HomeMy WebLinkAboutStaff Commentsl (*O rq" CITY OF COLLEGE STATION Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 23, 2005 TO: Mike Record, The Arkitex Studio, Via fax 846.8224 FROM: Bridgette George, Development Coordinator SUBJECT: BCS HEART (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: One (1) complete set of construction documents for the proposed development with the revised site and landscaping plans attached If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call Lindsay Boyer or myself at 764 -3570. Attachments: Staff review comments cc: Sharon Russell, via fax 764.9249 Case file #05- 00500116 Home of Texas A &M University A. STAFF REVIEW COMMENTS NO. 2 Project: BCS HEART (SP) - 05- 00500116 PLANNING 1. All meters must be located in an easement or ROW (repeat comment). Water meter is not located appropriately. 2. FYI: Please be aware that the primary electric line and transformer must be located in an easement. The service line to the site is not required to be in an easement. Once these locations have been finalized, please show them on final documents. The transformer must also be adequately screened from the ROW. I was unable to locate any, but please give me a call if these are located on civil drawings or on another sheet other than A1.1 and I missed them. 3. Fire lane striping should extend along all routes of the fire lane. Striping is only shown along end islands, should be located along parking aisles as well. 4. As per Steve Smith with the Fire Marshall's office, the aerial apparatus easement must be 15 to 30 feet parallel from an entire length of the building (repeat comment). 5. Only brick, stone, marble, granite, tinted split face masonry blocks or tile below 30" from the ground surface on all facades visible from the ROW (repeat comment). 6. Provide sample of cement plaster for review (comment from facilitation meeting). 7. Screening should be extended to screen all parking from the ROW. Landscape should be extended in the end islands (repeat comment). Parking is still unscreened along the ROW at the far west side of the parking lot. The spaces facing onto the Medical Center access way should be screened from Birmingham in the end island closest to Birmingham. 8. Application for Temporary Blanket Easement is incomplete. Please submit all required documents. The list of required documents is located at the bottom of the application. Any questions regarding these requirements should be directed to Deborah Grace in the Planning and Development Services Department, 764 -3570 or dgrace @cstx.gov 9. Please provide filed, signed copy of access easement agreement. Reviewed by: Lindsay Boyer Date: August 17, 2005 ENGINEERING 1. Revise waterline on Site Plan to match Civils. 2. Provide 3 additional sets of Construction Plans for stamping. Reviewed by: Alan Gibbs Date: August 22, 2005 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2 CITY OF COLLEGE STATION Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM September 19,2005 TO: Mike Record, via fax 979 - 846 -8224 FROM: Lindsay Boyer, Staff Planner SUBJECT: BCS HEART (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Six (6) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached, and any additional you wish to have returned for your records. Two (2) revised site One (1) landscaping plan One (1) 11 x1 7 grading and erosion control plan If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: BCS Heart, Attn: Sharon Russell, via fax 979 - 764 -9249 Case file #05- 00500116 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 3 Project: BCS HEART (SP) - 05- 00500116 PLANNING Please provide a nothing further certificate from the title company, and a corporate resolution. The nothing further certificate can be faxed to us from the title company and must be for the past 90 days. I was unable to find the corporate resolution in the packet that was sent to us. Reviewed by: Lindsay Boyer Date: September 14, 2005 ENGINEERING 1. No comments. Reviewed by: Carol Cotter Date: September 15, 2005 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2 CITY OF COLLEGE STATION Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM July 12, 2005 TO: Mike Record, The Arkitex Studio, Via fax 846.8224 FROM: Bridgette George, Development Coordinator SUBJECT: BCS HEART (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: $600 Public Infrastructure Inspection Fee One (1) complete set of construction documents for the proposed development with the revised site and landscaping plans attached. Easement Dedication Sheet and required documents (please allow 4 weeks to process). Please note that the Easement Dedication Sheet and the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call Lindsay Boyer or myself at 979.764.3570. Attachments: Staff review comments cc: Sharon Russell, BCS Heart, via fax 764.9249' Case file #05- 00500116 Home of Texas A &M University PLANNING STAFF REVIEW COMMENTS NO. 1 Project: BCS HEART (SP) — 05- 00500116 ^ , �!t - s F � 1. Please pay required $600 Public Infrastructure Inspection fee. Please provide correct address in the title block. Our system shows the address as 3534 Longmire. d1�� �0)� Please provide the correct date of submittal. It currently says June 2005. 4. Please provide the zoning of the property t e north. sLbt'Vt l 5. Please provide the overall building height. w �4 1 n 6. Please provide notation on the site plan if there is no floodplain on this property, referencing the FEMA/FIRM panel. 0" C St-L N� `�`�` 7. Is there existing sidewalk along Longmire? It looks from an aerial view that there is. If so, please show this on the site plan. YES 8. Please provide the dimension of the opposite right driveway. LIXCOVO 9. Please show location of proposed bicycle facilities as required by Section 7.9 of the UDO. 5 10. Please provide interior islands in compliance with Section 7.2 of the UDO. Currently there are 65 interior parking spaces which will required 780 S.F. of interior islands. There appears 7 to be less than 180 S.F. 11. Please note the use of the building on the site plan. 12. Islands separating parking against the ROW should be 18 x 20` 13. Please show meter locations ,on Site Plan. All meters should be located in the ROW or in an easement. O.Od OUf S f (t !itary 14. Please provide water and sewer demands. 