Loading...
HomeMy WebLinkAboutCorrespondencePage 1 of 1 T rey Fletcher - KM Custom Homes From: "RABON METCALF" <rmengineer @verizon.net> To: "Trey Fletcher" <tfletcher @cstx.gov >, "'Josh Norton "' <Jnorton @cstx.gov> Date: 5/29/2005 2:40:02 PM Subject: KM Custom Homes Hey gentlemen, Here are my responses to your staff comments. I turned in everything but the NRA stuff but apparently something got misplaced. Regardless I will bring six signed sheets to the facilitation meeting Tuesday. PLANNING: 1. Submittal information: a. NRA stuff should have been turned in by Kipp Kissinger; b. Landscaping Plan (sheet C1.3) was submitted. Don't know what happened; c. Sheet 2.1 was a typo /carryover from a previous project; 2. The buffer yard and landscaping is shown on the Landscaping Plan. A note regarding the screening fence has been added to the Site Plan; 3. Got it; LAN DSCAPING /STREETSCAPING /BUFFER: 1. Got it; 2. Got it; ENGINEERING: 1. The firelane existing along the back of the Lack's shopping center. The FD should be able to fight a fire from this location. Portions of the parking lot has firelane stripping, but I disagree with marking it as such since it does not be radius and width requirements at the entrances of the parking lot; 2. You should have received Sheet 1.2 — Grading, Drainage & Erosion Control Plan and the associated Drainage Letter. I will bring them Tuesday. I have also decided to stick with the negligible runoff though process. Let me know if you have any questions. Rabon A. Metcalf, P.E. Rabon Metcalf Engineering P.O. Box 9253 College Station, TX 77842 Cell: (979) 219 -4174 Fax: (979) 690 -0329 i ?I 7 -mac �p file: / /C: \Documents %20and %20Settings \tfletcher \Local %20Settings \Temp \GW}OOOOI.HTM 5/31/2005