HomeMy WebLinkAboutStaff Comments(*O rq" CITY OF COLLEGE STATION Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 12, 2005 TO: T. Craig Carney, via fax 469.443.0863 FROM: Bridgette George, Development Coordinator SUBJECT: PARK PLACE CROSS ROADS - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: One (1) complete set of construction documents for the proposed development with the revised site and landscaping plans attached If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call Jennifer Reeves or Josh Norton at 979.764.3570. Attachments: Staff review comments cc: Wallace - Halpin, via fax jim @wallacehalpin.com Case file #05- 00500128 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 2 Project: PARK PLACE CROSS ROADS - 05- 00500128 PLANNING 1. Although the heavy duty paving is required to meet fire lane standards to the dumpster location, the fire lane markings will need to be removed from the site plan (Per Eric Dotson of the Fire Marshall's office). The fire can be fought from off of Park Place. (Non - residential Architectural Standards) The following comments were sent back by Chris Haver (City Building Official) on July 27 from the building plans review. 2. As previously stated in staff review comments #1, comment # 12 states: "It appears that the building facing Texas Avenue only has one (1) design element but it is required to have a minimum of two (2) design elements per the UDO, Section 7.9 Non - Residential Architectural Standards, C. Building Mass and Design. In addition, all other facades visible from a right -of- way also need to have two (2) design elements such as required for the front or main building facades ". 3. Section 7.9.0 Building Mass & Design of the U.D.O. States: " The horizontal line of a flat roof (or parapet) along the front or main building(s) facade shall vary by a minimum of two (2) feet up or down so that no more than sixty -six (66 %) percent of the roofline is on the same elevation". The rear elevation that faces Texas Avenue will need to meet this requirement. 4. Section 7.9 2.a. states: " Stucco, EIFS or concrete products shall not cover more than seventy -five (75 %) percent of the overall facade. It appears that what is being proposed as the rear /north exterior elevation is exceeding the 75% of stucco product. Please make adjustments to meet this requirement. 5. We are in receipt of the material samples; however a colored photo of all facades is still needed. Reviewed by: Jennifer Reeves Date: 08 -10 -05 ENGINEERING 1. Would you consider placing your domestic and irrigation meters on the 6" line that is being constructed for the fire hydrant? This may be better for you as to not have to wait on TxDOT to construct the 12" line along Texas Ave. 2. CoCS would prefer that the domestic and irrigation meter be located in the same easement. 3. 1 am not sure of the status of the existing /proposed irrigation meter or which water line it is drawing from (located at the southwest corner of the property). The irrigation meter will also need to be placed in an easement. Use of the existing irrigation meter will also require a tap fee. These issues may be resolved by placing both meters in the same easement, as noted in comment number 1 & 2. 4. Water service line shall be constructed of Type K Copper, please make change. 5. Provided domestic water demands indicate that a .75" meter is needed not a 2" meter. 6. Please provide note on utility and grading plan that junction boxes will be constructed al each grate inlet. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 3 7. Please provide detail of the reconstruction of the inlet located at the parking lot entrance. Specifically the spec for the grate inlet. It would be helpful for you to explain how the new grate inlet is hydraulic equivalent and adequate as compared to the original curb inlet. Also the grate inlet will need to be structurally sounds as to be able to carry the load of solid waste trucks etc (HD 20 load). 8. Please label extension of 6" water line to be constructed of Class PVC Class 200 DR -14, AWWA C909. I have attached the CoCS detail for open cut seal coat, please modify your profile detail accordingly. 9. Please submit easement dedication application for any proposed utility easements. 10. While going thru the easement dedication process, please dedicate an easement for the portion of the 6" sanitary sewer line that exists on this property. Reviewed by: Josh Norton Date: August 12, 2005 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to tha City will constitute a completely new review. 3 of 3 (*t/ CITY OF COLLEGE STATION Planning cr Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM July 22, 2005 TO: T. Craig Carney, via fax 469.443.0863 FROM: Bridgette George, Development Coordinator SUBJECT: Park Place Cross Roads- Site Plan Staff reviewed the above - mentioned site plan and construction documents as submitted. