HomeMy WebLinkAboutApplication (13-185)CITE' OF COLLEGE STATION
Home ofTexasA Af University'
FOR OFFICE USE ONLY
CASE NO.: I3' I 4 ?�5
DATE SUBMITTED: 1
TIME: D_ 1 L i U
STAFF: P(�5
DESIGN REVIEW BOARD APPLICATION
WOLF PEN CREEK DEVELOPMENT REVIEW
(Check all that apply. Note: All items checked must be presented to the Design Review Board at the
same time): ❑ Site Plan / Building ❑ Building (�, Sign
MINIMUM SUBMITTAL REQUIREMENTS: T�
❑ $350 Design Review Board Application Fee.
❑ Application completed in full. This application form provided by the City of College Station must be used
and may not be adjusted or altered. Please attach pages if additional information is provided.
For Site Plan / Building consideration:
❑ $932 Site Plan Application Fee.
❑ $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is
1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance
is due prior to the issuance of any plans or development permit).
❑ $350 Non - Residential Architectural Standards Building Review Application Fee (if applicable).
❑ Fourteen (14) folded copies of site plan.
❑ One (1) folded copy of the landscape plan.
❑ One (1) copy of the following for building review (if applicable).
❑ Building elevations to scale for all buildings.
❑ A list of building materials for all facade and screening.
❑ Color samples for all buildings or list colors to be used from the approved color palette.
❑ Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
❑ Two (2) copies of the public infrastructure plans and supporting documents (if applicable).
❑ The attached Site Plan and Non - Residential Architectural Standards Building Review checklists (if
applicable) with all items checked off or a brief explanation as to why they are not check off.
For Building consideration:
❑ $250 Non - Residential Architectural Standards Building Review Application Fee (if applicable).
❑ One (1) copy of building elevations to scale for all buildings.
❑ A list of building materials for all facades and screening.
❑ Color samples for all buildings or list colors to be used from the approved color palette.
❑ The attached Non - Residential Architectural Standards Building Review checklist with all items checked off
o?r A brief explanation as to why they are not checked off (if applicable).
P en consideration:
(10) copies of sign details with dimensions.
(10) copies of the building elevation showing sign placement (if attached signage is proposed).
(10) copies of color samples.
❑ Material samples.
NOTE: Proposed development in Wolf Pen Creek must be reviewed by the Design Review Board. When staff has
completed their technical review of the proposal, it will be scheduled for consideration by the Design Review
Board. Ten (10) copies of all current design plans and color samples will be required for the Board.
1/11 Page 1 of 11
I
Proposed use of property
a �O AJ W 0P^ S v fie_
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? r' Yes ( eNo
Square footage of attached sign
Square footage of freestanding sign
For Site Plan consideration, describe how the following proposed elements meet the goals of the special district plan and
related regulations:
Site Lighting:
Norte
Solid Waste:
Relationship of building(s) to site:
Relationship of building(s) and site to adjoining areas:
Building footprint design:
Miscellaneous structures and street hardware:
Landscaping:
Site Maintenance:
1/11 Page 3 of 11
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re- issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab
pre -pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Property Owner(s) Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require sedimentation basin.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Engineer
Date
1/11 Page 5 of 11
Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate
required).
Residential Structures:
D. I, , certify that all new construction or any substantial improvement
of any residential structure shall have the lowest floor, including all utilities, ductwork and any basement, at an
elevation at least one foot above the Base Flood Elevation. Required Elevation Certificates will be provided with
elevations certified during construction (forms at slab pre -pour) and post construction.
Engineer/ Surveyor
Commercial Structures:
E. I,
Date
, certify that all new construction or any substantial improvement
of any commercial, industrial, or other non - residential structure are designed to have the lowest floor, including all
utilities, ductwork and basements, elevated at least one foot above the Base Flood Elevation
Engineer / Surveyor
OR
Date
1, , certify that the structure with its attendant utility, ductwork,
basement and sanitary facilities is designed to be flood - proofed so that the structure and utilities, ductwork,
basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all
areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the
hydrostatic and hydrodynamic conditions.
Required Elevation Certificates will be provided with elevations certified during construction (forms at slab
pre -pour) and post construction.
Engineer / Surveyor
Date
Conditions or comments as part of approval:
1/11 Page 7 of 11
M
Streets, Parking, and Sidewalks
❑ Existing streets and sidewalks (R.O.W.).
❑ Existing Driveways, both opposite and adjacent to the site according to UDO, Article 7.
