SITE PLAN APPLICATION
WIRELESS TELECOMMUNICATIONS FACILITIES
MINIMUM SUBMITTAL REQUIREMENTS:
$932 Site Plan Application Fee.
$600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1 %
of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due
prior to the issuance of any plans or development permit).
Fourteen (14) copies of site plan that meet requirements for WTF's as described in Section 6.3. Specific Use
Standards of the Unified Development Ordinance and includes requirements for site plan proposals as listed on
the attached sheet.
�- One (1) folded copy of the landscape plan. -- A4
Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
_E0 (2) copies of the Public infrastructure plans and supporting documents (if applicable). — t .-I.&
The following items in accordance with the procedures and requirements for WTF in the UDO Section 6.3
Specific Use Standards:
An inventory of the applicant's existing and future towers. The owner must on file with the City a master
list of all existing tower structures owned or controlled by the owner.
The linear separation distance from other transmission towers, residentially -zoned properties, residential
structures, and applicable thoroughfares.
A visual impact analysis, presented either as color photo simulations, showing the proposed site of the WTF.
Affidavit confirming compliance with FAA regulations, FCC regulations and regulations of any other agency of
the Federal Government with the authority to regulate telecommunication facilities.
v Grid Plan (propagation map) of the service area for existing and future structures for a period of not less than
2 years. The submission should include a map showing the "search ring" that was required for siting the
proposed facility.
-Q A letter addressed to the City declaring an intent and willingness to construct a proposed tower that would
allow additional service providers to locate on the tower. — '04A-
Documentation of need and alternatives.
Date of Optional Preapplication or Stormwater Management Conference
NAME OF PROJECT HX3572 Dexter
ADDRESS 301 George Bush Drive Yy
LEGAL DESCRIPTION (Lot, Block, Subdivision) CALLAWAY PHI, BLK 1, LOT 1, ACRES 3.489 & ASSOCIATED BPP
TOTAL ACREAGE 3.489
APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project)
Name AT &T Mobility/Dave Petrakovitz (agent)
Street Address 3603 Sunlight Hills
City Spring
Phone Number 281- 701 -0604
FOR OFFICE USE ONLY
j '
CASE NO.: I ''S — Z3 "1
DATE SUBMITTED: �Q1
TIME: 3 : y rj
STAFF: A�l
E -mail dave.petrakovitz @gmail.com
State Texas
Zip Code 77386
Fax Number
10/10 Page 1 of 8
PROPERTY OWNER'S INFORMATION:
Name SH P - The Calloway House LP
Street Address 301 George Bush Drive
Cit College Station
Phone Number 979 - 260 -7700
ARCHITECT OR ENGINEER'S INFORMATION:
Name Level 5 Consulting Engineers
Street Address 19315 FM 2252 Suite 301
Citv Garden Ridge
Phone Number (512) 534 -8067
E -mail David. Hildebrandt@leve/5ce.com
State Texas Zip Code 78266
Fax Number (210) 354 -7795
OTHER CONTACTS (Please specify type of contact, i.e. project manager, potential buyer, local contact, etc.):
Name E -mail
Street Address
City
Phone Number
TYPE OF FA
Fax Number
Zip Code
❑ Transmission Tower height: ft.
❑ Parabolic (dish) antenna diameter: M.
❑ Omni - directional (whip) antenna diameter: in. height: ft.
❑x Directional (panel) antenna length: M.
LOCATION OF WTF
❑ Attached to existing transmission tower
Fx_1 Attached to building or other structure Calloway House parking garage
❑ Built on ground
PRESENT USE OF PROPERTY
parking Garage
CURRENT ZONING OF PROPERTY R -6 Residential
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? r Yes [x No
The applicant has prepared this application and certfes that the facts stated herein and exhibits attached
hereto are true, correct, and complet .
Signature and title Date
State Texas Zip Code 77840
Fax Number 979-260 -7702
E -mail GaMahanay @studenthousing.com
State
10/10 Page 2 of 8
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re- issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable odes and ordinances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13, I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT PLI ATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE
Property Owner(s) Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require a sedimentation basin.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Engineer Date
10/10 Page 3 of 8