.80 0.84 0.86 Total Site Runoff Pond Area 1- Peak Depth 0.45 0.51 0.54 0.59 0.63 0.64 (ft) 3.69 4.14 4.73 5.35 5.59 Pond Area 2 - Peak Inflow 2.15 2.61 2.93 3.35 3.79 3.95 (cfs) Pond Area 2 - Peak Outflow 0.64 0.72 0.75 0.80 0.84 0.86 (cfs) Pond Area 2 - Peak Depth 0.42 0.50 0.54 0.59 0.64 (ft) Total Outflow from Ponds 1.48 1.70 1.85 2.01 2.15 J2.90 Allowable Pond Outflow 1.52 1.85 2.08 2.37 2.68 Attenuation Achieved: ✓ ✓ ✓ Table 7 (Refer to Appendix 4, "Hydrologic Calculations" for computation) Peak pond depths are kept below the maximum 0.83' as allowed by City policy. Maximum depths occur at the 100 year event and are 0.64' and 0.67 for Pond Areas 1 and 2 respectively. There will be the inconvenience of parking lot and driveway ponding depths at 0.45' +, or 5.4 " +, for the 2 year and above storm returns. Total peak runoff leaving the site under post - developed conditions are tabulated in the following table. AREA STORM RETURN Q2 (cfs) 5 YR (cfs) 10 YR (cfs) 25 YR (Cfs) 50 YR (cfs) 100 YR (cfs) 1R 0.96 1.17 1.31 1.50 1.69 1.77 2R 0.55 0.67 0.76 0.86 1 0.98 1.02 Pond Area 1 0.84 0.98 1.10 1.21 1.31 1.35 Pond Area 2 0.64 0.72 0.75 0.80 0.84 0.86 Total Site Runoff 2.99 3.54 3.92 4.37 4.82 5.00 Pre - Develo 3.04 3.69 4.14 4.73 5.35 5.59 Table 8 Total post - developed runoff rates leaving the site are kept at or below pre - developed conditions. CONCLUSIONS: Storm water runoff from the site will be released at or below pre- developed/existing conditions runoff rates. Detention of excess stormwater will be accomplished within the parking and driveway areas of the site. No adverse effects are expected to upstream or downstream properties or structures. "I hereby certify that this report for the drainage design of Precision Tune, Lot 4, Block `B' of Ashford Square Subdivision was prepared under my supervision in accordance with the provisions of the City of College Station Drainage Policy and Design Standards for the owners thereof." tot �g APPENDICES 1) General Location Map - City of College Station 2' Contour Map 2) Flood Insurance Rate Map - F.E.M.A. 3) Drainage Area Maps 4) Hydrologic Calculations 5) Grading Plan E:%Proj9ctMPrecWw Tunelddp.wpd r 9 APPENDIX 1 GENERAL LOCATION MAP 9 SCALE: 1 " =200' I x .4 I/ ✓ \, < 1 �. x 27 �\ 2 3 ' x 279.4 287.2 x 1 / x PROJECT LOCATION 1 C 1 \ \J z>o \� -- \ � x27°• _ � l / � � J / 1 � `.� Via �\ 278 w ooe C 76. 75 X 279. / 1 V / — �I KUNG EMM EMM & SURVETG BRYAN. TEXAS APPENDIX 2 FLOOD INSURANCE RATE MAP - F.E.M.A. ZONE X APPROXIMATE SCALE 500 0 500FEET For 6.0 c For NATIONAL FLOOD INSURANCE PROGRAM City of College Station 480083 i FIRM FLOOD INSURANCE RATE MAP IIIIIIIIIIIII�I INCORPORATED Y AREAS PANEL 144 OF 250 i (SEE MAP INDEX FOR PANELS NOT PRINTED) CONTAINS: COMMUNITY NUMBER PANEL SUFFIX BRYAN. CITY OF 480082 0144 C COLLEGE STATION. CTFY OF 480083 0144 C Notice to User: The MAP NUMBER shown below should he used when placing map orders; the COMMUNITY NUMBER shown above should be used on insurance application for the subject community. MAP NUMBER 48041CO144 C EFFECTIVE DATE: JULY 2, 1992 Federal Emergency Management Agency APPENDIX 3 DRAINAGE AREA MAPS O Cr VALUE LEGEND 0. 25- 0.35- 0. 0.60- 0 0.35 1 0.50 1 1 0:60 1 0.70 �� 1 I t r �, I �� O Cr VALUE LEGEND 0. 25- 0.35- 0. 0.60- 0 0.35 1 0.50 1 1 0:60 1 0.70 a 1� X billivi 4) Of I DRAT AREA -0.90 ------ 4b� KAIMPUL ARCH -DA-2- C ove-0.82 77 DRAINAGE AREA VALUE LEGEND 025— 0.35— 0.50— 0:35 0.50 0.60 T%n A MT A r-410 A 10 10 A 'LAT A ID �� �w w��wwfAr TA APPENDIX 4 HYDROLOGIC CALCULATIONS December 09, 1999 INTENSITY CALCULATIONS BRAZOS COUNTY CONSTANTS FOR IDF CURVES FREQ e b d 2 0.805 65 8.0 5 0.785 76 8.5 10 0.763 80 8.5 25 0.754 89 8.5 50 0.745 98 8.5 100 0.730 96 8.0 INTENSITY -b/ c +d "e Tc min FRED 2 5 10 25 50 100 PRE - 1 10.00 6.33 7.69 8.63 9.86 11.15 11.64 :) FFSITE 10.00 6.33 7.69 8.63 9.86 11.15 11.64 POST - 1 R 10.00 6.33 7.69 8.63 9.86 11.15 11.64 211 10.00 6.33 7.69 8.63 9.86 11.15 11.64 DA -1 10.00 6.33 7.69 8.63 9.86 11.15 11.64 DA -2 10.00 6.33 7.69 8.63 9.86 11.15 11.64 D FFSITE 10.00 6.33 7.69 8.63 9.86 11.15 11.64 HYDROLOGIC CALCULATIONS December 09, 1999 RUN -OFF COEFFICIENT (C VALUE) CALCULATIONS C VALUES GRASS 0.25 IMPERV 0.90 DA AREA CMvE AREA IMPERV 05 TOTAL PRE EGRASS - PRE - - 1 3.036 0.2325 4.144 0.7322 0.4564 OFFSITE 0.0111 0.1589 0.46 0.1700 0.8576 2.571 2.885 3.295 3.725 3.890 OFFSITE POST - - 0.922 - - 1 R 0.0319 0.1600 0.1919 0.7919 211 0.0344 0.0877 0.1221 0.7169 DA -1 0.0000 0.1869 - 0.1869 0.9000 DA -2 0.0268 0.2045 8.297 