15. Please remove the curbing between the handicap accessibility ramps on the east side of the front parking lot. 16. Please show fire lane striping. The fire land should be striped with a 8" red stripe with 4" white lettering to say "FIRE LAID NO PARKING TOW -AWAY ZONE" ,,o; k17. A fire lane for aerial apparatus access must be at least 26' wide and be located between 15' �,� and,' from the building. Please dimension this if the building is over 30' in height. w�6f 18. Please clarify the FDC. Is it at the water line riser, or at the building? The FDC must be within 150' from the fire hydrant. The riser is roughly 150' from the fire hydrant. 19. Please show access easement to the adjacent property. If none exists, it must be provided. 20. Please make a note that signs are permitted separately and remove the sign details from the landscape plan. These will be permitted under a separate application. vale I Nl 21. Building may not be constructed over the sewer line. rl 22. Please show curbing and asphalt detail on the site plan. f� 23. Remove language on the site plan referencing parking ratios for The Med. 24. Please indicate locations of different pavement type on the plan. Dumpster approach should be paved to firelane standard. — V r--e- S h 0 25. Phase line should be drawn to include all improvements to the site, including the detention pond. DK 26. Please provide a table of amount and percentage of building materials for each building elevation. Keep in mind that for buildings over 20,000 SF, 25% of the main fagade must be brick, stone, marble, or granite and the first 30" of any fagade visible from the street must be brick, stone, marble, or granite. 27. Concrete material must be textured or patterned. Smooth face concrete may only be used as an accent up to 10% of the fagade. 7 7 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 4 28. Please provide ALL building elevations. 29. Please provide interior dimension of dumpster enclosure. 0 �n L,#\ 30. Please provide details for the finishing for the dumpster screening. The concrete must be 0 0 painted or finished in some way. 31. Provide a general note that all roof and ground- mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Reviewed by: Lindsay Boyer Date: July 8, 2005 LANDSCAPING /STREETSCAPING /BUFFER 1. Detention pond should be screened along the north side since it is visible from the ROW. 2. Please recalculate landscaping requirement based on the correct phase line. Streetscaping must also be provided for this area. 3. 2" caliper trees are worth 75 pts. Please refer to Section 7.5 of the UDO for appropriate point values of canopy trees. s Screening for the front parking spaces should be extended in the end islands to completely (0 screen the parking from the ROW. 5. Offsite landscaping does not count towards point requirements. All the screening located 1 ' around the detention pond may not be counted toward the site totals unless it is included as part of the phase. 6. Irrigation must be provided to all landscaped area. - P i ? 7. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights -of -way, and adjacent property disturbed during construction. Reviewed by: Lindsay Boyer Date: July 8, 2005 ENGINEERING �101� 1. My information shows the existing waterline along Birmingham to be located approximately 44' within the utility easement and property line and at the bottom of the proposed detention basin. Please revise water line drawings. UCGI'IG'l 2. Please extend the water line along Birmingham and then 90 toward the building along the curb line. This will eliminate the vertical off -set in the line to cross under the flume. 3. A PUE will need to be dedicated over the proposed public main prior to construction. 4. Provide water design report. 5. Provide detail for structural backfill and indicate where required. 6. Rename SWPP Plan to Erosion Control Plan (Sht C1.1). 7. Concrete lined "trickle" channel required the length of the detention pond, from inlet to outlet. 8. Drainage report still under review. Reviewed by: Carol Cotter Date: July 11, 2005 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 3 of 4 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer pours transformer pad(s) per city specs and design. 3. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city). 4. Developer provides temporary blanket easement for construction purposes. To release temporary blanket easement developer provides meets and bounds descriptive easements. 5. To discuss any of the above electrical comments, please contact Brent Read at 979.764.5026. Reviewed by: Brent Read Date: July 7, 2005 MISCELLANEOUS Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 4 of 4 CITY OF COLLEGE STATION Planning er Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM July 12, 2005 TO: Mike Record, The Arkitex Studio, Via fax 846.8224 FROM: Bridgette George, Development Coordinator SUBJECT: BCS HEART (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: $600 Public Infrastructure Inspection Fee One (1) complete set of construction documents for the proposed development with the revised site and landscaping plans attached. Easement Dedication Sheet and required documents (please allow 4 weeks to process). Please note that the Easement Dedication Sheet and the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call Lindsay Boyer or myself at 979.764.3570. Attachments: Staff review comments cc: Sharon Russell, BCS Heart, via fax 764.9249 Case file #05- 00500116 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 1 Project: BCS HEART (SP) — 05- 00500116 PLANNING 1. Please pay required $600 Public Infrastructure Inspection fee. 2. Please provide correct address in the title block. Our system shows the address as 3534 Longmire. 