Loading...
HomeMy WebLinkAboutCorrespondenceCarol Cotter From: Deven Doyen [ deven @schultzengineeringllc.com] Sent: Monday, November 19, 2012 10:20 AM To: Carol Cotter Cc: 'Joe Schultz' Subject: Caprock Crossing Final Plat Sewer Attachments: REVISED PUBLIC SEWER LINE S1.pdf; Entity Approvals.PDF Carol, Attached is approval from TMPA and BTU for the Caprock Crossing Project and a revised Sewer Line S1 plan sheet for the Final Plat Infrastructure Plans. The contractor has encountered some rock during his installation of the sewer line to Lot 1, Block 1, so we revised the slope between Manhole 1 and Manhole 2 to raise the sewer line up about 2 feet. Everything is still ok to service the Walgreens building and we will submit this officially with the As -built drawing submittal. I just wanted to keep you in the loop. Also, we are still waiting to hear from Jesse on the concrete plant easement. Deven Doyen, P.E. Civil Engineer Schultz Engineering, LLC 2730 Longmire Drive, Suite A College Station, TX 77845 (979) 764 -3900 —Office (979) 764 -3910 — Fax deven @schultzengineeringllc.com Deven Doyen From: Joe Schultz Doeschultz84 @verizon.net] Sent: Monday, October 29, 2012 8:44 AM To: deven @schultzengineeringllc.com Subject: FW: Caprock Crossing Infrastructure Improvements Categories: Red Category From: Stephen Cast [ mailto:wsud.sc0)verizon.net ] Sent: Monday, October 29, 2012 8:40 AM To: Joe Schultz Subject: Re: Caprock Crossing Infrastructure Improvements Joe, Wellborn Special Utility District reviewed and approved the proposed street crossings profile on Sheet C24. Please give me a call if you need additional information. Stephen Cast General Manager Wellborn Special Utility District - - - -- Original Message ----- Fror Joe Schultz To: Stephen Cast Sent: Friday, October 26, 2012 1:54 PM Subject: Caprock Crossing Infrastructure Improvements Stephen, Please confirm that Wellborn SUD is OK with the proposed crossing of your easements with the proposed infrastructure and the replacement of a section of your existing 12" waterline. Thanks Joe Joe Schultz, P.E. Schultz Engineering, LLC 2730 Longmire, Suite A College Station, TX 77845 Office 979.764.3900 Carol Cotter From: Jesse Durden CRT Besse.durden @caprocktx.com] Sent: Saturday, July 14, 2012 9:01 AM To: Carol Cotter Cc: msr @arkitex.com; Joe Schultz; deven @schultzengineeringllc.com Subject: Signage in easement at Caprock Crossing Carol, We'd like to place a permanent Caprock Crossing subdivision sign at this location: Prosperity I understand that if we built it here, the sign would be at -risk if work on the sewer or water line ever needed to be performed. If we were to accept that risk, would you allow us to build the sign over the easements? Thank you, Jesse Durden President CAPROCK I TEXAS 110 Lincoln Avenue, Ste. 103 College Station, TX 77840 Office: (979) 307 -0321 Mobile: (979) 492 -0425 Fax: (979) 314 -7606 1 Z o CD .. I Ln Z w Q I Z oz -zo 2 ✓ z - w I s _ w 3 1 o a as CO oa�w�a w� z a -- w _ so�o N �u_° o ow _N i NIA „Lb pm i n i Er : z � o` C, - T o — C, s c sue_ v c ° N n w s E rn 0 z - - ul 3 - _ o Iz CD s y 3 J - _ s � lo - a ° - s o ZI O w ° c n N x_� Dacca Nn u N cV� s m> 0 3 3 _ 3 f �. z v 0 o z l o y o a ° o f t c c a o - - M Pl- Deven Doyen From: Joe Schultz goeschultz84 @verizon.net] Sent: Monday, November 05, 2012 3:47 PM To: deven @schultzengineeringllc.com Subject: FW: Caprock Crossing From: Tom Chambers f mailto:tchambers @texasmpa.org Sent: Monday, November 05, 2012 3:37 PM To: Joe Schultz Subject: RE: Caprock Crossing Joe, Eric and I both looked at the two drawings you sent. Easements look fine, so you can proceed with your work. Tom From: Joe Schultz [ mailto :joeschultz840verizon.net Sent: Monday, November 05, 2012 2:31 PM To: Tom Chambers Subject: Caprock Crossing Tom, Can I get an email that TMPA is OK with our plans Thanks Joe Joe Schultz, P.E. Schultz Engineering, LLC 2730 Longmire, Suite A College Station, TX 77845 Office 979.764.3900 BT Deven Doyen From: Joe Schultz Uoeschultz84 @verizon.net] Sent: Friday, November 16, 2012 8:25 AM To: deven @schultzengineeringilc.com Subject: FW: Caprock Crossing From: Greg Burkhalter [ mailto :gburkhalterCd)btutilities.com Sent: Friday, November 16, 2012 8:03 AM To: 'Joe Schultz' Subject: RE: Caprock Crossing Yes I did Joe. Everything looks good as is. Sorry it took so long to get back to you. Thanks Greg From: Joe Schultz [ mailto :joeschultz84Ca)verizon.net Sent: Friday, November 16, 2012 7:47 AM To: Greg Burkhalter Subject: Caprock Crossing Greg, Did you get a chance to look at the Caprock Crossing drawings we talked about on Monday? Thanks Joe Joe Schultz, P.E. Schultz Engineering, LLC 2730 Longmire, Suite A College Station, TX 77845 Office 979.764.3900 This e-mail and /or attachment is for the sole use of the intended recipient(s) and may contain confidential and /or legally privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all electronic and paper copies of the original message and any attachments.