MEMORANDUM
September 6, 2002
TO: Lenwood Adams, via fax 693.4243
FROM: Bridgette George, Assistant Development Manager
SUBJECT: POR NADA SUBDIVISION (PP) - Preliminary Plat
Staff reviewed the above - mentioned preliminary plat as requested. The following page
is a list of staff review comments detailing items that need to be addressed. If all
comments have been addressed and the following information submitted by Monday,
September 23, 10:00 a.m. your project will be placed on the next available Planning
and Zoning Commission meeting scheduled for October 3, 2002, 7:00 p.m. in the City
Hall Council Chambers, 1101 Texas Avenue.
Ten (10) copies of the revised preliminary plat; and,
One (1) Mylar original of the revised preliminary plat.
One (1) copy of the digital file of the preliminary plat on diskette or e-mail
to nmanhart@ci.college- station.tx.us
Please note that if all comments have not been addressed on your revised preliminary
plat, your project will be pulled from the scheduled Planning & Zoning Commission
agenda. Your project may be placed on a future agenda once all the revisions have
been made and the appropriate fees paid. Upon receipt of the required documents for
the Planning & Zoning meeting, your project will be considered formally filed with the
City of College Station. If you have any questions or need additional information, please
call me at 764 -3570.
Attachments: Staff review comments
cc: Southcorp Holdings I, L.P., via fax 713.355.4275
Case file #02 -190
Home of Texas A &M University
STAFF REVIEW COMMENTS NO. 1
Project: POR NADA SUBDIVISION (PP) - 02 -190
ENGINEERING
1. Please correct survey information along north boundary lines.
2. Please state utility information on plat. Water to be served...? Sewer to be
served...? Utilities will have to be "provided" for Final Plat.
3. Please see Zoning Ordinance, Table A for correct setbacks.
4. Please label topo for clarity.
5. Please provide utility easements per Subdivision Regulations.
Reviewed by: Spencer Thompson
PLANNING
1. Please continue the city limit line.
2. Please show the zoning district boundary.
Reviewed by: Molly Hitchcock
ELECTRICAL
Date: September 4, 2002
Date: September 5, 2002
1. Developer installs conduit as per city specs and design.
2. Developer provides 30' of #4 rigid conduit for riser pole. Developer installs first 10'.
City installs remainder.
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design (pull boxes provided by
the city).
5. Developer provides digital AutoCAD 2000i version of plat and /or site plan. Email to
rbolinCa)_ci .college - station.tx.us
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction purposes.
8. Developer provides easements for electric infrastructure as installed for electric
lines.
Reviewed by: Ronnie Bolin Date:9 -4 -02
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
2 of 2
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764 -3570 / Fax (979) 764 -3496
MEMORANDUM
October 1, 2002
TO: Lenwood Adams, via fax 693.4243
FROM: Bridgette George, Assistant Development Manager
SUBJECT: POR NADA SUBDIVISION (PP) - Preliminary Plat
Staff reviewed the above - mentioned preliminary plat as requested. The following page
is a list of staff review comments detailing items that need to be addressed. If all
comments have been addressed and the following information submitted by Monday,
October 7, 10:00 a.m., your project will be placed on the next available Planning and
Zoning Commission meeting scheduled for October 17, 2002, 7:00 p.m. in the City Hall
Council Chambers, 1101 Texas Avenue.
Ten (10) copies of the revised preliminary plat;
One (1) Mylar original of the revised preliminary plat, and
One (1) copy of the digital file of the preliminary plat on diskette or e-mail
to nmanhart @ci.college - station.tx.us
Please note that if all comments have not been addressed on your revised preliminary
plat, your project will be pulled from the scheduled Planning & Zoning Commission
agenda. Your project may be placed on a future agenda once all the revisions have
been made and the appropriate fees paid. Upon receipt of the required documents for
the Planning & Zoning meeting, your project will be considered formally filed with the
City of College Station. If you have any questions or need additional information, please
call me at 764 -3570.
Attachments: Staff review comments
cc: Southcorp Holdings I, L.P., via fax 713.355.4275
Case file #02 -190
Home of Texas A &M University
STAFF REVIEW COMMENTS NO. 2
Project: POR NADA SUBDIVISION (PP) - 02 -190
ENGINEERING
1. In order for this property to be platted, the required utilities must be extended to and
across each resulting parcel. There is sufficient acreage that sewerage could be
provided by OSSF. You may state on the Preliminary Plat that sewerage will be
supplied by OSSF or other when available. However, fire protection must be
provided to the property in order to develop the property according to the current
zoning. If water is not extended to the property, then the property is not ready to
develop at this time and a plat is not needed. In order to get a preliminary plat
approval you must show the required utilities in order to meet minimum platting
requirements.
2. In order to receive Final Plat approval you must provide construction documents for
any required utilities. The required utilities must be constructed and accepted or
guaranteed before the Final Plat will be filed.
Reviewed by: Spencer Thompson Date: October 1, 2002
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,
must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City, will constitute a completely new review.
