HomeMy WebLinkAboutLetter of Completion0111et LL: J,y Jt`3rb4i4t3`!
SIC: Waq(g
PAGE 81
LETTER OF COMPLETION
CITY ENGINEER
CITY OF COLLEGE STATION: DATE: � L 1 013
COLLEGE STATION, TEXAS
RE: COMPLETION OF _�]L+�s�
Dear Sir. r�►o,.1�,�tT� �
�vveTzrr�v l�(oc� � L -or �
The Purpose of our fetter is to "quest that the y lkted improvemerrts be and app An a a dapted as being cOnstructed under City inspection and completed
Station, Texas. This and app�N an � ed and req s req by the City of Cd
may finalize any subcontracla� and to affhm their the City is requested In order that we
and nee by the City of the improvements do" This aPPro++st
Of pcmrantee for the listed improvement on the above refererx ed ��, void the letter
T he ate Year warranty Is hereby affi MOd and agreed to by
nd by their subcontmetors as indicated by signatures below.
I► •
t?MYft6r n�ctor all
Phone Number _929 - �a yc_ g Saz� Phone Number: 979 - L,, --01
Address: . gddrm:
e(
Signature_
ACCE PTANCE & AP y
12
City Representfre
d
0S7 —'
C PLAT FILED
OFFSITE ESMTS FILED
T � I TEMP BLANKET ESMT FILED
NO OTHER ESMTS NEEDED
Carol Cotter
From:
Walter J. Jones
Sent:
Thursday, August 29, 2013 2:25 PM
To:
Carol Cotter
Subject:
Re: Harvey Mitchell Commercial Addition Sewer Line
I emailed the applicable persons, only Donnie and Stephen Maldando Sr (for butch) responded . There were no issues .
Sent from my iPhone
On Aug 29, 2013, at 2:21 PM, "Carol Cotter" < ccotter @cstx.gov wrote:
Hi Jerry,
Can you confirm that the applicable parties on the attached sheet were good with the
infrastructure. (I have to have this form in the file.)
Thanks,
Carol
<Filing of Final Plats - Letter of Completion - new.doc>
SCHULTZ ENGINEERING, LLC.
2730 Longmire Drive, Suite A
College Station, Texas 77845
Firm No. 12327
Harvey Mitchell - Commercial Addition
Sanitary Sewer Improvements
Lot 2, Block I
Engineer's Estimate of Construction
Item
Description
Unit
Estimated
Q uantit y
Unit Price
Total
General Items
1
Mobilization, Overhead and Construction Staking
LS
I
$ 1,500.00
$1,500
2
Silt Fence, complete in place
LF
80
$ 2.50
$200
3
Erosion Control Blanket, complete in place
SY
400
$ 1.80
$720
4
Hydroseed and Hydromulch, complete in place
SY
600
$ 0.50
$300
General Items Subtotal
$2,720
Sanitary Sewer Construction Items
5
8" PVC Sewer Line - D3034 - Non - Structural Backfill, complete in place
LF
103
$ 36.00
$3,708
6
16" Steel Casing 3/8" thick with Spacers and End Seals
LF
40
$ 120.00
$4,800
7
Tie -In to Existing Manhole, complete in place
EA
1
$ 950.00
$950
8
Concrete Manhole - 4' Dia. - complete in place
EA
I
$ 4,000.00
$4,000
8
TV Testing and Inspection, complete in place
LF
103
$ 5.00
$515
Sanitary Sewer Construction Items Subtotal
$13,973
TOTAL ESTIMATED CONSTRUCTION $16,693
�_Z / -/
Page 1 of 1
F -12327
SCHULTZ ENGINEERING, LLC.