❑ Proposed drives. Minimum drive aisle width according to UDO, Article 7
❑ Indicate proposed driveway throat length according to UDO, Article 7
❑ Proposed curb cuts.
❑ For each proposed curb cut (including driveways, streets, alleys, etc.) locate existing curb cuts on the same and
opposite side of the street to determine separation distances between existing and proposed curb cuts.
❑ Proposed curb and pavement detail.
❑ A 6" raised curb is required around all edges of all parts of all paved areas without exception. (To include island,
planting areas, access ways, dumpster locations, utility pads, etc.) No exception will be made for areas
designated as "reserved for future parking ".
❑ Proposed medians.
❑ Proposed sidewalks (both public and private).
❑ Proposed pedestrian /bike circulation and facilities for non - residential buildings (UDO, Article 7).
❑ Off - Street parking areas with parking spaces drawn, tabulated, and dimensioned.
❑ Designate number of parking spaces required by ordinance and provided by proposal.
❑ Handicap parking spaces.
❑ Parking Islands drawn and dimensioned with square footage calculated according to UDO, Section 7.2 or 7.9
for non - residential buildings.
❑ Parking setback from R.O.W. to curb of parking lot as required.
❑ Wheelstops may be required when cars overhang onto property not owned by the applicant or where there may be
conflict with pedestrian or bike facilities, handicap accessible routes or above ground utilities, signs or other conflicts.
❑ Security gates, showing swing path and design specs with colors.
❑ Guardrails. Include design and colors.
❑ Traffic Impact Analysis for non - residential development (UDO, Article 7).
❑ Please note if none is required.
❑ Will there be access from a TxDOT R.O.W.? ❑ Yes ❑ No
If yes, then TxDOT permit must be submitted with this application.
Easements and Utilities
❑ Easements - clearly designate as existing or proposed and type (utility, access, etc.)
❑ Utilities (noting size and designate as existing or proposed) within or adjacent to the proposed site, including building
transformer locations, above ground and underground service connections to buildings, and drainage inlets.
❑ Sewer Design Report (if applicable).
❑ Water Design Report and /or Fire Flow Report (if applicable).
❑ Drainage Report with a Technical Design Summary.
❑ Meter locations, existing and proposed (must be located in public R.O.W. or public utility easement).
❑ Provide a water and sanitary sewer legend to include
❑ Minimum water demands
❑ Maximum water demands
❑ Average water demands in gallons per minute, and
❑ Maximum sewer loadings in gallons per day
❑ Will there be access from a TxDOT R.O.W.? ❑ Yes ❑ No
If yes, then TxDOT permit must be submitted with this application.
1/11 Page 9 of 11
(*OF""
CITY OF COLLEGE STATION
Home ofT=A6M Univerriry'
FOR OFFICE USE ONLY
CASE NO.: 13 — I e�S
DATESUBMITTED: OB12-9
TIME: n%H 0
STAFF: LC-1-5
DESIGN REVIEW BOARD APPLICATION
WOLF PEN CREEK DEVELOPMENT REVIEW
(Check all that apply. Note: All items checked must be presented to the Design eview Board at the
same time): ❑ Site Plan / Building ❑ Building Sign
MINIMUM SUBMITTAL REQUIREMENTS:
❑ $350 Design Review Board Application Fee.
❑ Application completed in full. This application form provided by the City of College Station must be used
and may not be adjusted or altered. Please attach pages if additional information is provided.
For Site Plan / Building consideration:
❑ $932 Site Plan Application Fee.
❑ $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is
1 % of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance
is due prior to the issuance of any plans or development permit).
❑ $350 Non -Residential Architectural Standards Building Review Application Fee (if applicable).
❑ Fourteen (14) folded copies of site plan.
❑ One (1) folded copy of the landscape plan.
❑ One (1) copy of the following for building review (if applicable).
❑ Building elevations to scale for all buildings.
❑ A list of building materials for all facade and screening.
❑ Color samples for all buildings or list colors to be used from the approved color palette.
❑ Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
❑ Two (2) copies of the public infrastructure plans and supporting documents (if applicable).
❑ The attached Site Plan and Non -Residential Architectural Standards Building Review checklists (if
applicable) with all items checked off or a brief explanation as to why they are not check off.
For Building consideration:
❑ $250 Non -Residential Architectural Standards Building Review Application Fee (if applicable).
❑ One (1) copy of building elevations to scale for all buildings.
❑ A list of building materials for all facades and screening.
