HomeMy WebLinkAboutStaff Comments6/13/2005 1:23 PM
GWFA% -> 9796900329 Page 1 of 2
(*O r"
CITY OF COLLEGE STATION
Ma..mg d Demkpment Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
June 13, 2005
TO: Rabon Metcalf, P.E., via fax 979.690.0329
FROM: Jennifer Prochazka, Project Manager
SUBJECT: CALLAWAY SUB PH 2 (PP) - PtWiminery Plot
Staff reviewed the above- mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Monday, June 20, 2005, 10:00 a.m., your
project will be placed on the next available Planning and Zoning Commission meeting scheduled
for, July 7 22005 at 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue.
V Two (2) 24 "x36° copies of the revised final plat;
Ten (10) 1 V07" copies of the revised final plat;
tJ L One (1) Mylar original of the revised final plat; and
N_ One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart@cstx.gov
Upon receipt of the required documents for the Planning & Zoning meeting, your
project will be considered formally filed with the City of College Station. Please note
that if all comments have not been addressed your project will not be scheduled for a
Planning & Zoning Commission meeting. Your project may be placed on a future
agenda once all the revisions have been made and the appropriate fees paid. If you
have any questions or need additional information, please call Josh Norton or myself
at 979.764.3570.
Attachments: Staff review comments
cc: Page Callaway, via fax 210.820.3361
Case file #05- 00500094
Home of Texas A &M University
6/13/2005 1:23 PM GWFAR -> 9796900329 Page 2 of 2
ENGINEERING
STAFF REVIEW COMMENTS NO. 1
Project: CALLAWAY SUB PH 2 (PP) - 05- 00500094
fit' etaining wall may be placed along property line, please remove shading and note.
LZ: Remove "To Be Abandoned" notes, the easements need to be formally abandoned through
City Council, including those which exist through prescriptive rights.
W)k 3. Sewer line will need the same process and require new sewer line to be built prior to being
taken off line.
lease label topo lines.
lease define all things shown on the plat. For instance what does "UT' represent? Also,
you have various line weights and 'shapes' throughout the property that need to be defined.
Reviewed by: Josh Norton & Jennifer Prochazka
ELECTRICAL
1.See final plat comments.
Reviewed by: Sam Weido
Date: June 10, 2005
Date: 6 -10 -05
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next
transmittal letter and 'bubbled' on your plans. Any additional changes on these plans that have not been pointed out to the City,
will constitute a completely new review. 2 of 2
CITY OF COLLEGE STATION
Planning 6- Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
June 13, 2005 /
TO: Rabon Metcalf, P.E., via fax 979.690.0329 V
FROM: Jennifer Prochazka, Project Manager
SUBJECT: CALLAWAY SUB PH 2 (PP) - Preliminary Plat
Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Monday, June 20, 2005, 10:00 a.m., your
project will be placed on the next available Planning and Zoning Commission meeting
scheduled for, July 7, 2005 at 7:00 p.m. in the City Hall Council Chambers, 1101 Texas
Avenue.
Two (2) 24 "x36" copies of the revised final plat;
Ten (10) 11 "x17" copies of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart @cstx.gov
Upon receipt of the required documents for the Planning & Zoning meeting, your project
will be considered formally filed with the City of College Station. Please note that if all
comments have not been addressed your project will not be scheduled for a Planning &
Zoning Commission meeting. Your project may be placed on a future agenda once all
the revisions have been made and the appropriate fees paid. If you have any questions
or need additional information, please call Josh Norton or myself at 979.764.3570.
Attachments: Staff review comments
cc: Page Callaway, via fax 210.820.3361
Case file #05- 00500094
Home of Texas A &M University
STAFF REVIEW COMMENTS NO. 1
Project: CALLAWAY SUB PH 2 (PP) - 05- 00500094
ENGINEERING
1. Retaining wall may be placed along property line, please remove shading and note.
2. Remove "To Be Abandoned" notes, the easements need to be formally abandoned through
City Council, including those which exist through prescriptive rights.
3. Sewer line will need the same process and require new sewer line to be built prior to being
taken off line.
4. Please label topo lines.
5. Please define all things shown on the plat. For instance what does "UT" represent? Also,
you have various line weights and 'shapes' throughout the property that need to be defined.
Reviewed by: Josh Norton & Jennifer Prochazka Date: June 10, 2005
ELECTRICAL
1. See final plat comments.
Reviewed by: Sam Weido Date: 6 -10 -05
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review. 2 of 2