HomeMy WebLinkAboutApplication (13-204)(*O
CITY OF COL,L.cGF: STATION
Home of Texas A&Af University'
FOR OFFIC USE ONLY
CASE NO.:
DATE SUBMITTED:
TIME: 1
STAFF: / I
SITE PLAN APPLICATION
WIRELESS TELECOMMUNICATIONS FACILITIES
MINIMUM SUBMITTAL REQUIREMENTS:
/$932 Site Plan Application Fee.
❑ $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1 %
of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due
prior to the issuance of any plans or development permit).
Fourteen (14) copies of site plan that meet requirements for WTF's as described in Section 6.3. Specific Use
Standards of the Unified Development Ordinance and includes requirements for site plan proposals as listed on
the attached sheet.
One (1) folded copy of the landscape plan. /1
Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. A)M
❑ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). hf /A
The following items in accordance with the procedures and requirements for WTP in the UDO Section 6.3
Specific Use Standards:
FX An inventory of the applicant's existing and future towers. The owner must have on file with the City a master
list of all existing tower structures owned or controlled by the owner.
❑ The linear separation distance from other transmission towers, residentially -zoned properties, residential
structures, and applicable thoroughfares. N ]A
A visual impact analysis, presented either as color photo simulations, showing the proposed site of the WTF.
® Affidavit confirming compliance with FAA regulations, FCC regulations and regulations of any other agency of
the Federal Government with the authority to regulate telecommunication facilities.
�® Grid Plan (propagation map) of the service area for existing and future structures for a period of not less than
2 years. The submission should include a map showing the "search ring" that was required for siting the
proposed facility.
❑ A letter addressed to the City declaring an intent and willingness to construct a proposed tower that would
allow additional service providers to locate on the tower. NIA
N Documentation of need and alternatives.
Date of Optional Preapplication or Stormwater Management Conference 8/7/2013
NAME OF PROJECT AT &T Mobility HX3573 Brentwood
ADDRESS 2504 Texas Avenue South
LEGAL DESCRIPTION (Lot, Block, Subdivision) SOUTHWEST PLACE, BLOCK 1, LOT 2A -1B (PT OF), ACRES 1.14
TOTAL ACREAGE 1.14
APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project) 6 NAI� - —
Name �010V 06rX-N 0VZo E -mail
Street Address 1
city Teffibe J'P
Phone Number 2RI Q26_27-e4
3 6 6 " ? 5 ^I"#•r k nL
State Texas
Zip Code 744 '73
Fax Number
10/10 Page 1 of 8
PROPERTY OWNER'S INFORMATION:
Name CSTX Ho tels LLC
Street Address 2504 Texas Avenue Sout
City Colleg Station
Phone Number Paul Patel 415- 84 -1973
ARCHITECT OR ENGINEER'S INFORMATION:
Name Le vel 5 - David J Hildebrandt - 106713
Street Address 19315 FM 2252, Suite 30
Citv Garden Ridge
State Texas
State Texas
E -mail ManorinnCS @gmail.com
Fax Number
Zip Code 77840
E -mail David.Hildebrandt @level5ce.com
Phone Number 210- 542 -5911
Fax Number
Zip Code 78266
OTHER CONTACTS (Please specify type of contact, i.e. project manager, potential buyer, local contact, etc.):
Name Goodman Net - MaryJo Stickel - Program Manager E -mail MJStickel @GoodmanNetwor
Street Address 6400 Inte Parkway, Suite 1000
City Plano State Texas Zip Code 75093
Phone Number 972- 406 -9692 Fax Number
TY PE OF FACILIT
Z Transmission Tower
❑ Parabolic (dish) antenna
❑ Omni - directional (whip) antenna
❑ Directional (panel) antenna
LOCATION OF WTF
❑ Attached to existing transmission tower
❑ Attached to building or other structure
0 Built on ground
PRESENT USE OF PROPERTY
height: 35 ft.
diameter: M.
diameter: in. height:
length: M.
Manor Inn Hotel
CURRENT ZONING OF PROPERTY Gene Commercial
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? F Yes F No
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached
hereto are true, correct, and complete.
/0-2- -:2.613
Signature and title Date
10/10 Page 2 of 8
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1.
2.
3.
4.
5.
6.
91
10.
11
12
13.
o to - 7, I
Property Owner(s) '` Date
No work of any kind may start until a permit is issued.
The permit may be revoked if any false statements are made herein.
If revoked, all work must cease until permit is re- issued.
Development shall not be used or occupied until a Certificate of Occupancy is issued.
The permit will expire if no significant work is progressing within 24 months of issuance.
Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance_ with all necessary State and Federal Permits prior to construction including NOI and SWPPP.
If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre
pour) and post construction.
Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station. Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
1, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN AND iN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST F MY KNOWLEDGE, TRUE AND
ACCURATE.
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES i.e., projects over 10 acres may
require a sedimentation basin.
3. The information and conclusions contained in the att ached glans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and ederal Regulations,
4. I, THE ENGINEER, AGREE
MENT T
DEVELOP PERMI F
FOR THE APPLICATION, ARE, TO THE BEST MY KNOWLEDGE, TRUE, AND
ACCURATE.
,
r
Engineer Date
Page 3 of 8
10!10
The following CERTIFICATIONS apply to d evelopm ent in Special Flood Hazard Areas.
Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only
Permits:*
A I certify, as demonstrated in the attached drainage study, that the
alterations or development covered by this permit, shall not:
(i) increase the Base Flood elevation;
(ii) create additional areas of Special Flood Hazard Area;
(iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway
and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can
also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or
areas where the depth of from the BFE to natural ground is 18 inches or greater;
(iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond
the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than
one foot per second without acceptable compensation as set forth in the City of College Station Code of
Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor
(v) increase Base Flood velocities.
beyond those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances.
Engineer
Date
initial
* If a platting- status exemption to this requirement is asserted, provide written justification under separate
letter in lieu of certification.
Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits:
B I , certify to the following:
'0 (i) that any nonresidential a mult
structure or contents as a result of flooding from the 100 yearn s as part of this
storm'. is
designed to prevent damage
Date
Engineer
\ Additional certification for Floodway Encroachments:
C I , certify that the construction, improvement, or fill covered by this
permit shall not increase the base flood elevation. 1 will apply for a variance to the Zoning Board of Adjustments.
_
Engineer
Date
Page 4 of 8
10/10
Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate
required).
Residential Structures:
D 1 certify that all new construction or any substantial improvement
of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an
r\ elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre -pour) and post construction.
Engineer / Surveyor
Date
Commercial Structures:
E I , certify that all new construction or any substantial improvement
of any commercial, industrial, or other non - residential structure are designed to have the lowest floor, including all
utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation
\ v\
Engineer / Surveyor Date
OR
1 , certify that the structure with its attendant utility, ductwork,
basement and sanitary facilities is designed to be flood - proofed so that the structure and utilities, ductwork,
basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions.
Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -
pour) and post construction.
Engineer / Surveyor
Date
Conditions or comments as part of approval:
10110
Page 5 of 8