❑ Color samples for all buildings or list colors to be used from the approved color palette.
❑ The attached Non -Residential Architectural Standards Building Review checklist with all items checked off
or brief explanation as to why they are not checked off (if applicable).
For g consideration:
(10) copies of sign details with dimensions.
en (10) copies of the building elevation showing sign placement (if attached signage is proposed).
Ten (10) copies of color samples.
❑ Material samples.
NOTE: Proposed development in Wolf Pen Creek must be reviewed by the Design Review Board. When staff has
completed their technical review of the proposal, it will be scheduled for consideration by the Design Review
Board. Ten (10) copies of all current design plans and color samples will be required for the Board.
1 /11 Page 1 of 11
L � to Z abed
ua
:paglwgns uagnn swei;aw!1 / a;e0
:(unnou)l u!) jagwnN Pafad A;!O
:aweN Pafoad
:(Aiesseoeu p s;aags leuo!;!ppe
ap!Aad) suogeo!ldde;uanbesgns pa;elaj Aue pue uo!;eo!ldde panoidde;sig aq; 6wpieBei uogewJo;u! ap!noid 'seA;
ON '
saA U
La!geo!Idde se eouewpio sno!Aaid japun pannalnal aq uogeo!ldde
eq; 6upsenbei eie noA pue (s)lenadde 6u!geld A4!0 joud peA!aoaJ seq;eq;;oefoid e;o uogenu!;uoo a uogeo!ldde s!q; sl
'noel algeogdde i94;o jo apo0;uawwano0 leoo-I sexal a4;;o 94Z ja;de40 w pap!nad si go!4nn;eig o; pa;!wg s! BuilsGA
'spew uo!;Jasss Aue 6ulpue;s4;!nn4oN -aoueulplo snomeid a o; 6ugsaA Jo; sag!lenb uogeo!ldde a4;;! eu!wia;ap dla4
o; pasn eq ll!nn pue uogeoydde a4; nna!AGU o; spiepue;s a;eudwdde eq; Alguap! ge;s dla4 o; Auesseoeu si uogewlolut s!41
jegwnN xed
apo0 d!Z
alels
jegwnN 9uo4d
A!0
ssaUppV 199i3S
l!ew-3 aweN
o;a ';oe;uoo leool 'jeAnq legua;od 'jabeuew joafad 'a'! 'pe;uoo to edA; A;!oads aseeld) SIOV1N00 2i3H10
lagwnN d
IIxe
apo0 d!Z L a3e3S
7 S Hew-3
S,
O n LS jegwnN xed
opo0 d!Z X ele;s
Cal 11 IF 15:02
a 070 .. _
IMAM
p� CAI _jI -C jegwnN 9uo4d
f A7!O
b ssaUppV;aa„S
^' . aweN
N0IIVM:10dNl S,d3NM0 Ud2dMid
r?� 519L9 f IC jagwnN au04d
1/ )14!O
ssajp ;aai;s
aweN
�W210 NI S JVNVW 1O3f021d/1NV0IlddV
(uo!s!nlpgnS 'AoolB ';ol) NOI1dRJOS30 IVJ3-1
R&M M 4
�O� iO3fOad d0 3WVN
aouejej o0;uaws6euelN ja;ennwjo;s jo uogeo!lddeaid leuogdO;o 9;e0
Proposed use of property e+QA � 2 40A LD LJOZf\- S
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? ❑ Yes WNo
Square footage of attached sign
Square footage of freestanding sign
For Site Plan consideration, describe how the following proposed elements meet the goals of the special district plan and
related regulations:
Site Lighting:
Solid Waste:
Relationship of building(s) to site:
Relationship of building(s) and site to adjoining areas:
Building footprint design:
Miscellaneous structures and street hardware:
Landscaping:
Site Maintenance:
1111 Page 3 of 11
L L;o 4 abed L V L
a}ea ap pue ain}eu6is
�-U-/ wS VON, a; I wo pue �Ioauqw
'aru; aje o;ajaq payoelle sugiyxa pue waiaq palels sloe; aq;;eq; sad!yao pue uogeoildde siy; paiedatd seq;ueoildde aql
:aoueua}weW
c44
mo
svI►SJ-
NQ ZO
