Loading...
HomeMy WebLinkAboutStaff Comments(*tl CITY OF COLLEGE STATION Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM June 30, 2005 TO: Brenham National Bank, via fax: 979.836.6107 FROM: Jennifer Prochazka, Project Manager SUBJECT: LIBERTY (FP) - Final Plat Staff reviewed the above - mentioned Replat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, July 18, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, August 4, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24 "x36" copies of the revised final plat; Ten (10) 11 "x17" copies of the revised final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart @cstx.gov Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Carol Cotter or myself at 979.764.3570. Attachments: Staff review comments cc: Texas Hotel Management Corporation, vi fax 979.260.8709 Kerr Surveying, via fax 979.691.8904 Case file #05- 00500112 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: LIBERTY (FP) - 05- 00500112 ENGINEERING 1. The Tax Certificates provided with this submittal are for a different property. Please submit the correct Tax Certificates for this property. 2. Please show the "Original Plat" as it is actually recorded (ie: no utilities, etc.). 3. You will have to extend public sanitary sewer to Lot 2A. Provide engineered construction documents. 4. Development permit with fees (including $200 application fee and $600 infrastructure inspection fee) and supporting docs are required for construction of infrastructure. 5. Replat is misspelled in top right corner. Reviewed by: Jennifer Prochazka & Carol Cotter Date: June 29, 2005 ELECTRICAL 1. Easements as shown on replat cover College Station Utilities, Electric. 2. To discuss any of the above electrical comments, please contact Tony Michalsky at 979.764.3438. Reviewed by: Tony Michalsky Date: 6 -28 -05 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 2 �1X CITY OF COLLEGE STATION Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM July 11, 2005 TO: Brenham National Bank, via fax: 979.836.1408 FROM: Jennifer Prochazka, Project Manager SUBJECT: LIBERTY (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information. Once all documents are complete, this project will be scheduled for the next available Planning and Zoning Commission meeting. Two (2) 24 "x36" copies of the revised final plat; Ten (10) 11 "x1 T' copies of the revised final plat; Construction Documents One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart @cstx.gov If you have any questions or need additional information, please call me or Carol Cotter at 979.764.3570. Attachments: Staff review comments cc: Texas Hotel Management Corporation, via fax 979.260.8709 Kerr Surveying, via fax 979.691.8904 Case file #05- 00500112 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 2 Project: LIBERTY (FP) - 05- 00500112 ENGINEERING 1. You will have to extend the public sanitary sewer to Lots 2A and 2C. This may require additional public utility easements. Submit engineered construction documents for sewer line. 2. Development permit with fees (including $200 application fee and $600 infrastructure inspection fee) and supporting docs are required for construction of infrastructure. Reviewed by: Jennifer Prochazka / Carol Cotter Date: July 7, 2005 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2