0.2313 0.8247 OFFSITE 0.0111 0.1589 0.961 0.1700 0.8576 1.499 1.694 1.769 2R 10.00 0.72 where: C = (0.25' GRASS + 0.90 • IMPYTOTAL PEAK FLOW CALCULATIONS DA TC C VALUE AREA 02 05 010 Q25 Q50 Q100 PRE - - - 3.036 3.692 4.144 4.733 5.350 5.586 1 10.00 0.46 0.732 2.114 2.571 2.885 3.295 3.725 3.890 OFFSITE 10.00 0.86 0.170 0.922 1.121 1.259 1.438 1.625 1.697 POST - - - 4.708 5.725 6.426 7.339 8.297 8.662 1 R 10.00 0.79 0.192 0.961 1.169 1.312 1.499 1.694 1.769 2R 10.00 0.72 0.122 0.554 0.673 0.756 0.863 0.976 1.019 DA -1 10.00 0.90 0.187 1.064 1.294 1.452 1.659 1.875 1.958 DA -2 1 10.00 1 0.82 0.231 1.207 1.467 1.647 1 1.881 1 2.126 2.220 OFFSITE 10.00 0.86 0.170 0.922 1.121 1.259 1.438 1.625 1.697 where: Q = C -Value • Area' I I - is found in "Intensity Calculations" and corresponds to the appropriate Tc and frequency. DETENTION REQUIREMENT CALCULATIONS where: REQ. = POST - PRE HYDROLOGIC CALCULATIONS Q2 05 Q10 Q25 Q50 Q100 PRE 3.04 3.69 4.14 4.73 5.35 5.59 POST 4.71 5.73 6.43 7.34 8.30 8.66 REQ. 1.67 2.03 2.28 2.61 2.95 3.08 where: REQ. = POST - PRE HYDROLOGIC CALCULATIONS December 09, 1999 ALLOWABLE OUTFLOW CALCULATIONS where: ALLOW. = PRE -0 R +2R) FINAL SITE RUNOFF TABULATION 02 Q5 010 02 Q50 0100 PRE - 1 R 0.96 1.17 1.31 1.50 1.69 1.77 2R 0.55 0.67 0.76 0.86 0.98 1.02 ALLOW 1.52 1.85 2.08 2.37 2.68 2.80 where: ALLOW. = PRE -0 R +2R) FINAL SITE RUNOFF TABULATION HYDROLOGIC CALCULATIONS 11 11 11 1/ 11 11 HYDROLOGIC CALCULATIONS Job file: E: \HAESTAD \PONDPACK\PPK6 \PRECIS- 1 \PTUNE8.PPK Rain Dir: J: \KAESTAD \PPK6\UTIL\ JOB TITLE Precision Tune Ashford Square Subdivision Lot 4, Block *B' S /N: HOMOL0863131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Time: 11:47:45 Date: 12 -09 -1999 Table of Contents Table of Contents H knr *ww*w* et,t * *+e* **r **nrww POND VOLUMES * *w,r * * *w *,r,r *w *w* r,r* * * ** POND AREA 1..... Vol: Elev-Area ..................... 1.01 * * * * * * * * * * * * * * * * * * ** OUTLET STRUCTURES * * * * * * ** * * *** ** * * * *** PONDAREA 1..... Outlet Input Data .................. 2.01 Composite Rating Curve ............. 2.03 * * * * * * * * * * * * * * * * * * * * *** POND ROUTING * * * * * * * * * * * * * ** * * * * * * ** POND AREA 1..... Pond E -V -C Table ................... 3.01 POND AREA 1..... 10 YR Pond Routing Summary ............... 3.02 POND AREA 1..... 100 YR Pond Routing Summary ............... 3.03 POND AREA 1..... 2 YR Pond Routing Sumiary ............... 3.04 POND AREA 1..... 25 YR Pond Routing Summary ............... 3.05 POND AREA 1..... 5 YR Pond Routing Summary ............... 3.06 POND AREA 1..... 50 YR Pond Routing Summary ............... 3.07 S /N: HOMOLOS63131 KLING ENGINEERING Pond Pack Ver: 8-01 -98 (61) Compute Tim: 11:47:45 Date: 12-09 -1999 Type.... Vol: Etev -Area Pape 1.01 Name.... POND AREA 1 File.... E: \HAESTAD \PONDPACK\PPK6 \PRECIS- 1 \PTUNE8.PPK Title... POND AREA 1 Elevation Planimeter Area Al +A2 +sgr(A1 *A2) Volume Volume Sum (ft) ------------------------------------------------------------------------ (sq.in) ( sq.ft) (sq.ft) (cu.ft) ( cu.ft) 281.44 - - - -- 0 0 0 0 281.50 - - - -- 3 3 0 0 281.75 - - - -- 155 180 15 15 282.00 - - - -- 1189 1773 148 163 282.25 - - - -- 1668 4265 355 518 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2 -EL1) * (Areal + Area2 + sq.rt.(Areal *Area2)) where: ELI, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for ELI, EL2, respectively Volume Incremental volume between ELI and EL2 S /N: HOMOL0863131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Time: 11:47:45 Date: 12 -09 -1999 Type.... Outtet Input Data Page 2.01 Name.... POND AREA 1 File.... E: \HAESTAD \POMDPACK \PPK6 \PRECIS- 1 \PTUNE8.PPK REQUESTED POND WS ELEVATIONS: Min. Elev.= 281.44 ft Increment = .20 ft Max. Elev.= 282.25 ft .««••:•• ww, r•, t• w*•• ww ,r *rt.•w• «.wr,rw«rs * «.• «« OUTLET CONNECTIVITY �, rww,►, r, rrr�, �rnrittwwwr rrr�sirww «ww,rf,�,rr�,�srw *,►,rwrrr - - -> Forward Flow Only (UpStream to DnStream) < - -- Reverse Flow Only (DnStream to UpStream) < - - -> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------- - - - - -- - - -- - - - - - -- --- - - - - -- --- - - - - -- Weir- Rectangular 1 ---> TW 281.440 282.250 TW SETUP, DS Channel S /N: HOMOL0863131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Time: 11:47:45 Date: 12 -09 -1999 Type.... Outlet Input Data Name.... POND AREA 1 File.... E: \HAESTAD \POMDPACK \PPK6 \PRECIS- 1 \PTUNE8.PPK OUTLET STRUCTURE INPUT DATA Structure 10 = 1 Structure Type = Weir-Rectangular ------------------------------------ 8 of Openings a 1 Crest Elev. z 281.44 ft Weir Length a 1.00 ft Weir Coeff. = 3.000000 Weir TW effects (Use adjustment equation) Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximus Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. 