Loading...
HomeMy WebLinkAboutApplicationCITY OF COI.I:GGii STATION Home of Texas A46M Uniuesiiy' SITE PLAN APPLICATION WIRELESS TELECOMMUNICATIONS FACILITIES MINIMUM SUBMITTAL REQUIREMENTS: $932 Site Plan Application Fee. $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). Fourteen (14) copies of site plan that meet requirements for WTF's as described in Section 6.3. Specific Use Standards of the Unified Development Ordinance and includes requirements for site plan proposals as listed on the attached sheet. �- One (1) folded copy of the landscape plan. -- A4 Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. _E0 (2) copies of the Public infrastructure plans and supporting documents (if applicable). — t .-I.& The following items in accordance with the procedures and requirements for WTF in the UDO Section 6.3 Specific Use Standards: An inventory of the applicant's existing and future towers. The owner must on file with the City a master list of all existing tower structures owned or controlled by the owner. The linear separation distance from other transmission towers, residentially -zoned properties, residential structures, and applicable thoroughfares. A visual impact analysis, presented either as color photo simulations, showing the proposed site of the WTF. Affidavit confirming compliance with FAA regulations, FCC regulations and regulations of any other agency of the Federal Government with the authority to regulate telecommunication facilities. v Grid Plan (propagation map) of the service area for existing and future structures for a period of not less than 2 years. The submission should include a map showing the "search ring" that was required for siting the proposed facility. -Q A letter addressed to the City declaring an intent and willingness to construct a proposed tower that would allow additional service providers to locate on the tower. — '04A- Documentation of need and alternatives. Date of Optional Preapplication or Stormwater Management Conference NAME OF PROJECT HX3572 Dexter ADDRESS 301 George Bush Drive Yy LEGAL DESCRIPTION (Lot, Block, Subdivision) CALLAWAY PHI, BLK 1, LOT 1, ACRES 3.489 & ASSOCIATED BPP TOTAL ACREAGE 3.489 APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project) Name AT &T Mobility/Dave Petrakovitz (agent) Street Address 3603 Sunlight Hills City Spring Phone Number 281- 701 -0604 FOR OFFICE USE ONLY j ' CASE NO.: I ''S — Z3 "1 DATE SUBMITTED: �Q1 TIME: 3 : y rj STAFF: A�l E -mail dave.petrakovitz @gmail.com State Texas Zip Code 77386 Fax Number 10/10 Page 1 of 8 PROPERTY OWNER'S INFORMATION: Name SH P - The Calloway House LP Street Address 301 George Bush Drive Cit College Station Phone Number 979 - 260 -7700 ARCHITECT OR ENGINEER'S INFORMATION: Name Level 5 Consulting Engineers Street Address 19315 FM 2252 Suite 301 Citv Garden Ridge Phone Number (512) 534 -8067 E -mail David. Hildebrandt@leve/5ce.com State Texas Zip Code 78266 Fax Number (210) 354 -7795 OTHER CONTACTS (Please specify type of contact, i.e. project manager, potential buyer, local contact, etc.): Name E -mail Street Address City Phone Number TYPE OF FA Fax Number Zip Code ❑ Transmission Tower height: ft. ❑ Parabolic (dish) antenna diameter: M. ❑ Omni - directional (whip) antenna diameter: in. height: ft. ❑x Directional (panel) antenna length: M. LOCATION OF WTF ❑ Attached to existing transmission tower Fx_1 Attached to building or other structure Calloway House parking garage ❑ Built on ground PRESENT USE OF PROPERTY parking Garage CURRENT ZONING OF PROPERTY R -6 Residential Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? r Yes [x No The applicant has prepared this application and certfes that the facts stated herein and exhibits attached hereto are true, correct, and complet . Signature and title Date State Texas Zip Code 77840 Fax Number 979-260 -7702 E -mail GaMahanay @studenthousing.com State 10/10 Page 2 of 8 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued. 2. The permit may be revoked if any false statements are made herein. 3. If revoked, all work must cease until permit is re- issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued. 5. The permit will expire if no significant work is progressing within 24 months of issuance. 6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP. 7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. 10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable odes and ordinances of the City of College Station shall apply. 11. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12. Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13, I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT PLI ATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE Property Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND ACCURATE. Engineer Date 10/10 Page 3 of 8