3. Please provide the correct date of submittal. It currently says June 2005. 4. Please provide the zoning of the property to the north. 5. Please provide the overall building height. 6. Please provide notation on the site plan if there is no floodplain on this property, referencing the FEMA/FIRM panel. 7. Is there existing sidewalk along Longmire? It looks from an aerial view that there is. If so, please show this on the site plan. 8. Please provide the dimension of the opposite right driveway. 9. Please show location of proposed bicycle facilities as required by Section 7.9 of the UDO. 10. Please provide interior islands in compliance with Section 7.2 of the UDO. Currently there are 65 interior parking spaces which will required 780 S.F. of interior islands. There appears to be less than 180 S.F. 11. Please note the use of the building on the site plan. 12. Islands separating parking against the ROW should be 18 x 20 13. Please show meter locations on Site Plan. All meters should be located in the ROW or in an easement. 14. Please provide water and sanitary sewer demands. 15. Please remove the curbing between the handicap accessibility ramps on the east side of the front parking lot. 16. Please show fire lane striping. a fire land should be striped with a 8" red stripe with 4" white lettering to say "FIRE LAIONO PARKING TOW -AWAY ZONE" 17. A fire lane for aerial apparatus access must beat least 26' wide and be located between 15' and '30' from the building. Please dimension this if the building is over 30' in height. 18. Please clarify the FDC. Is it at the water line riser, or at the building? The FDC must be within 150' from the fire hydrant. The riser is roughly 150' from the fire hydrant. 19. Please show access easement to the adjacent property. If none exists, it must be provided. 20. Please make a note that signs are permitted separately and remove the sign details from the landscape plan. These will be permitted under a separate application. 21. Building may not be constructed over the sewer line. 22. Please show curbing and asphalt detail on the site plan. 23. Remove language on the site plan referencing parking ratios for The Med. 24. Please indicate locations of different pavement type on the plan. Dumpster approach should be paved to firelane standard. 25. Phase line should be drawn to include all improvements to the site, including the detention pond. 26. Please provide a table of amount and percentage of building materials for each building elevation. Keep in mind that for buildings over 20,000 SF, 25% of the main facade must be brick, stone, marble, or granite and the first 30" of any fagade visible from the street must be brick, stone, marble, or granite. 27. Concrete material must be textured or patterned. Smooth face concrete may only be used as an accent up to 10% of the fagade. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 4 28. Please provide ALL building elevations. 29. Please provide interior dimension of dumpster enclosure. 30. Please provide details for the finishing for the dumpster screening. The concrete must be painted or finished in some way. 31. Provide a general note that all roof and ground- mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right -of -way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Reviewed by: Lindsay Boyer Date: July 8, 2005 LAN DSCAPING /STREETSCAPING /BUFFER 1. Detention pond should be screened along the north side since it is visible from the ROW. 2. Please recalculate landscaping requirement based on the correct phase line. Streetscaping must also be provided for this area. 3. 2" caliper trees are worth 75 pts. Please refer to Section 7.5 of the UDO for appropriate point values of canopy trees. 4. Screening for the front parking spaces should be extended in the end islands to completely screen the parking from the ROW. 5. Offsite landscaping does not count towards point requirements. All the screening located around the detention pond may not be counted toward the site totals unless it is included as part of the phase. 6. Irrigation must be provided to all landscaped area. 7. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights -of -way, and adjacent property disturbed during construction. Reviewed by: Lindsay Boyer Date: July 8, 2005 ENGINEERING 1. My information shows the existing waterline along Birmingham to be located approximately 44' within the utility easement and property line and at the bottom of the proposed detention basin. Please revise water line drawings. 2. Please extend the water line along Birmingham and then 90 toward the building along the curb line. This will eliminate the vertical off -set in the line to cross under the flume. 3. A PUE will need to be dedicated over the proposed public main prior to construction. 4. Provide water design report. 5. Provide detail for structural backfill and indicate where required. 6. Rename SWPP Plan to Erosion Control Plan (Sht C1.1). 7. Concrete lined "trickle" channel required the length of the detention pond, from inlet to outlet. 8. Drainage report still under review. at. E�u vn_� � Reviewed by: Carol Cotter Date: July 11, 2005 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 3 of 4 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer pours transformer pad(s) per city specs and design. 3. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city). 4. Developer provides temporary blanket easement for construction purposes. To release temporary blanket easement developer provides meets and bounds descriptive easements. 5. To discuss any of the above electrical comments, please contact Brent Read at 979.764.5026. Reviewed by: Brent Read Date: July 7, 2005 MISCELLANEOUS Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 4 of 4