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Easement Dedication Sheet and required documents (please allow 4 weeks to process). One (1) revised set of construction documents with the revised site and landscaping plan attached Please note that the Easement Dedication Sheet and the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call Jennifer Reeves or myself at 979.764.3570. Attachments: Staff review comments cc: Wallace - Halpin, Inc., via e-mail jim @wallacehalpin.com Case file #05- 00500128 STAFF REVIEW COMMENTS NO. 1 Project: PARK PLACE CROSS ROADS — 05- 00500128 PLANNING 1. Provide a general note that all roof and ground- mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right -of -way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 2. (FYI) It appears that the proposed building is on top of the building setback line, please be aware of Section 7.1.d.3.i Architectural features may extend up to 18- inches into a required J building setback. Per site plan check list: Please note whether or not the subject property lies within the 100 - year flood plain per FEMA/FIRM map. 4 identify the nearest fire hydrant on the site plan as existing or proposed. If the nearest hydrant is the one that is being shown on Texas Avenue, this hydrant is not within J 300 feet and is not adequate to serve this site. the site. The current Because of the dumpster placement, a fire lane is required to loop configuration of the end islands does not meet the turning radii. Please adjust accordingly. �. Per Section 7.2.1-1.2. of the UDO: "Where fractional spaces result in computing required parking spaces, the required number of spaces must be increased to the nearest whole number. The total square footage 8,050/250 = 32.2. This needs to be rounded up to 33 required parking spaces. Please adjust the parking legend. 7. With thirty interior parking spaces being proposed, this will require two interior islands. With the extra end island and space between the two end islands located in the center of the parking lot, there is still an interior island that needs to be accounted for. Please be aware that with 18 -foot parking spaces, there is a two -foot over hang on both sides of the interior strip that cannot be included as part of the interior island requirement. 8. Please provide a dumpster pad detail and what type of fence is being proposed to screen the dumpster. 9. Please be aware that all signs are permitted separately. (N.R.A.) NON - RESIDENTIAL ARCHITECTURAL 10. Please provide a table noting materials and percentages. The materials are being shown on the elevation drawing, however, we need to know the percentages of all materials on each elevation. 11. We are in receipt of the colored photo, however, we will need a colored photo of all facades including color samples. 12. It appears that the building facing Texas Avenue only has one (1) design element but it is required to have a minimum of two (2) design elements per the UDO, Section 7.9 Non - Residential Architectural Standards, C. Building Mass and Design. In addition, all other facades visible from a right -of -way also need to have two (2) design elements such as required for the front or main building facades. 13. The elevation shows an aluminum store front system. Is this aluminum framing with a type of glass? If it is please, identify the percentage of glass and type. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the Citv. will constitute a completely new review. � NDSCAPINGISTREETSCAPING /BUFFER 4. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the „L parking lot setback, rights -of -way, and adjacent property disturbed during construction. 15. Please provide additional screening shrubs to the center parking row end islands to adequately screen the parking adjacent to the Park Place right -of -way. Additional screening shrubs will be required for the end island located at the end of the single parking row adjacent to the front of the building to also adequately screen the parking adjacent to the Park Place right -of -way. Reviewed by: Jennifer Reeves Date: 07 -15 -05 ENGINAERING Depicted existing 6in water line running along Texas Ave is no longer in service. Please depict alternative means of water service. L.Z.€xtension of any public infrastructure will require plan and profile detail, as well as an ,omineer's cost estimate. Illustrate location of water and irrigation meter. Meters must be located in a public easement and not in TxDOT ROW. Please provide water demand in gpm. V5- service water line material type. ckflow preventer is required for irrigation meters. Illustrate fire lane. t. epict fire hydrant which is to serve this property. The fire hydrant must be within 300ft of the building and the building must be covered by a 150ft arc measured from the 300ft. The 300ft must be located in designated fire lane or public street. �.9!�Vill the "Verizon" space and "Retail" space be divided by a fire wall? LAe'*What is the building type for this structure? L1.1 this building be sprinkled? If so, the fire hydrant must be located within 150ft of the FDC connection. t 12<Sfinitary sewer service line must be at a minimum 1 % slope. Ll"anitary sewer service lines require a clean -out every 100ft. 14. Upon submitting development mit application lease submit all other required documentation including: dra' ge report, fire report, sanita sewer r etc. further review of the priva u I I ay ut, me er sizing, etc, will a done by our building department at the time building plans are submitted. Reviewed by: Josh Norton Date: July 22, 2005 FIRE 1. Review Planning notes 4 and 5 about fire lane and hydrants. 2. Turning radius does not appear adequate. Reviewed by: Eric Dotson Date:7 -20 -05 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the Citv. will constitute a comoletely new review. ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Existing (1) 4° conduit for previous service will need to be located and extended for new service to building. 3. Developer to provide a tap box on building. 4. Developer provides digital AutoCAD 2000 version of plat and/or site plan email to wdavis @cstx.gov. 5. Developer provides load data for project. 6. To discuss any of the above electrical comments, please contact Weldon Davis at 979.764.5027. Reviewed by: Weldon Davis Date: 7 -19 -05 DRAINAGE 1. Please comply with the following, Storm Water Discharges from Small Construction Activities: The Texas Commission on Environmental Quality has issued a general permit for construction activities under the Texas Pollution Discharge Elimination System. The general permit (TXR150000) is for construction activities disturbing at least 1 but less than 5 acres or is part of a common plan of development disturbing at least 1 but less than 5 acres. You will need to follow these steps to discharge storm water from your construction site to the City of College Station's Municipal Separate Storm Water Sewer System (MS4): 1. Read the general permit (TXR150000) to make sure it applies to your situation. 2. Adhere to the requirements of the general permit ( TXR150000 ). 3. Prepare and implement a Storm Water Pollution Prevention Plan in accordance with Part III of the general permit (TXR150000) 4. Sign and post a construction site notice 5. At least 2 days before beginning construction, provide a copy of the site notice to the operator of any Municipal Separate Storm Water Sewer System (MS4) into which storm water will be discharged. A MS4s include streets, channels, gutters, ditches or anything else that is publicly owned, designed or used to collect or transport storm water. As long as you meet the conditions of this general permit, you are authorized to discharge storm water. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the Citv. will constitute a comoleteiv new review. No notice of intent (NOI), notice of termination (NOT), or fee is required under this option --as long as the requirements of this general permit are followed. This particular general permit will expire at midnight on March 5, 2008. A copy of General Permit TXR150000 can be obtained from TCEQ at: http/www.tceq.state.tx. us/ assets /publicipermittingfwaterquality /attachments /stormwater /t xrl 50000. pdf A copy of the construction site notice can be obtained from TCEQ at: http/www.tceq.state.tx. us/ assets /publictpermittingtwaterquality /attachments /Stormwater /t xrl 52d2.pdf MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled' on your plans. Any additional changes on these plans that have not been pointed out to the Citv. will constitute a comoletely new review. CITY OF COLLEGE STATION Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM July 22, 2005 TO: T. Craig Carney, via fax 469.443.0863 ✓ FROM: Bridgette George, Development Coordinator SUBJECT: Park Place Cross Roads- Site Plan Staff reviewed the above - mentioned site plan and construction documents as submitted. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Easement Dedication Sheet and required documents (please allow 4 weeks to process). One (1) revised set of construction documents with the revised site and landscaping plan attached Please note that the Easement Dedication Sheet and the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call Jennifer Reeves or myself at 979.764.3570. Attachments: Staff review comments cc: Wallace - Halpin, Inc., via e-mail jim @wallacehalpin.com ✓ Case file #05- 00500128 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 1 Project: PARK PLACE CROSS ROADS — 05- 00500128 PLANNING 1. Provide a general note that all roof and ground- mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right -of -way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 2. (FYI) It appears that the proposed building is on top of the building setback line, please be aware of Section 7.1.d.3.i Architectural features may extend up to 18- inches into a required building setback. 3. Per site plan check list: Please note whether or not the subject property lies within the 100 - year flood plain per FEMA/FIRM map. 4. Please identify the nearest fire hydrant on the site plan as existing or proposed. If the nearest hydrant is the one that is being shown on Texas Avenue, this hydrant is not within 300 feet and is not adequate to serve this site. 5. Because of the dumpster placement, a fire lane is required to loop the site. The current configuration of the end islands does not meet the turning radii. Please adjust accordingly. 6. Per Section 7.2.1-1.2. of the UDO: "Where fractional spaces result in computing required parking spaces, the required number of spaces must be increased to the nearest whole number. The total square footage 8,050/250 = 32.2. This needs to be rounded up to 33 required parking spaces. Please adjust the parking legend. 7. With thirty interior parking spaces being proposed, this will require two interior islands. With the extra end island and space between the two end islands located in the center of the parking lot, there is still an interior island that needs to be accounted for. Please be aware that with 18 -foot parking spaces, there is a two -foot over hang on both sides of the interior strip that cannot be included as part of the interior island requirement. 