Loading...
HomeMy WebLinkAboutStaff ReportSTAFF REPORT Project Manager: Crissy Hartl Report Date: December 16, 2005 Email: chartl(a)-cstx.gov Meeting Date: January 5, 2006 Item: Public hearing, presentation, possible action and discussion on a Replat of Lot 1 Block 1 of the T.J. Addition & Lot 1 Block 1 of C.S.L. of Texas Inc. Subdivisions on 2.001 acres generally located at the corner of Sebesta Rd. and State Highway 6. Applicant: Tony Jones Staff Recommendations: Staff recommends approval of the final plat. Item Summary: This plat is in preparation for an office building on Lot 1 Block 1 of C.S.L. of Texas Inc. by adding 0.024 acres from Lot 1 Block 1 of the T.J. Addition. This plat also includes the relocation of a 10' public utility easement onto the applicant's property. The easement is being relocated from Lot 1 of the T.J. Addition to the adjacent property, Lot 1 of C.S.L of Texas. This relocation has been approved by all appropriate authorities due to the lack of infrastructure in this easement. Comprehensive Plan Considerations: The Comprehensive Land Use Plan indicates this area as Retail Regional. The surrounding areas have requested a Comprehensive Land Use Plan amendment, but the land use will not change for this property. The office building will take access from Sebesta Road, a minor collector. This plat meets the requirements of the Unified Development Ordinance and is in compliance with all subdivision regulations. Item Background: The subject property was annexed in 1971 and subsequently zoned R -1 Single - Family Residential. The property was rezoned to C -1 General Commercial under two separate ordinances in 1980 and 1981 and platted in 1997. Lot 1 Block 1 of C.S.L. of Texas is partially developed with an office building taking access from the State Highway 6. Commission Action Options: The Commission has final authority over the final plat. The options regarding the Replat are: • Approval with conditions; • Approval as submitted; • Denial; Supporting Materials: 1. Location Map 2. Aerial Map 3. Application 4. Infrastructure and Facilities 5. Copy of Replat INFRASTRUCTURE AND FACILITIES Water required for plat: a 12" water main is located across Sebesta Rd. from the subject property. Water Service: a 12" water main is located across Sebesta Rd. from the subject property. Sewer required for plat: the subject property is currently served by an on -site septic or aerobic system as there are no sanitary sewer mains adjacent to this property. The on -site system is permitted by the Brazos County Health Department Sewer Service: the subject property is currently served by an on -site septic or aerobic system as there are no sanitary sewer mains adjacent to this property. The on -site system is permitted by the Brazos County Health Department Street(s) required for plat: N/A Streets /Access: access to this property will be taken off Sebesta Rd. Off -site Easements required for plat: N/A Drainage: the subject property is located with in the Bee Creek Tributary "A" drainage basin. Storm water run -off from this property discharges directly into a concrete channel /drainage easement located on -site. Flood Plain: none on -site Oversize request: See Budgetary and Financial Summary Section. Impact Fees: none Parkland Dedication Fees: none for this commercial site