2 of2
(k
CITY OF COLLEGE STATION
Planning er Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
July 26, 2005
TO: Steve Duncan, via fax 731.1500
FROM: Bridgette George, Development Coordinator
SUBJECT: VALLEY PARK CENTER (PP) - Preliminary Plat
Staff reviewed the above - mentioned preliminary plat as requested. The following page is a list
of staff review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Monday, August 1, 10:00 a.m., your
project will be placed on the next available Planning and Zoning Commission meeting
scheduled for August 18, 2005, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas
Avenue.
Two (2) 24" x 36" copies of the revised preliminary plat;
Twelve (12) 11" x 17" copies of the revised preliminary plat;
One (1) Mylar original of the revised preliminary plat; and,
One (1) copy of the digital file of the preliminary plat on diskette or e-mail to
nmanhart @cstx.gov
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have
not been addressed, your project will be pulled from the scheduled Planning & Zoning
Commission agenda. Your project may be placed on a future agenda once all the revisions
have been made and the appropriate fees paid. If you have any questions or need additional
information, please call Trey Fletcher or Alan Gibbs at 979.764.3570.
Attachments: Staff review comments
cc: David Hillman, Southcorp Holdings I, L.P., via fax 713.355.4275
Por Nada Joint Venture, P.O. Box 8131, The Woodlands, Texas, 77387'
Case file #05- 00500129
Home of Texas A &M University
STAFF REVIEW COMMENTS NO. 1
Project: VALLEY PARK CENTER (PP) - 05- 00500129
PLANNING / ENGINEERING
(. Show current city limit lines on plat and vicinity map.
cA. Show box around north arrow and scale to more clearly denote their location.
cA. Show Volume and Page for 20' PUE between Lots 3 and 4.
4O Show Private Access Easements between Lots 1 and 2 and Lots 3 and 4, and connection to
proposed public right -of -way.
Mit 5. Show proposed street name for public right -of -way. 1,,a-47- f- p,4,4.4
V. Provide definitions for PUE, PAE, etc.
�7. TxDOT Comments specifically on the Preliminary Plat: Valley Park Center (Preliminary Plat)
(FM 2818) - Access driveways to FM 2818 must meet TxDOT's current "Regulations for
Access Driveways to State Highways ". Regulations are primarily based on posted speed
limits and distances between proposed & adjacent access points. Where posted speed
limits are 50 MPH or more the required spacing between access points is 425'. Where
driveway spacing is insufficient joint access will be required. Access to Lot 4 may require a
decel lane due to possible conflicts with exit ramp traffic. Preferable access to Lots 3 & 4
would be from Frontage Road stub -out. Appropriate data will be required for any future
permits @ this development site.
r/ 8. FYI: Utility Construction Plans are under review. Upon City initial approval, the City will
forward the associated TxDOT permit applications to the State for their review.
With regard to the oversized participation regu s±,-a.review and subsequent comments on
the construction plans should be incorporated into the engineer's estimate and request.
Preliminarily though, the design guidelines would require a minimum of an 8 -in waterline
due to the length of the line and the number of hydrants. The fire flow analysis may also
justify a 10 -in for a portion of this line as well to accommodate fire flows without exceeding
maximum velocities, etc. FYI, oversized participation is an item that is considered by City
Council and is at their discretion.
/ 10. FYI: Provide Street Construction Plans.
O FYI: Provide Drainage Report.
12' FYI: Provide associated water and sanitary reports. The water report must demonstrate
fire flow and fire hydrants should be spaced and provided accordingly. The water main
construction will require hydrants and the analysis, however it may be advantageous to
consider the site design to minimize the additional water lines and hydrants needed for the
future buildings.
✓13. Provide associated correspondence with TAMU regarding the sanitary agreement and the
ILA.
✓14. Depict all proposed utilities including line sizes, manholes, valves, hydrants, etc.
1j ,15. The proposed street connection to the gore is not in compliance with Table I - Street
Design Criteria found in the Subdivision Regulations; namely a minimum horizontal radius of
400 -ft or a 90- degree intersection. Additionally, the geometry of this connection will require
TxDOT approval especially as it appears a portion of the gore will need to be reconstructed
or extended. If TxDOT intends for the gore to be extended to Lot 3 or further the 90- degree
intersection would be more appropriate. Conversely, if the gore is not to be extended, a
curve would be more appropriate.
v' 16. Similarly, depict the remaining extension of the proposed street as well as a temporary
culdesac with a temporary culdesac easement. (With the proper timing and submittal of the
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review. 2 of 3
Site Plan(s), it may be acceptable to allow the future site plan driveway /access to serve as
an emergency /sanitation exit route or turn - around.)
V17. Please correct the metes and bounds as the boundary calls do not close within acceptable
survey standards.
Reviewed by: Trey Fletcher / Alan Gibbs Date: 7 -26 -05
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer pours transformer pad(s) per city specs and design.
3. Developer installs pull boxes as per city specs and design.(pull boxes
18. provided by the city).
19. Developer provides digital AutoCAD 2000 version of plat and /or site plan.
20. email to sweido aC� cstx.gov
21. Developer provides load data for project.
22. Developer provides temporary blanket easement for construction purposes.
23. Developer to provide 10' easement along entire 2818 frontage.
24. To discuss any of the above electrical comments, please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 7 -21 -05
Fire
1. No notes at this time
Reviewed by: Eric Dotson Date: 7 -20 -05
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review. 3 of 3