0 tolerance = .10 cfs Max. 0 tolerance = .10 cfs Pape 2.02 S /N: H014OLOS63131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Tick: 11:47:45 Date: 12 -09 -1999 Type.... Composite Rating Curve Name.... POND AREA 1 File.... E: \HAESTAD \PONDPACK \PPK6 \PRECIS- 1 \PTUNE8.PPK * * *** COMPOSITE OUTFLOW SUMMARY ** ** WS Elev, Total C ---------------- Elev. Q ft cfs - - - - - -- - - - - - -- 281.44 .00 281.64 .26 281.84 .70 282.04 1.23 282.24 1.80 282.25 1.83 Notes -- - - - --- Converge ----------------------- TW Elev Error ft + / -ft Contributing Structures -- - - - - -- - - - -- ------------------ - - - - -- Free Outfall 1 Free Outfall 1 Free Outfall 1 Free Outfall 1 Free Outfall 1 Free Outfall 1 Page 2.03 S /N: HOMOL0S63131 KLING ENGINEERING Pond Pack Ver: 8-01 -98 (61) Compute Time: 11:47:45 Date: 12 -09 -1999 Type.... Pond E -V -G Table Name.... POND AREA 1 File.... E: \HAESTAD \PONDPACK\PPK6 \PRECIS- 1 \PTUNE8.PPK LEVEL POOL ROUTING DATA HYG Dir = E: \HAESTAD \PONDPACK \PPK6 \PRECIS -1\ Inflow HYG file = PT.HYG - PND1 10 YR Outflow HYG file w PT.HYG - PNO 1 OUT 10 YR Pond Node Data = POND AREA 1 Pond Volume Data = POND AREA 1 Pond Outlet Data = POND AREA 1 No Infiltration INITIAL CONDITIONS Starting WS Elev a 281.44 ft Pape 3.01 Starting Volume = 0 cu.ft Starting Outflow = .00 cfs Starting Infittr. _ .00 cfs Starting Total Gout= .00 cfs Time Increment = .0200 hrs Elevation Outflow Storage Area Infilt. G Total 2S /t + 0 ft cfs cu.ft sq.ft cfs cfs cfs ----------------------------------------------------------------------------- 281.44 .00 0 0 .00 .00 .00 281.64 .26 4 60 .00 .26 .36 281.84 .70 40 415 .00 .70 1.80 282.04 1.23 212 1260 .00 1.23 7.11 282.24 1.80 502 1647 .00 1.80 15.74 282.25 1.83 518 1668 .00 1.83 16.23 S /N: HOMOL0863131 KLING ENGINEERING Pond Pack Ver: 8 -01-98 (61) Compute Time: 11:47:45 Date: 12-09 -1999 Type.... Pond Routing Summary Page 3.02 Name.... POND AREA 1 Tag: 10 YR File.... E: \HAESTAD \PONDPACK \PPK6 \PRECIS- 1 \PTUNE8.PPK LEVEL POOL ROUTING SUMMARY HYG Dir = E: \HAESTAD \PONDPACK \PPK6 \PRECIS -1\ Inflow HYG file - PT.HYG - PND1 10 YR Outflow HYG file = PT.HYG - PND 1 OUT 10 YR Pond Node Data = POND AREA 1 Pond Volume Data = POND AREA 1 Pond Outlet Data = POND AREA 1 No Infiltration INITIAL CONDITIONS Starting WS Elev = 281.44 ft Starting Volume a 0 cu.ft Starting Outflow z .00 cfs Starting Infiltr. _ .00 cfs Starting Total Oout= .00 cfs Time Increment = .0200 hrs INFLOW /OUTFLOW HYDROGRAPH SUMMARY zsssazxssszass sass: sss szzzxsaax =szsz = =sxzz = = = =a =azx == Peak Inflow a 1.46 cfs at .1668 hrs Peak Outflow z 1.08 cfs at .2068 hrs ----------------------------------------------------- Peak Elevation z 281.98 ft Peak Store" = 144 cu.ft s== zzzza= zzsaasazxaazzsaz = ====zzzzazzzz == =s=ass =z===z MASS BALANCE (cu.ft) -------------------------- + Initial Vol - 0 • HYG Vol IN = 880 - Infiltration = 0 - NYG Vol OUT = 880 - Retained Vol = 0 Unrouted Vol =- cu.ft (.000% of Inflow Volume) WARNING: Inflow hydrograph truncated on left side. S /N: H014OLOS63131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Time: 11:47:45 Date: 12 -09 -1999 Type.... Pond Routing Summary Pape 3.03 Name.... POND AREA 1 Tag: 100 YR File.... E: \HAESTAD \POMDPACK\PPK6 \PRECIS- 1 \PTUNE8.PPK LEVEL POOL ROUTING SUMMARY HYG Dir = E: \HAESTAD \PONDPACK \PPK6 \PRECIS -1\ Inflow HYG file = PT.HYG - PMD1 100 YR Outflow HYG file = PT.HYG - PND 1 OUT 100 YR Pond Node Data = POND AREA 1 Pond Volume Data = POND AREA 1 Pond Outlet Data = POND AREA 1 No Infiltration INITIAL CONDITIONS Starting WS Elev = 281.44 ft Starting Volume = 0 cu.ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Gout= .00 cfs Time Increment = .0200 hrs INFLOW /OUTFLOW HYDROGRAPH SUMMARY xaxxxxa== rxxa==== xmx =a= = =xxa = =x =xxxxxxx = == = =a =xxxxx Peak Inflow = 1.97 cfs at .1668 hrs Peak Outflow = 1.35 cfs at .2268 hrs ----------------------------------------------------- Peak Elevation 282.08 ft Peak Storage = 269 cu.ft xxzzxzz zz cz= azzz zz= x== zzzz=z= =x=xxzzx=x == = = = ==zzzz === MASS BALANCE ( cu.ft) + Initial Vol = 0 + HYG Vol IN = 1186 - Infiltration = 0 - HYG Vol OUT = 1186 - Retained Vol = 0 Unrouted Vol = 0 cu.ft (.000% of Outflow Volume) WARNING: Inflow hydrograph truncated on left side. S /N: H014OLDS63131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Time: 11:47:45 Date: 12-09 -1999 Type.... Pond Routing Summary Page 3.04 Name.... POND AREA 1 Tag: 2 YR File.... E: \HAESTAD \PONDPACK \PPK6 \PRECIS- 1 \PTUNE8.PPK LEVEL POOL ROUTING SUMMARY HYG Dir = E: \HAESTAD \PONDPACK \PPK6 \PRECIS -1\ Inflow HYG file a PT.HYG - PND1 2 YR Outflow HYG file = PT.HYG - PND 1 OUT 2 YR Pond Node Data a POND AREA 1 Pond Volume Data = POND AREA 1 Pond Outlet Data = POND AREA 1 No Infiltration INITIAL CONDITIONS Starting WS Elev a 281.44 ft Starting Volume a 0 cu.ft Starting Outflow = .00 cfs Starting Infiltr. a .00 cfs Starting Total Gout= .00 cfs Time Increment a .0200 hrs INFLOW /OUTFLOW HYDROGRAPH SUMMARY Peak Inflow a 1.07 cfs at .1668 hrs Peak Outflow a .84 cfs at .2068 hrs ----------------------------------------------------- Peak Elevation a 281.89 ft Peak Storage = 68 cu.ft s :ss :zsas asss azsaass sx assassa :szaasxaaxzxazaaxaxsxsxa MASS BALANCE ( cu.ft) -------------------------- + Initial Vol a 0 • HYG Vol IN a 645 - Infiltration a 0 - HYG Vol OUT a 645 - Retained Vol = 0 Unrouted Vol a- cu.ft (.000% of Inflow Volume) WARNING: Inflow hydrograph truncated on left side. S /N: H014OL0S63131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Time: 11:47:45 Date: 12 -09 -1999 Type.... Pond Routing Suaaury Pape 3.05 Name.... POND AREA 1 Tag: 25 YR File.... E: \HAESTAD \PONDPACK\PPK6 \PRECIS- 1 \PTUNEB.PPK LEVEL POOL ROUTING SUMMARY HYG Dir = E: \HAESTAD \PONDPACK \PPK6 \PRECIS -1\ Inflow HYG file = PT.HYG - PND1 25 YR Outflow HYG file - PT.HYG - PND 1 OUT 25 YR Pond Node Data a POND AREA 1 Pond Volume Data = POND AREA 1 Pond Outlet Data a POND AREA 1 No Infiltration INITIAL CONDITIONS Starting WS Elev = 281.44 ft Starting Volume z 0 cu.ft Starting Outflow a .00 cfs Starting Infiltr. a .00 cfs Starting Total Gout= .00 cfs Time Increment z .0200 hrs INFLOW /OUTFLOW HYDROGRAPH SUMMARY Peak Inflow z 1.67 cfs at .1668 hrs Peak Outflow a 1.21 cfs at .2068 hrs ----------------------------------------------------- Peak Elevation 282.03 ft Peak Storage = 203 cu.ft zzxsz saz sxsxaaaasssssxxxxxxzxsxxsxxxxxxsxssssxxxsxxxs MASS BALANCE ( cu.ft) + Initial Vol = 0 + HYG Vol IN = 1005 - Infiltration - 0 - HYG Vol OUT = 1005 - Retained Vol z 0 Unrouted Vol =- cu.ft (.000% of Inflow Volume) WARNING: Inflow hydrograph truncated on left side. S /N: NOMOL0S63131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Time: 11:47:45 Date: 12 -09 -1999 Type.... Pond Routing Summary Page 3.06 Name.... POND AREA 1 Tag: 5 YR File.... E: \HAESTAD \POMDPACK \PPK6 \PRECIS- 1 \PTUNES.PPK LEVEL POOL ROUTING SUMMARY HYG Dir = E: \HAESTAD \PONDPACK \PPK6 \PRECIS -1\ Inflow HYG file = PT.HYG - PND1 5 YR Outflow HYG file = PT.HYG - PND 1 OUT 5 YR Pond Node Data = POND AREA 1 Pond Volume Data = POND AREA 1 Pond Outlet Data = POND AREA 1 No Infiltration INITIAL CONDITIONS Starting WS Elev = 281.44 ft Starting Volume z 0 cu.ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Gout= .00 cfs Time Increment z .0200 hrs INFLOW /OUTFLOW HYDROGRAPH SUMMARY Peak Inflow 1.30 cfs at .1668 hrs Peak Outflow = .98 cfs at .2068 hrs ----------------------------------------------------- Peak Elevation 281.95 ft Peak Storage = 107 cu.ft MASS BALANCE ( cu.ft) -------------------------- + Initial Vol = 0 • NYG Vol IN = 784 - Infiltration = 0 - HYG Vol OUT = 784 - Retained Vol - 0 Unrouted Vol =- cu.ft (.000% of Inflow Volume) WARNING: Inflow hydrograph truncated on left side. SIN: HOMOLOO63131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Time: 11:47:45 Date: 12 -09 -1999 Type.... Pond Routing Summary Page 3.07 Nance.... POND AREA 1 Tag: 50 YR File.... E:\HAESTAD \PONDPACK\PPK6 \PRECIS- 1 \PTUNE8.PPK LEVEL POOL ROUTING SUMMARY HYG Dir = E: \HAESTAD \PONDPACK \PPK6 \PRECIS -1\ Inflow HYG file z PT.HYG - PND1 50 YR Outflow HYG file z PT.HYG - PND 1 OUT 50 YR Pond Node Data z POND AREA 1 Pond Votuime Data = POND AREA 1 Pond Outlet Data = POND AREA 1 No Infiltration INITIAL CONDITIONS Starting WS Elev - 281.44 ft Starting Volume z 0 cu.ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Oout= .00 cfs Time Increment z .0200 hrs INFLOW /OUTFLOW HYDROGRAPH SUMMARY sssssssssssassssssss: sssssss :s :ssasssazssssxx :ssasaa= Peak Inflow = 1.89 cfs at .1668 hrs Peak outflow a 1.31 cfs at .2068 hrs ----------------------------------------------------- Peak Elevation 282.07 ft Peak Storage = 250 cu.ft MASS BALANCE ( cu.ft) -------------------------- + Initial Vol = 0 • HYG Vol IN = 1136 - Infiltration = 0 - HYG Vol OUT z 1136 - Retained Vol = 0 Unrouted Vol =- cu.ft (.000% of Inflow Volume) WARNING: Inflow hydrograph truncated on left side. S/M: NOMOLOS63131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) CoRmte Time: 11:47:45 Date: 12 -09 -1999 Job File: E: \HAESTAD \PONDPACK \PPK6 \PRECIS- 1 \PTUNE8.ppk Rain Dir: J: \HAESTAD \PPK6 \UTIL\ as :aaasasaazazssaaasaaaasa JOB TITLE Precision Tune Ashford Square Subdivision .ot 4, Block IBI S /N: HOMOL0863131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Time: 12:36:07 Date: 12 -09 -1999 Table of Contents Table of Contents a **** * * * * * * * * * * *****ww ** POND VOLUMES * * *** * * *** * * * ****** * * ** PONDAREA 2..... Vol: Elev -Area ..................... 1.01 * * * * * * * * * * * * * * * ***** OUTLET STRUCTURES * *** * * *** * * * * * * * * * * ** PONDAREA 2..... Outlet Input Data .................. 2.01 Composite Rating Curve ............. 2.03 * * * * * * * * ** * * * * * * *** **** POND ROUTING * *** * * * * * * * * * * ** ******* POND AREA 2..... Pond E-V -G Table ................... 3.01 POND AREA 2..... 10 YR Pond Routing Summary ............... 3.02 POND AREA 2..... 100 YR Pond Routing Summary ............... 3.03 POND AREA 2..... 2 YR Pond Routing Summary ............... 3.04 POND AREA 2..... 25 YR Pond Routing Summary ............... 3.05 POND AREA 2..... 5 YR Pond Routing Summary ............... 3.06 POND AREA 2..... 50 YR Pond Routing Summary ............... 3.07 S /N: HOMOLOS63131 KLING ENGINEERING Pond Pack Ver: 8 -01-98 (61) Compute Time: 12:36:07 Date: 12- 09-1999 Type.... Vol: ELev -Area Pape 1.01 Name.... POND AREA 2 File.... E: \HAESTAD \PONDPACK \PPK6 \PRECIS- 1 \PTUNE8.ppk Title... POND AREA 2 Elevation Planimeter Area Al +A2 +sgr(A1 *A2) Volume Volume Sum (ft) (sq.in) (sq.ft) ( sq.ft) (cu.ft) ( cu.ft) ------------------------------------------------------------------------ 280.71 - - - -- 0 0 0 0 281.00 - -- -- 174 174 17 17 281.25 - - - -- 2281 3085 257 274 281.50 - - - -- 3784 9003 750 1024 281.75 - - --- 4370 12220 1018 2043 281.83 - - - -- 4666 13552 361 2404 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-ELI) * (Areal + Area2 + sq.rt.(Areal *Areal)) where: ELI, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for ELI, EL2, respectively Volume = Incremental volume between ELI and EL2 S /N: HONOL0863131 KLING ENGINEERING Pond Pack Ver: 8 -01-98 (61) Compute Time: 12:36:07 Date: 12 -09 -1999 Type.... outlet Input Data Pape 2.01 Name.... POND AREA 2 File.... E: \HAESTAD \POMDPACK \PPK6 \PRECIS- 1 \PTUNES.ppk REQUESTED POND US ELEVATIONS: Min. Elev.- 280.71 ft Increment = .20 ft Max. Elev.= 281.83 ft w, rwi* iwwnrw, r, �► w, r, irw* w:, rww ,Rww*wriwww *w,►�i * OUTLET CONNECTIVITY •wff+►wwwwwr,r,rrfwwwfw,rwr + rtwww * wwrwrriww,rw # r «rt - - -> Forward Flow Only (UpStream to DnStream) < - -- Reverse Flow Only (DnStream to UpStream) < - - -> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft --- -------- -- -- -- - --- ------- -- --- ---- --- ------ Weir Rectangular 1 - - -> TY 280.710 281.830 TY SETUP, DS Channel S /N: HONOL0863131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Time: 12:36:07 Date: 12 -09 -1999 Type.... Outlet Input Data Name.... POND AREA 2 File.... E: \HAESTAD \PONDPACK \PPK6 \PRECIS- 1 \PTUNEB.ppk OUTLET STRUCTURE INPUT DATA Structure ID = 1 Structure Type = Weir-Rectangular # of Openings 1 Crest Elev. z 280.71 ft Weir length a .50 ft Weir Coeff. = 3.000000 Weir TW effects (Use adjustment equation) Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. 0 tolerance = .10 cfs Max. 0 tolerance = .10 cfs Page 2.02 S /N: HOMOLDS63131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Time: 12:36:07 Date: 12 -09 -1999 Type.... Composite Rating Curve Name.... POND AREA 2 File.... E:XHAESTAD \PONDPACK \PPK6 \PRECIS- 1 \PTUNES.ppk ** * ** COMPOSITE OUTFLOW SUMMARY * * ** WS Elev, Total C ---------------- Elev. G ft cfs - - - - - -- - - - - - -- 280.71 .00 280.91 .12 281.11 .32 281.31 .53 281.51 .73 281.71 .90 281.83 .98 Notes -- - ----- Converge ----------------------- TW Elev Error ft + /-ft Contributing Structures -- - - - - -- - - - -- ------------------ - - - - -- Free Outfall 1 Free Outfall 1 Free Outfall 1 Free Outfall 1 Free Outfall 1 Free Outfall 1 Free Outfall 1 Page 2.03 S /N: NONOL0S63131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Time: 12:36:07 Date: 12 -09 -1999 Type.... Pond E -V-G Table Nance.... POND AREA 2 file.... E: \HAESTAD \PONDPACK\PPK6 \PRECIS- 1 \PTUNE8.ppk LEVEL POOL ROUTING DATA HYG Dir = E: \HAESTAD \PONDPACK \PPK6 \PRECIS -1\ Inflow HYG file = PT.HYG - PND 2 IN 10 YR Outflow HYG file = PT.HYG - POND 2 OUT 10 YR Pond Node Data = POND AREA 2 Pond Volume Data = POND AREA 2 Pond Outlet Data = POND AREA 2 No Infiltration INITIAL CONDITIONS Starting WS Elev = 280.71 ft Page 3.01 Starting Volume = 0 cu.ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Gout= .00 cfs Time Increment = .0200 hrs Elevation Outflow Storage Area Infilt. G Total 2S /t + 0 ft cfs cu.ft sq.ft cfs cfs cfs ------------------------------------------------------------------------------ 280.71 .00 0 0 .00 .00 .00 280.91 .12 6 83 .00 .12 .28 281.11 .32 67 807 .00 .32 2.17 281.31 .53 420 2607 .00 .53 12.21 281.51 .73 1062 3807 .00 .73 30.23 281.71 .90 1870 4273 .00 .90 52.83 281.83 .98 2404 4666 .00 .98 67.75 S /N: H014OLOS63131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Time: 12:36:07 Date: 12 -09 -1999 Type.... Pond Routing Summary Pape 3.02 Name.... POND AREA 2 Tag: 10 YR File.... E: \HAESTAD \PONDPACK \PPK6 \PRECIS- 1 \PTUNES.ppk LEVEL POOL ROUTING SIINRARY HYG Dir = E: \HAESTAD \PONDPACK \PPK6 \PRECIS -1\ Inflow HYG file = PT.HYG - PND 2 IN 10 YR Outflow HYG file a PT.HYG - POND 2 OUT 10 YR Pond Node Data a POND AREA 2 Pond Volume Data a POND AREA 2 Pond Outlet Data = POND AREA 2 No Infiltration INITIAL CONDITIONS Starting WS Elev = 280.71 ft Starting Volume a 0 cu.ft Starting Outflow a .00 cfs Starting InfiLtr. a .00 cfs Starting Total Gout= .00 cfs Time Increment z .0200 hrs INFLOW /OUTFLOW HYDROGRAPH SUMMARY axxaxxss sxs msxxs a=s saxsxxxs sssxxs =smxxxxxx= = = =mxx =x == Peak Inflow a 2.93 cfs at .1668 hrs Peak Outflow a .75 cfs at .2868 hrs ----------------------------------------------------- Peak Elevation 281.54 ft Peak Storage = 1169 cu.ft ss asxxxxsxsxxxxxx= sxaasxxxxxxssxxxxxssxsxxxxxxs =sxsss NASS BALANCE ( cu.ft) -------------------------- + Initial Vol = 0 + HYG Vol IN = 1762 - Infiltration a 0 - HYG Vol OUT = 1762 - Retained Vol = 0 Unrouted Vol cu.ft (.002% of Inflow Volume) WARNING: Inflow hydrograph truncated on Left side. S /N: HOMOLOB63131 KLING ENGINEERING Pond Pack Ver: 8 -01-98 (61) Compute Time: 12:36:07 Date: 12 -09 -1999 Type.... Pond Routing Sumaery Pape 3.03 Name.... POND AREA 2 Tag: 100 YR File.... E: \HAESTAD \PDNDPACK \PPK6 \PRECIS- 1 \PTUNE8.ppk LEVEL POOL ROUTING SUMMARY HYG Dir = E: \HAESTAD \POMDPACK \PPK6 \PRECIS -1\ Inflow HYG file = PT.HYG - PND 2 IN 100 YR Outflow HYG file = PT.HYG - POND 2 OUT 100 YR Pond Node Data = POND AREA 2 Pond Volume Data = POND AREA 2 Pond Outlet Data = POND AREA 2 No Infiltration INITIAL CONDITIONS Starting WS Elev = 280.71 ft Starting Volume a 0 cu.ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total oout= .00 cfs Time Increment = .0200 hrs INFLOW /OUTFLOW HYDROGRAPH SUMMARY aaz xzx axz z==z az az xzax x===zz=saaxxxxxxxxxrxxxxsxxxx== Peak Inflow a 3.95 cfs at .1668 hrs Peak outflow = .86 cfs at .2868 hrs ----------------------------------------------------- Peak Elevation z 281.67 ft Peak Storage = 1684 cu.ft aazz= a== zz azzz= z= zazz= ==azaxzzxx===x====x==x =======zz MASS BALANCE ( cu.ft) -------------------------- + Initial Vol = 0 • HYG Vol IN = 2376 - Infiltration = 0 - HYG Vol OUT = 2376 - Retained Vol = 0 Unrouted Vol =- cu.ft (.002% of Inflow Volume) WARNING: Inflow hydrograph truncated an left side. S /N: NOMOL0863131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Time: 12:36:07 Date: 12 -09 -1999 Type.... Pond Routing Summary Page 3.04 Name.... POND AREA 2 Tag: 2 YR File.... E: \HAESTAD \POMDPACK \PPK6 \PRECIS- 1 \PTUNES.ppk LEVEL POOL ROUTING SUMMARY HYG Dir - E: \HAESTAD \PONDPACK \PPK6 \PRECIS -1\ Inflow HYG file a PT.HYG - PIN) 2 IN 2 YR Outflow HYG file = PT.NYG - POND 2 OUT 2 YR Pond Node Data = POND AREA 2 Pond Volume Data = POND AREA 2 Pond Outlet Data = POND AREA 2 No Infiltration INITIAL CONDITIONS Starting WS Elev = 280.71 ft Starting Volume a 0 cu.ft Starting Outflow a .00 cfs Starting Infiltr. _ .00 cfs Starting Total Gout= .00 cfs Time Increment a .0200 hrs INFLOW /OUTFLOW HYDROGRAPH SUMMARY sssssssssssssssssss ss s ssssssssssssssassssssaas :ssssss Peak Inflow = 2.15 cfs at .1668 hrs Peak Outflow .64 cfs at .2668 hrs ----------------------------------------------------- Peak Elevation 281.42 ft Peak Storage = 758 cu.ft MASS BALANCE ( cu.ft) -------------------------- + Initial Vol = 0 • HYG Vol IN = 1291 - Infiltration = 0 - HYG Vol OUT = 1291 - Retained Vol = 0 Unrouted Vol =- cu.ft (.004% of Inflow Volume) WARNING: Inflow hydrograph truncated on left side. S /N: H014OLOB63131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Time: 12:36:07 Date: 12 -09 -1999 Type.... Pond Routing Summary Page 3.05 Name.... POND AREA 2 Tag: 25 YR File.... E: \HAESTAD \PONDPACK\PPK6 \PRECIS- 1 \PTUNE8.ppk LEVEL POOL ROUTING SUMMARY HYG Dir a E: \HAESTAD \PONDPACK \PPK6 \PRECIS -1\ Inflow HYG file = PT.HYG - PND 2 IN 25 YR Outflow HYG file = PT.HYG - POND 2 OUT 25 YR Pond Node Data = POND AREA 2 Pond Volume Data a POND AREA 2 Pond Outlet Data a POND AREA 2 No Infiltration INITIAL CONDITIONS Starting WS Elev = 280.71 ft Starting Volume a 0 cu.ft Starting Outflow = .00 cfs Starting Infiltr. - .00 cfs Starting Total Gout= .00 cfs Time Increment z .0200 hrs INFLOW /OUTFLOW HYDROGRAPH SUMMARY ssz- sszzzszzz azzzz zxsz a=zaszzzzax=zzzzz== = = = = == a = = = == Peak Inflow a 3.35 cfs at .1668 hrs Peak Outflow - .80 cfs at .2868 hrs ----------------------------------------------------- Peak Elevation = 281.59 ft Peak Storage a 1373 cu.ft zssssaszassz =: sax==- zsaaxsssss asssaaxx = =sss= a = = =s = =aa MASS BALANCE ( cu.ft) -------------------------- + Initial Vol - 0 • HYG Vol IN a 2013 - Infiltration = 0 - HYG Vol OUT a 2013 - Retained Vol = 0 Unrouted Vol =- cu.ft (.002% of Inflow Volume) WARNING: Inflow hydrograph truncated on left side. S /N: H0I4OLOS63131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Time: 12:36:07 Date: 12 -09 -1999 Type.... Pond Routing Summary Page 3.06 Name.... POND AREA 2 Tag: 5 YR File.... E: \HAESTAD \PONDPACK \PPK6 \PRECIS- 1 \PTUNES.ppk LEVEL POOL ROUTING SUMMARY HYG Dir = E: \HAESTAD \PONDPACK\PPK6 \PRECIS -1\ Inflow HYG file = PT.HYG - PND 2 IN 5 YR Outflow HYG file = PT.HYG - POND 2 OUT 5 YR Pond Node Data = POND AREA 2 Pond Volume Data = POND AREA 2 Pond Outlet Data = POND AREA 2 No Infiltration INITIAL CONDITIONS Starting WS Etev = 280.71 ft Starting Volume = 0 cu.ft Starting Outflow a .00 cfs Starting Infiltr. _ .00 cfs Starting Total Oout= .00 cfa Time increment = .0200 hrs INFLOW /OUTFLOW HYDROGRAPH SLHNARY Peak Inflow a 2.61 cfs at .1668 hrs Peak Outflow z .72 cfs at .2868 hrs ----------------------------------------------------- Peak Elevation 281.50 ft Peak Storage = 1007 cu.ft MASS BALANCE ( cu.ft) -------------------------- + Initial Vol - 0 • HYG Vol IN z 1570 - Infiltration = 0 - HYG Vol OUT = 1570 - Retained Vol s 0 Unrouted Vol =- cu.ft (.002% of Inflow Volume) WARNING: Inflow hydrograph truncated on left side. S /N: H014OL0863131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Time: 12:36:07 Date: 12 -09 -1999 Type.... Pond Routing Summary Page 3.07 Name.... POND AREA 2 Tag: 50 YR File.... E:\HAESTAD \PONDPACK \PPK6 \PRECIS- 1 \PTUNE8.ppk LEVEL POOL ROUTING SUMMARY HYG Dir = E: \HAESTAD \POMDPACK\PPK6 \PRECIS -1\ Inflow NYG file = PT.HYG - PND 2 IN 50 YR Outflow HYG file = PT.HYG - POND 2 OUT 50 YR Pond Node Data = POND AREA 2 Pond Volume Data = POND AREA 2 Pond Outlet Data = POND AREA 2 No Infiltration INITIAL CONDITIONS Starting WS Elev = 280.71 ft Starting Volume 0 cu.ft Starting Outflow = .00 cfs Starting Infiltr. a .00 cfs Starting Total oout= .00 cfs Time Increment z .0200 hrs INFLOW /OUTFLOW HYDROGRAPH SUMMARY Peak Inflow a 3.79 cfs at .1668 hrs Peak Outflow a .84 cfs at .2868 hrs ----------------------------------------------------- Peak Elevation 281.64 ft Peak Storage = 1596 cu.ft asaaaaaaaaa====== a==== = == == = =a=aa =aaaaaaaaa = = = = ====== MASS BALANCE ( cu.ft) -------------------------- + Initial Vol = 0 • HYG Vol IN = 2275 - Infiltration = 0 - HYG Vol OUT = 2275 - Retained Vol = 0 Unrouted Vol =- cu.ft (.001% of Inflow Volume) WARNING: Inflow hydrograph truncated on left side. S /N: NOMOL0863131 KLING ENGINEERING Pond Pack Ver: 8 -01 -98 (61) Compute Time: 12:36:07 Date: 12 -09 -1999 APPENDIX 5 GRADING PLAN L \ j ui LOT 1, BLOCK C C IX Z co C \ J u I_ _j t-, 'o C\j ZONED A-P uj op uj CARRIE DOBROVOLNY z w < F, 0 'o ........... ......... ................ ...... .......... .......................... ..................................... ........................ .............................. ................ ............................ ......... ........................... ...... ......... ........ ....... ........... .................................. < r__ ED ''c F 53.22' ?81.37 9ca 2 CROSS SLOPE UNLESS OTHERWISE INDICATED. 82.69 EXIST. FL 280.63 ?81.98 281.88 281.62 231.00 EXISTING WATER EXIST. EXIST. EXIST. . VALVE EXIST. EXIST SCALE: 1"=10' . ... ..... . ... ...... .. ............. ... ....... .. ......... ... .. 2. 00' pl� 13.01 20.00' R1.00'- -81.00' 0 GTE & CABLE TC 281.44 e mEDESTALS 1 . 