8. Please provide a dumpster pad detail and what type of fence is being proposed to screen the dumpster. 9. Please be aware that all signs are permitted separately. (N.R.A.) NON - RESIDENTIAL ARCHITECTURAL 10. Please provide a table noting materials and percentages. The materials are being shown on the elevation drawing, however, we need to know the percentages of all materials on each elevation. 11. We are in receipt of the colored photo, however, we will need a colored photo of all facades including color samples. 12. It appears that the building facing Texas Avenue only has one (1) design element but it is required to have a minimum of two (2) design elements per the UDO, Section 7.9 Non - Residential Architectural Standards, C. Building Mass and Design. In addition, all other facades visible from a right -of -way also need to have two (2) design elements such as required for the front or main building facades. 13. The elevation shows an aluminum store front system. Is this aluminum framing with a type of glass? If it is please, identify the percentage of glass and type. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 5 LAN DSCAPING /STREETSCAPING /BUFFER 14. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights -of -way, and adjacent property disturbed during construction. 15. Please provide additional screening shrubs to the center parking row end islands to adequately screen the parking adjacent to the Park Place right -of -way. Additional screening shrubs will be required for the end island located at the end of the single parking row adjacent to the front of the building to also adequately screen the parking adjacent to the Park Place right -of -way. Reviewed by: Jennifer Reeves Date: 07 -15 -05 ENGINEERING 1. Depicted existing 6in water line running along Texas Ave is no longer in service. Please depict alternative means of water service. 2. Extension of any public infrastructure will require plan and profile detail, as well as an engineer's cost estimate. 3. Illustrate location of water and irrigation meter. Meters must be located in a public easement and not in TxDOT ROW. 4. Please provide water demand in gpm. 5. Label service water line material type. 6. Backflow preventer is required for irrigation meters. 7. Illustrate fire lane. 8. Depict fire hydrant which is to serve this property. The fire hydrant must be within 300ft of the building and the building must be covered by a 150ft arc measured from the 300ft. The 300ft must be located in designated fire lane or public street. 9. Will the "Verizon" space and "Retail" space be divided by a fire wall? 10. What is the building type for this structure? 11. Will this building be sprinkled? If so, the fire hydrant must be located within 150ft of the FDC connection. 12. Sanitary sewer service line must be at a minimum 1 % slope. 13. Sanitary sewer service lines require a clean -out every 100ft. 14. Upon submitting development permit application, please submit all other required documentation including: drainage report, fire flow report, sanitary sewer report, etc. 15. Further review of the private utility layout, meter sizing, etc, will be done by our building department at the time building plans are submitted. Reviewed by: Josh Norton Date: July 22, 2005 FIRE 1. Review Planning notes 4 and 5 about fire lane and hydrants. 2. Turning radius does not appear adequate. Reviewed by: Eric Dotson Date:7 -20 -05 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 3 of 5 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Existing (1) 4" conduit for previous service will need to be located and extended for new service to building. 3. Developer to provide a tap box on building. 4. Developer provides digital AutoCAD 2000 version of plat and /or site plan email to wdavis @cstx.gov. 5. Developer provides load data for project. 6. To discuss any of the above electrical comments, please contact Weldon Davis at 979.764.5027. Reviewed by: Weldon Davis Date: 7 -19 -05 DRAINAGE 1. Please comply with the following, Storm Water Discharges from Small Construction Activities: The Texas Commission on Environmental Quality has issued a general permit for construction activities under the Texas Pollution Discharge Elimination System. The general permit (TXR150000) is for construction activities disturbing at least 1 but less than 5 acres or is part of a common plan of development disturbing at least 1 but less than 5 acres. You will need to follow these steps to discharge storm water from your construction site to the City of College Station's Municipal Separate Storm Water Sewer System (MS4): 1. Read the general permit ( TXR150000 ) to make sure it applies to your situation. 2. Adhere to the requirements of the general permit ( TXR150000 ). 3. Prepare and implement a Storm Water Pollution Prevention Plan in accordance with Part III of the general permit ( TXR150000 ). 4. Sign and post a construction site notice 5. At least 2 days before beginning construction, provide a copy of the site notice to the operator of any Municipal Separate Storm Water Sewer System (MS4) into which storm water will be discharged. A MS4s include streets, channels, gutters, ditches or anything else that is publicly owned, designed or used to collect or transport storm water. As long as you meet the conditions of this general permit, you are authorized to discharge storm water. