Loading...
HomeMy WebLinkAboutStaff Comments6/13/2005 1:23 PM GWFA% -> 9796900329 Page 1 of 2 (*O r" CITY OF COLLEGE STATION Ma..mg d Demkpment Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM June 13, 2005 TO: Rabon Metcalf, P.E., via fax 979.690.0329 FROM: Jennifer Prochazka, Project Manager SUBJECT: CALLAWAY SUB PH 2 (PP) - PtWiminery Plot Staff reviewed the above- mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, June 20, 2005, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, July 7 22005 at 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. V Two (2) 24 "x36° copies of the revised final plat; Ten (10) 1 V07" copies of the revised final plat; tJ L One (1) Mylar original of the revised final plat; and N_ One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart@cstx.gov Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Josh Norton or myself at 979.764.3570. Attachments: Staff review comments cc: Page Callaway, via fax 210.820.3361 Case file #05- 00500094 Home of Texas A &M University 6/13/2005 1:23 PM GWFAR -> 9796900329 Page 2 of 2 ENGINEERING STAFF REVIEW COMMENTS NO. 1 Project: CALLAWAY SUB PH 2 (PP) - 05- 00500094 fit' etaining wall may be placed along property line, please remove shading and note. LZ: Remove "To Be Abandoned" notes, the easements need to be formally abandoned through City Council, including those which exist through prescriptive rights. W)k 3. Sewer line will need the same process and require new sewer line to be built prior to being taken off line. lease label topo lines. lease define all things shown on the plat. For instance what does "UT' represent? Also, you have various line weights and 'shapes' throughout the property that need to be defined. Reviewed by: Josh Norton & Jennifer Prochazka ELECTRICAL 1.See final plat comments. Reviewed by: Sam Weido Date: June 10, 2005 Date: 6 -10 -05 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and 'bubbled' on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2 CITY OF COLLEGE STATION Planning 6- Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM June 13, 2005 / TO: Rabon Metcalf, P.E., via fax 979.690.0329 V FROM: Jennifer Prochazka, Project Manager SUBJECT: CALLAWAY SUB PH 2 (PP) - Preliminary Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, June 20, 2005, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, July 7, 2005 at 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) 24 "x36" copies of the revised final plat; Ten (10) 11 "x17" copies of the revised final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to nmanhart @cstx.gov Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Josh Norton or myself at 979.764.3570. Attachments: Staff review comments cc: Page Callaway, via fax 210.820.3361 Case file #05- 00500094 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 1 Project: CALLAWAY SUB PH 2 (PP) - 05- 00500094 ENGINEERING 1. Retaining wall may be placed along property line, please remove shading and note. 2. Remove "To Be Abandoned" notes, the easements need to be formally abandoned through City Council, including those which exist through prescriptive rights. 3. Sewer line will need the same process and require new sewer line to be built prior to being taken off line. 4. Please label topo lines. 5. Please define all things shown on the plat. For instance what does "UT" represent? Also, you have various line weights and 'shapes' throughout the property that need to be defined. Reviewed by: Josh Norton & Jennifer Prochazka Date: June 10, 2005 ELECTRICAL 1. See final plat comments. Reviewed by: Sam Weido Date: 6 -10 -05 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2