HomeMy WebLinkAboutStaff Comments(*//
CITY OF COLLEGE STATION
Planning & Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
July 15, 2005
TO: Wallace Phillips, Greens Prairie Investors, Ltd., Via fax 690.1041
FROM: Bridgette George, Development Coordinator
SUBJECT: CASTLEGATE SEC 6 (FP)
Staff reviewed the above - mentioned engineering documents as requested. The
following page is a list of staff review comments detailing items that need to be
addressed. Please address the comments and submit the following information for
further staff review and approval of the plans:
One (1) set of revised construction documents.
If you have any questions or need additional information, please call Carol Cotter or
mA. at 764.3570.
Attachments: Staff Review Comments
Cc: Joe Schultz, P.E., Texcon, Via fax 979.764.7759 `/
Ca file no. 05- 00500122
Home of Texas A&M University
CASTLEGATE SEC 6 (FP) (05- 00500122)
Engineering Review
Comments No. 1
1. As discussed, please pull detention pond berm out from Amberley Place ROW.
2. As discussed, please revise detention berm detail.
3. The water line crossing under the high pressure gas line may need additional
protection (encasement). Please provide documentation from Citgo with their
requirements for this crossing. (Sht 5)
4. As proposed, TCEQ requires water line to be a minimum of 2' over sewer line. (W -1
and W -2)
5. `ewer lines buried less than 3.5 feet deep are also required to be backfilled with
cem� -' stabilized sand. (Sht 8)
6. le -is -- change the title of Stormwater Pollution Prevention Plan to Erosion Control
Plan. ( "�ht 1)
7. Is them curbing on the south side of the concrete apron? (Sht 2)
Rev'-� — . Carol Cotter Date: July 13, 2005
NOTE: AAy changes made to the plans, that have not been requested by the City of College Station, must be
c. ned in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
:ve not been pointed out to the City of College Station will constitute a completely new review.
Page 2 of 2
(*O r"
CITY OF COLLEGE STATION
Planning er Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
July 11, 2005
TO: Wallace Phillips, Greens Prairie Investors, Ltd., Via fax 690.1041 /
FROM: Bridgette George, Development Coordinator
SUBJECT: CASTLEGATE SEC. 6 (FP) - Final Plat
Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Monday, July 18, 10:00 a.m., your project
will be placed on the next available Planning and Zoning Commission meeting scheduled for,
Thursday, August 4, 2005, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue.
Two (2) 24 "x36" copies of the revised final plat;
Ten (10) 11 "x1 T' copies of the revised final plat;
Impact Fees in the amount of $8,039.65 ($349.55 x 23 dwelling units);
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart @cstx.gov
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have
not been addressed your project will not be scheduled for a Planning & Zoning Commission
meeting. Your project may be placed on a future agenda once all the revisions have been made
and the appropriate fees paid. If you have any questions or need additional information, please
call Jennifer Reeves or Carol Cotter at 979.764.3570.
Attachments: Staff review comments
cc: Joe Schultz, P.E., Texcon, Via fax 979.764.7759
Case file #05- 00500122
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: CASTLEGATE SEC. 6 (FP) - 05- 00500122
ENGINEERING
1. Development agreement for water and sewer will need to be approved prior to construction.
2. Is there still a blanket PUE on Castlegate Subdivision, and does it cover Section 7? If not,
an off -site PUE will be required for the water at the end of Amberley Place.
3. Verify slope on pond berm detail (Sheet 4).
4. The construction documents and reports are still under review and may affect the plat.
Reviewed by: Jennifer Reeves /Carol Cotter Date: July 11, 2005
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer installs transformer pad(s) and secondary pedestals per city specs and design.
City provides transformer pads and secondary pedestals.
3. Developer provides and installs streetlights per city design.
4. Developer provides easements for electric infrastructure as installed for electric lines
(including street lights).
5. CSU will provide electric design plan for the installation of conduit and streetlighting.
6. Per e-mail dated July 7, 2005 from Ginger Urso additional easements will be added to plat
to cover additional electrical lines.
7. To discuss any of the above electrical comments, please contact Brent Read at
979.764.5026.
Reviewed by: Brent Read Date: July 7, 2005
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.