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 4 of 5 No notice of intent (NOI), notice of termination (NOT), or fee is required under this option —as long as the requirements of this general permit are followed. This particular general permit will expire at midnight on March 5, 2008. A copy of General Permit TXR150000 can be obtained from TCEQ at: http /www.tceq. state.tx. us /assets /public /permitting /waterqual ity /attachments /stormwater /t xr150000.pdf A copy of the construction site notice can be obtained from TCEQ at: http /www.tceq. state.tx.us /assets /public /permitting /waterqual ity /attachments /stormwater /t xr152d2.pdf MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and 'bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 5 of 5 Page 1 of 1 Jennifer Reeves - Fwd: New Development 7/18/05 From Mandi Alford To: Planners / Engineers Date: 7/21/2005 7 :50 AM Subject: Fwd: New Development 7/18/05 >>> Wally Urrutia 07/20/05 1:33 PM >>> Park Place Cross Roads (05- 500128): Sanitation is ok with this project. Valley Park Center (05- 500129): Sanitation is ok with this project. thanks! Wally Urrutia Sanitation Superintendent (979) 764 -3841 Fax (979) 764 -3822 file:H0\Documents and Settings \jreeves \Local Sett1ngs \Temp \GW)00002.HTM 7/21/2005 _. - - -- - P age 1 Jenn Reeves - Re: Fwd: Calling for G n 1808 Texas Ave S (Retail Shell) g From: Jennifer Reeves To: Kim Wolfe Date: 12/15/2005 2:43:18 PM Subject: Re: Fwd: Calling for C.O. 1808 Texas Ave S (Retail Shell) Called and spoke with Randy w /U.S. Builders today. I gave him the following punch list. The following items will need to be addressed prior to C.O.: v 1. Development Signs must come down. vr2. Remove tractor and rolled up fencing from parking lot. d3. Plant 3- Bald Cypress for the required Streetscape along Park Place. Done r4. Paint dumpster wall. Let me know if you have any questions. Thanks, Reeves Jennifer Reeves Staff Planner City of College Station jreeves @cstx.gov (979) 764 -3570 (979) 764 -3496 FAX F� '4 >>> Kim Wolfe 12/15/05 2:35 PM >>> >>> Kim Wolfe 12/09/05 3:50 PM >>> Are there any issues? BP # 05 -2880 Thanks CC: Benjamin McCarty; Chris Haver wiv aL Fur-s- i l LANDSCAPING ISTREETSCAPING /BUFFE �y4. Provide a general note that 10Q% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights -of -way, and adjacent property disturbed during construction_ �u 15. Please provide additional screening shrubs to the center parking row end islands to adequately screen the parking adjacent to the Park Place right -of -way. Additional screening sh cent he front requi f t e build n o g to also adeq ua adequately screen the parking sin ad adjacent the adjacent to Park Place right -of -way. Reviewed by: Jennifer Reeves Date: 07 -15 -05 ENGINEERING G ,G 1. Depicted existing 6in water line running along Texas Ave is no longer in service. Please depict alternative means of water service. 2. Extension of any public infrastructure will require plan and profile detail, as well as an engineer's cost estimate. 3. Illustrate location of water and irrigation meter. Meters must be located in a public easement and not in TOOT ROW. 4. Please provide water demand in gpm. 5. Label service water line material type. 6. Backflow preventer is required for irrigation meters. 7. Illustrate fire lane. 8. Depict fire hydrant which is to serve this property. The fire hydrant must be within 300ft of the building and the building must be covered by a 150ft arc measured from the 304ft. The 3ooft must be located in designated fire lane or public street. L'Q CT g. Will the "Verizon" space and "Retail' space be divided by a fire wall? Lpi" 10. What is the building type for this structure? 11. Will this building be sprinkled? if so, the fire hydrant must be located within 150ft of the FDC connection. GZ. 12. Sanitary sewer service line must be at a minimum 1% slope. 13. Sanitary sewer service lines require a clean -out every 100ft. 14. Upon submitting development permit application, please submit all other required documentation including: drainage report, fire flow report, sanitary sewer report, etc. 15. Further review of the private utility layout, meter sizing, etc, will be done by our building department at the time building plans are submitted. Reviewed by: Josh Norton Date: July 22, 2005 FIRE G 1. Review Planning notes 4 and 5 about fire lane and hydrants. Gk 2. Turning radius does not appear adequate. Reviewed by: Eric Dotson Date:7 -20-05 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled' on your plans. Any additional changes on these plans that have not been pointed out to tlx: Citv. will constitute a comoleteiv new review No notice of intent (NOI), notice of termination (NOT), or fee is required under this option —as long as the requirements of this general permit are followed. This particular general permit will expire at midnight on March 5, 2008. A copy of General Permit TXR150000 can be obtained from TCEQ at: httpt /assets /public/ permitting/ water /attachmentsistormwater /t xr150000.pdf A copy of the construction site notice can be obtained from TCEQ at: http /www.tceq.state.tx. us/ assets /publiclpermitting/waterquality /attachments /stormwater/t W 52d2.pdf M SCELLANEOUS � Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. 4 � `. f d NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the Citv will constitute a comoleteiv new review