00' 281,24 FL FL FLUME - FL . u') C6 1 R2 c� EXI rD - 11 � n:. 21.03' 00 c; OD 11 � X/ 00, 2 82. 33 TC 1) F1 282.08 TC 1 )n T(I 03 TC - ')Or) 7 yo 2-ft:-- 150 283. ;,-' - - 1.25' 0 1.25 4 283.53 FL 4� R2.00' t1.79 281.69 FL � t, 3.60' \283.41 TC 282.8 TC Tu / 0.50' EXISTING ELEC. 81.75 TRANSFORMER Ak .49.50' 282.91 FL 282.3 FL 82.:57 - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - 283.56 283.75 EOSW Ln z EXIST. 284 EOSW cl� 00 22,47' 0 0 , 28 4 . 19 TC 284 TC/ 281.5 283-68 283. 69. FL EXIST. 0 u C 234.40/ 28 .40 =J U) 282.18 TC 2 SERVICE AREA 4.03', 20 00' 20.33' 81.68 FL (50.0'x - 59.2) 2-960 SF 3' WIDE CURB BREAK @ 15' O.C. C14 on -- - - - --- - - - - - - - - 00 281 TC 281.83 TC 281.83 TC 281.00 EOP 281,24 FL 280.87 FL C14 ff =284.40 00 c� G! tn LEGEND co o 0 co co o to EXISTING CONTOURS 3' WIDE CURB BREAK @ 15 O.C. Q; 25.08' -281.5 EXISTING CONTOURS • P:14 282 TC TOP OF CURB FL co 2 FLOWNE /81.52 LI in EOSW EDGE OF SIDEWALK 284.41 TC 283. TC 284.40 282.51 TC PVMT PAVEMENT 0 1 283.83 984.40 282.01 284.22 FL < EXIST. ) - -j) EXIST. EXISTING PAVEMENT 13.25' 3' WIDE CURB U-) 283.65 ti °o TC BREAK @ 15' O.C. FL 00 C! r 283.86 15.25'� .67' Er 1\1 R A L iN 0 T Jr- � J_ 284.36 EOSW EXIST. _ EOSW 9 28 TC 284.08 T ch 0 283.86 FL 283.58 F - OFFICE AREA c� Q5 to , , I N - 1. CONTRACTOR IS TO VERIFY THE EXACT HORIZONTAL AND VERTICAL (50. 0' x 25. 1 POSITIONING OF EXISTING UTILITIES AND SERVICE LINES WITHIN 20.00 283.84 EOSW 1255 SF THE PROJECT AREA, WHETHER SHOWN ON PLANS OR NOT AT 283.74 PVMT LEAST 48 HRS. PRIOR TO ANY CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE DONE TO EXISTING FACILITIES. 283.78 EOSW u 281.83 TC 2. ALL ITEMS TO BE REMOVED DURING CLEARING AND GRUBBING c6 7 0 0. 281.12 FL BENCFMARK: SQUARE CUT 283-68 PVMT f _F=284.52 U) REMOVE NOT ONLY THE ABOVE GROUND ELEMENTS, BUT ALL IN LIG IT POLE. UNDERGROUND ELEMENTS AS WELL, ALL EXCAVATED MATERIAL t. ... 7-ill, ELEVATION: 2$5.39 284.1 -'TC� 282.69 TC 281.89 TC 2 SHALL BECOME THE PROPERTY OF THE CONTRACTOR UNLESS • .00' OTHERWISE SPECIFIED BY OWNER. ALL DEBRIS MUST BE. DISPOSED . so W 283.60 FL \- 2 FL 9 81.39 FL OF OFF SITE. 1. 0 284.08 TC 284,1 1 EOSW 283.60 EOSW 2 3. ALL FILL SHALL BE COMPACTED TO 95% MODIFIED (ASTM D 1557) 283.58 FL 281.15 FL 0 B J KLING X co IN AREAS TO BE PAVED, ALL OTHER AREAS SHALL BE 85% MOD. A .......... :..: ...................... 283.95 284-06 TC .57 TC 283.11 TC EXIST. 0 > 283,56 FL ­4, 273.07 FL - FL 4 8 , 4. ALL SITE WORK TO BE DONE IN CONFORMANCE WITH THE CITY 247 - -- I A 12.41' '7) !- 6 2 8 4 . 01 T C 2 1 . 1 8' OF COLLEGE STATION STANDARD SPECIFICATIONS FOR WATER & SEWER, 0 .0 - - - - - - - - P STREETS & DRAINAGE. - PIS 52.67' '282.97 TC tO R3 282.47 FL 281.83 TC 0.61' 5. LIME STABILIZATION TO BE IN THE AMOUNT SUGGESTED BY SOILS U) 283.97 1 3.41 283.50 TC 0.61' If 00. 4070* 281.32 FL 2 1.1 - - - REPORT. REPORT TO BE OBTAINED THROUGH OWNER. ASSUME --- . 28 96 TC 283.00 FL - - - - 5% BY UNIT WEIGHT OF THE SUBGRADE FOR BIDDING PURPOSES. EXIST - - R2.00' 283.91 TC 283. 6 FL 282.87 TC 281.83 T 281.83 TC 6. ALL CONCRETE CURB, CUTTER, WALKS AND DRIVES TO BE 281.33 FL 2"81.20 FL CONSTRUCTED WITH 3000 PSI - 28 DAY STRENGTH, PORTLAND 283.41 FL 282.37 FL CEMENT CONCRETE. 2 84.38 TC 283.88 FL 7. PRIOR TO GRADING OPERATIONS, PAVEMENT CONTRACTOR IS TO STRIP AND/OR EXCAVATE ALL SURFACE SANDS AND TOP SOIL TO co 04 THE EXTENT OF THEIR TOTAL DEPTH AND DISPOSE OFF SITE. CONTRACTOR SHALL PROOF ROLL THE ENTIRE SITE AND REMOVE ANY UNSTABLE, SOFT OR WEAK AREAS ACC'D. TO TX D.O.T. SPECIFICATION 0 282.50 TC ITEM # 216. SELECT FILL IS TO BE USED IN REPLACING OBJECTIONABLE 282.00 FL MATERIAL PLACED WITH DENSITY CONTROL AS SPECIFIED ABOVE. fy - 8. ALL SIDEWALKS TO HAVE 27. Zt U 284.02 283.95 FL 282.00 FL ' (1) C) 9. THE INTENT OF THIS PLAN IS TO DESCRIBE THE GRADING AND DRAINAGE EXIST. IMPROVEMENTS TO BE PERFORMED UNDER THE CONTRACT. UNLESS OTHER- Lu Lu WISE PROVIDED, THE CONTRACTOR SHALL FURNISH ALL MATERIALS, ir 0 .0 DRAINAGE - 0 ?,92 4 T(' SUPPLIES, TOOLS, EQUIPMENT AND LABOR NECESSARY FOR THE SWALE 28,1 96 PROPER PROSECUTION AND COMPLETION OF THE WORK. \ i Cli (9 285 03 TC F ';84.97 TC c'! 10. ALL SANITARY SEWER CLEANOUTS LOCATED IN PAVEMENT ARE TO BE 284.56 I O 284.56 FL yr 800' CONSTRUCTED WITH CAST IRON CAPS AND POSITIONED FLUSH WITH THE FINISHED SURFACE. 28,93' SCALE: 1 GRADE AREA TO DRAIN C\A TO SWALE DRAWN .BY AA APPROVED BY. W DATE: FILE: 041' \0460 1 SHEET LOT 1,' BLOCK B ZONED C-1 MILLS FINANCIAL COMPANY OF I X's ;T63 -172 T 28 20 L 00. 8 :L