Loading...
HomeMy WebLinkAboutApplication (13-204)(*O CITY OF COL,L.cGF: STATION Home of Texas A&Af University' FOR OFFIC USE ONLY CASE NO.: DATE SUBMITTED: TIME: 1 STAFF: / I SITE PLAN APPLICATION WIRELESS TELECOMMUNICATIONS FACILITIES MINIMUM SUBMITTAL REQUIREMENTS: /$932 Site Plan Application Fee. ❑ $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is 1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance is due prior to the issuance of any plans or development permit). Fourteen (14) copies of site plan that meet requirements for WTF's as described in Section 6.3. Specific Use Standards of the Unified Development Ordinance and includes requirements for site plan proposals as listed on the attached sheet. One (1) folded copy of the landscape plan. /1 Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report. A)M ❑ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). hf /A The following items in accordance with the procedures and requirements for WTP in the UDO Section 6.3 Specific Use Standards: FX An inventory of the applicant's existing and future towers. The owner must have on file with the City a master list of all existing tower structures owned or controlled by the owner. ❑ The linear separation distance from other transmission towers, residentially -zoned properties, residential structures, and applicable thoroughfares. N ]A A visual impact analysis, presented either as color photo simulations, showing the proposed site of the WTF. ® Affidavit confirming compliance with FAA regulations, FCC regulations and regulations of any other agency of the Federal Government with the authority to regulate telecommunication facilities. �® Grid Plan (propagation map) of the service area for existing and future structures for a period of not less than 2 years. The submission should include a map showing the "search ring" that was required for siting the proposed facility. ❑ A letter addressed to the City declaring an intent and willingness to construct a proposed tower that would allow additional service providers to locate on the tower. NIA N Documentation of need and alternatives. Date of Optional Preapplication or Stormwater Management Conference 8/7/2013 NAME OF PROJECT AT &T Mobility HX3573 Brentwood ADDRESS 2504 Texas Avenue South LEGAL DESCRIPTION (Lot, Block, Subdivision) SOUTHWEST PLACE, BLOCK 1, LOT 2A -1B (PT OF), ACRES 1.14 TOTAL ACREAGE 1.14 APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project) 6 NAI� - — Name �010V 06rX-N 0VZo E -mail Street Address 1 city Teffibe J'P Phone Number 2RI Q26_27-e4 3 6 6 " ? 5 ^I"#•r k nL State Texas Zip Code 744 '73 Fax Number 10/10 Page 1 of 8 PROPERTY OWNER'S INFORMATION: Name CSTX Ho tels LLC Street Address 2504 Texas Avenue Sout City Colleg Station Phone Number Paul Patel 415- 84 -1973 ARCHITECT OR ENGINEER'S INFORMATION: Name Le vel 5 - David J Hildebrandt - 106713 Street Address 19315 FM 2252, Suite 30 Citv Garden Ridge State Texas State Texas E -mail ManorinnCS @gmail.com Fax Number Zip Code 77840 E -mail David.Hildebrandt @level5ce.com Phone Number 210- 542 -5911 Fax Number Zip Code 78266 OTHER CONTACTS (Please specify type of contact, i.e. project manager, potential buyer, local contact, etc.): Name Goodman Net - MaryJo Stickel - Program Manager E -mail MJStickel @GoodmanNetwor Street Address 6400 Inte Parkway, Suite 1000 City Plano State Texas Zip Code 75093 Phone Number 972- 406 -9692 Fax Number TY PE OF FACILIT Z Transmission Tower ❑ Parabolic (dish) antenna ❑ Omni - directional (whip) antenna ❑ Directional (panel) antenna LOCATION OF WTF ❑ Attached to existing transmission tower ❑ Attached to building or other structure 0 Built on ground PRESENT USE OF PROPERTY height: 35 ft. diameter: M. diameter: in. height: length: M. Manor Inn Hotel CURRENT ZONING OF PROPERTY Gene Commercial Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? F Yes F No The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, correct, and complete. /0-2- -:2.613 Signature and title Date 10/10 Page 2 of 8 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. 2. 3. 4. 5. 6. 91 10. 11 12 13. o to - 7, I Property Owner(s) '` Date No work of any kind may start until a permit is issued. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re- issued. Development shall not be used or occupied until a Certificate of Occupancy is issued. The permit will expire if no significant work is progressing within 24 months of issuance. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show compliance_ with all necessary State and Federal Permits prior to construction including NOI and SWPPP. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab pre pour) and post construction. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be designed and constructed first in the construction sequence of the project. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station. Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 1, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN AND iN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST F MY KNOWLEDGE, TRUE AND ACCURATE. Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part of the project will be constructed first in the construction sequence. 2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOI and SWPPP. Design will not preclude compliance with TPDES i.e., projects over 10 acres may require a sedimentation basin. 3. The information and conclusions contained in the att ached glans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and ederal Regulations, 4. I, THE ENGINEER, AGREE MENT T DEVELOP PERMI F FOR THE APPLICATION, ARE, TO THE BEST MY KNOWLEDGE, TRUE, AND ACCURATE. , r Engineer Date Page 3 of 8 10!10 The following CERTIFICATIONS apply to d evelopm ent in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only Permits:* A I certify, as demonstrated in the attached drainage study, that the alterations or development covered by this permit, shall not: (i) increase the Base Flood elevation; (ii) create additional areas of Special Flood Hazard Area; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second. This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances, Chapter 13 concerning encroachment into the Special Flood Hazard Area; nor (v) increase Base Flood velocities. beyond those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances. Engineer Date initial * If a platting- status exemption to this requirement is asserted, provide written justification under separate letter in lieu of certification. Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits: B I , certify to the following: '0 (i) that any nonresidential a mult structure or contents as a result of flooding from the 100 yearn s as part of this storm'. is designed to prevent damage Date Engineer \ Additional certification for Floodway Encroachments: C I , certify that the construction, improvement, or fill covered by this permit shall not increase the base flood elevation. 1 will apply for a variance to the Zoning Board of Adjustments. _ Engineer Date Page 4 of 8 10/10 Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Structures: D 1 certify that all new construction or any substantial improvement of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an r\ elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre -pour) and post construction. Engineer / Surveyor Date Commercial Structures: E I , certify that all new construction or any substantial improvement of any commercial, industrial, or other non - residential structure are designed to have the lowest floor, including all utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation \ v\ Engineer / Surveyor Date OR 1 , certify that the structure with its attendant utility, ductwork, basement and sanitary facilities is designed to be flood - proofed so that the structure and utilities, ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre - pour) and post construction. Engineer / Surveyor Date Conditions or comments as part of approval: 10110 Page 5 of 8