5-Jr)o
:su6iS
:suoi}elnBej pe;elai
pue ueld pu}sip lepeds ay};o sleo6 aLg }aaw s}uawale pasodoid 6uUeopo; ay} Moq aquosep 'uoi}ejepisuoo uOiS joA N*—J
:(u6isep 6uippna o} pa}elai se) eoueueluieW
:u6tsep 6wppEl
:seaje 6uiuiofpe o} a}is pue (s)6uippnq;o digsuogejab
:a}is o} (s)6uiplinq;o digsuogelab
:6uivaaJoS a}se/N PROS
:6ugg6i-1 6uippna
:suogejn6aj pa}ejaa
pue ueld }ou}sip Imads aq};o sleo6 ay} }aaw s}uewala pasodoid 6uimopo; ay} rnoq agposep 'uoi}ejapisuoo 6uippne jo.1
CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re -issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab
pre -pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in -the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Property Owner(s) Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. 1 will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require sedimentation basin.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Engineer
Date
1/11 Page 5 of 11
� L;o a a6ed
LL/L
a;e4
Jaaui6u3
s;uaw;snpy;o PJBoq 6uiuoz ay; o; aoueuen a jo; Aldde pion I uoi;enaIa poog aseq ay; aseaaow;ou pegs;iwad
stq; Aq paaanoo py ao ';uawanodwi 'uoi;onj;suoo aq;;eq; /yi}:ao '
a;eo
:s4uaw43ew3u3 Aeenpoold Jo; ua;eaiPPOO Ieuoi;Ippy
Jaaw6u3
-wjo;s jean( -pp; aq; wa; 6uipoog;o;lnsai a se s;ua;uoo s;i jo ajn;onj;s aq; o; a6ewep;uanaid o; pau6isep
si uoi;eopdde sig;;o lied se a;is siq; uo aq o; pasodod jo uo ain;oru;s 1pwe;-i;inw jo ei;uapisajuou Aue;eq; O
:6wnnoIIo; aq; o; /gigao
��
s;iwJad 6uipeJE) / pij pue `sueld uogona;suoO `sWId [Bind `sueld a;iS jo; pannba21
uoi;eoUpao;o nap ui jagal a;ejedas
japun uoi;eoggsn! uagunn apinod 'pauasse si;uawaimbei siq; o; uogdwaxe sn;e;s-6uwgeld e;1 ,
MINI
a;e4
Aaaui6u3
-seouewpjo;o apoo £; ja;dego;o e£' L 6'9 uuooas ui eouewpio {q pa;dwaxe seeje asog; puoA@q
sai;i0019n pooJ3 aseq aseaJoui (n)
you `eGJV pJezeH pooI3 1e139ds ag; o;ui;uawgoeooue 6uiwaouoo £ 6 ja;dego 'seoueuipio
;o apoo uoi;e;s 9691loo;o l;io eq; ui qgo;;as se uoi;esuadwoo ajge;daooe;noq;inn puooas jad;oo; auo
ueq; ssal pue o; lenba si pool.] aseq aq; ui nnop;o f4i0019n aq; alagM ease aoueAanuoo pue /eMpoog aq;
puoAaq si;eq; easy plezeH pooI3 leioads aq;;o lied aq; o; awnlon 96eAo;s Ia;eon pooI3 aseq ay; aonpaj (n)
:ja;eaj6 jo sagoui g; si puno6 lem;eu o; 33a aq; wo;;o q;dap aq; ejagnn seaje
jo AeMpoog (uo;eln6ai aq; jo luepunoq aq;;o;aa; po 6 uiq;inn seeie jaq;ia aq o; pa;ewixodde aq osle
ueo eaje sigl puooas jad;oo; auo ueq;1a;ea.16 si;uana p0013 aseq aq; w nnog;o A4i001an aq; aIagan pue
Aermpoog aq; ui you si;eq; eajy pjezeH pool.] leioads ag;;o ued;eq; o; Apoedeo aoueAanuoo ag; aseaJoap (n)
:easy pJezeH pool.] leioads;o sewe leuoi;ippe a;eajo Q)
:uoi;ena[a pool.] aseq ag; aseWoui O
:;ou pegs';iwad siq; lq paaanoo;uawdo[anap Jo suoge.1a;le
eq;;eq; 'Apn;s a6euiejp pagoege aq; ui pa;ej;suowap se '�41uao
x:s;lwaad
Alup Buue813 pue `s;iwJad 6uipeJE) / INI `sueld uoi;onj;suoO `s;eld IeU1d `sueld a;Is .ro; pajinbam
-seaay pJezeH pool j IepedS ul;uowdolanap o; Aidde SNOUVOIALLN30 6ulne01101 all