HomeMy WebLinkAboutStaff Comments(*0 1""
CITY OF COLLEGE STATION
Planning c Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
August 1, 2005
TO: Stewart Kling, Kling Engineering & Surveying, via fax 846.8252 V
FROM: Bridgette George, Development Coordinator
SUBJECT: CRESCENT POINTE PHA (FP) - Final Plat
Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Monday, August 15, 10:00 a.m., your
project will be placed on the next available Planning and Zoning Commission meeting
scheduled for, September 1, 2005, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas
Avenue.
Two (2) 24 "x36" copies of the revised final plat;
Twelve (12) 11 "x1 T' copies of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart @cstx.gov
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have
not been addressed your project will not be scheduled for a Planning & Zoning Commission
meeting. Your project may be placed on a future agenda once all the revisions have been made
and the appropriate fees paid. If you have any questions or need additional information, please
call Josh Norton or Molly Hitchcock at 979.764.3570.
Attachments: Staff review comments
cc: Emanuel Glockzin, Jr., Crescent Pointe Holdings, via fax 846.0783
Case file #05- 00500130
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: CRESCENT POINTE PHA (FP) - 05- 00500130
ENGINEERING
1. Please remove the word "proposed" from easements.
2. Why are some of these being considered "temporary" easements?
3. Why has the 100' PUE on the preliminary plat, changed to a 100' Temporary Construction
Easement?
4. Off site easements should be removed from the plat and dedicated by separate instrument.
5. Please verify note #1 is correct.
Reviewed by: Josh Norton
Date: August 1, 2005
PLANNING
1. Please separate the certifications of the County Clerk and the P &Z.
2. Please remove the certification of the City Council.
3. Please identify the 25 -ft. landscape easement on the property being platted. This portion of
the easement will be dedicated with the plat.
Reviewed by: Molly Hitchcock
Date: July 28, 2005
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer pours transformer pad(s) per city specs and design.
3. Developer installs pull boxes as per city specs and design.(pull boxes provided by the
city).
4. Developer provides digital AutoCAD 2000 version of plat and /or site plan email to
tmichals @cstx.gov.
5. Developer provides load data for project.
6. Developer provides temporary blanket easement for construction purposes.
7. To discuss any of the above electrical comments, please contact Tony Michalsky at
979.764.3438.
Reviewed by: Tony Michalsky
Date: 8 -1 -05
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 2