HomeMy WebLinkAboutStaff CommentsCITY OF COLLEGE STATION Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM June 17, 2005 TO: ; Janet & Joe Johnson Land Investments, L.P. Via fax 325.625.3672 FROM: Bridgette George, Development Coordinator SUBJECT: WILLIAMS CREEK PH 4 (FP) Staff reviewed the above - mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: Two (2) sets of revised construction documents. If you have any questions or need additional information, please call Carol Cotter at 764.3570. Attachments: Staff Review Comments cc: Joe Schultz, P.E., Texcon, Via fax 979.764.7759 Case file #05- 00500097 Home of Texas ABM University WILLIAMS CREEK PH 4 (FP) (05- 00500097) Engineering Review Comments No. 1 1. What is the size /condition of the culvert at Rock Prairie? Can it handle the flow from the 2 -24" RCP outlet? 2. Please provide HEC -1 runs. 3. Please re -title Sheet 1 as Erosion Control Plan. 4. Vertical curve information is missing from Sta 37 +00.Provide water design report. 5. What is the surface treatment for the detention pond berm? 6. There should be minimum finished floor elevations on each lot based on the sanitary sewer master plan as shown with the previous phases. Reviewed by: Carol Cotter Date: June 16, 2005 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City of College Station will constitute a completely new review. Page 2 of 2 (*t/ CITY OF COLLEGE STATION Planning d' Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM June 14, 2005 TO: Janet & Joe Johnson Land Investments, L.P. Via fax 325.625.3672 FROM: Jennifer Reeves, Project Manager SUBJECT: WILLIAMS CREEK PH 4 (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, June 20, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, July 7, 2005, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24 "x36" copies of the revised final plat; Ten (10) 11 "x1 T' copies of the revised final plat; Parkland Dedication in the amount of $1 ($556 x 25 lots) must be submitted prior to the filing of the final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart @cstx.gov Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Carol Cotter or myself at 979.764.3570. Attachments: Staff review comments cc: Joe Schultz, P.E., Texcon, Via fax 979.764.7759 Case file #05- 00500097 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: WILLIAMS CREEK PH 4 (FP) - 05- 00500097 PLANNING /ENGINEERING 1. Please verify bearing and distance from College Station G.P.S. Monument. 2. Per Randy Trimble (BTU): • The entire front lot easements must be cleared since the front portions of the PUE's are slope easements. The slope easements are unusable for electrical facilities. BTU's electrical facilities will be located in the rear of the front lot easements. • Also, note 8 is not totally correct. The electrical service provider shall be College Station Utilities only for lots along Rock Prairie -- and then only if more that 50% of the lot's area falls within the pre -2002 College Station city limit line. 3. Construction documents and reports still under review. 4. Please be aware that an agreement for water service to lots within the City's CCN will need to be in place to serve those lots with water. Reviewed by: Jennifer Reeves /Carol Cotter Date: 06 -07 -05 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of rigid conduit for riser poles. 3. Developer installs transformer pads (CSU will provide transformer pads). 5. Developer provides digital AutoCAD 2000 or later version of plat and /or site plan to be emailed to gmartinez(a)-cstx.gov 6. All necessary easement are being provided on final plat. 7. CSU will provide electric design plan for the installation of conduit. 8. CSU will provide electric service to Lots 11, 12 & 13 Blk 4 and Lots 1, 2, 3, 4 & 5 Blk 5. All other lots in Phase 4 will be served electric service by BTU. 9. To discuss any of the above electrical comments, please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: 06 -10 -05 FIRE 1. Fire hydrants to be outside of fenced lot area. 4.5" hose connection to be pointed facing road. Reviewed by: Steve Smith Date 06.08.05 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and `bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 2