Loading...
HomeMy WebLinkAboutCost EstimatePa -�79 3-x{ '13 R ENGINEER'S ESTIMATE REDMOND SHOPPING CENTER - PUBLIC INFRASTRUCTURE ITEM NO. I QUANTITY UNIT DESCRIPTION UNIT PRICE TOTAL COST Onsite Waterline 1 1 LS Prepare R.O.W. $ 1,000.00 $ 1,000.00 2 1 LS Mobilization $ 800.00 $ 1,200.00 3 1395.1 SF 4" Concrete Sidwalk $ 4.00 $ 5,580.40 4 2 EA Handicap Accessible Ramps $ 900.00 $ 1,800.00 5 92.0 LF 6" PVC Waterline (AWWA C900 CL 200) $ 30.00 $ 2,760.00 6 3 EA 6" M.J. Gate Valve & Box $ 1,000.00 $ 3,000.00 7 2 EA 6'x6" M.J. Tee $ 600.00 $ 1,200.00 8 2 EA 6'x11.25 Degree M.J. Bend $ 350.00 $ 700.00 9 1 EA Connection to existing system $ 2,000.00 $ 2,000.00 10 1 EA Std. Fire Hydrant Assembly $ 3,265.00 $ 3,265.00 11 92.0 LF Structural Backfill $ 8.00 $ 736.00 12 1 LS Bacteria Test $ 1,200.00 $ 1,200.00 13 1 LS I Pressure Test $ 3,500.00 $ 3,500.00 14 2 EA lWater Meter Connection Fittings and Valves $ 650.00 $ 1,300.00 15 92.0 LF I I rench Protection $ 5.00 $ 460.00 Public Infrastructure Total: $ 29,701.40 E OF 1 %, ................. 93631 4 " CENSE R ... 3-�-Zai 103