Loading...
HomeMy WebLinkAboutMisc.Permit Number Envelope Compliance Certificate Checked By /Date 2003 IECC COMcheck - -EZ So$ware Version 3.0 Release la Data filename: G: \Wallace Halpin \College Station \Documents \College Station.cck Section 1: Project Information Project Name: Designer /Contractor: Document Author: COLLEGE STATION RETAIL COLLEGE STATION, TEXAS LANE DESIGN GROUP 820 GESSNER, SUITE 1770 HOUSTON TEXAS 77024 BURKE LANE Section 2: General Information Building Location (for weather data): Climate Zone: Heating Degree Days (base 65 degrees F): Cooling Degree Days (base 65 degrees F): Project Type: Window / Wall Ratio: College Station, Texas 4b 1788 2776 New Construction 0.19 Building Type Floor Area Retail Sales, Wholesale Showroom 14000 Section 3: Requirements Checklist Bldg. Dept. Use Air Leakage, Component Certification, and Vapor Retarder Requirements [ ] 1. All joints and penetrations are caulked, gasketed, weather - stripped, or otherwise sealed. [ ] 2. Windows, doors, and skylights certified as meeting leakage requirements. [ ] 3. Component R- values & U- factors labeled as certified. [ ] 4. Stair, elevator shall vents, and other dampers integral to the building envelope are equipped with motorized dampers. [ ] 5. Cargo doors and loading dock doors are weather sealed. [ ] 6. Recessed lighting fixtures are: (i) Type IC rated and sealed or gasketed; or (ii) installed inside an appropriate air -tight assembly with a 0.5 inch clearance from combustible materials and with 3 inches clearance from insulation material. +. s Climate- Specific Requirements omnonent Name /Description Roof 1: Metal Roof with Thermal Blocks Exterior Wall 1: Solid Concrete or Masonry <= 8" Furring: None Exterior Wall 2: Metal Frame, 16" o.c. Window 1: Metal Frame:Double Pane Clear, SHGC 0.70, PF 0.44 Door 1: Glass, Clear, SHGC 0.70 Gross Cavity Cont. Proposed Budget Area R -Value R -Value - Factor -Fact r 8050 24.0 0.0 0.059 0.063 5057 - -- 0.0 0.505 0.207 2647 11.0 0.0 0.143 0.207 1394 - -- - -- 1.000 1.230 63 - -- - -- 1.000 1.230 (a) Budget U- factors are used for software baseline calculations ONLY, and are not code requirements. Envelope PASSES: Design 17% better than code Section 4: Compliance Statement The proposed envelope design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed envelope system has been designed to meet the 2003 lECC requirements in COMcheck - EZ Version 3.0 Release la and to comply with the mandatory requirements in the Signature Date