Loading...
HomeMy WebLinkAboutStaff CommentsCITY OF COLLEGE STATION Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM May 27, 2005 TO: Mr. Rabon Metcalf, P.E. via fax to 690 -0329 FROM: Trey Fletcher, AICP, Senior Planner SUBJECT: KM CUSTOM HOMES (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) revised site plans One (1) landscaping plan One (1) grading and erosion control plan Easement Dedication Sheet and required documents (please allow 4 weeks to process). Please note that the Easement Dedication Sheet and the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Mr. Craig P. Brown via fax to 846 -7924 Case file #05- 00500088 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 1 Project: KM CUSTOM HOMES (SP) — 05- 00500088 PLANNING Q 3 This submittal is incomplete for lack of the following submittal requirements: • One (1) copy of building elevations • A list of building materials for all facades and screening for non - residential buildings. • Color samples for all non - residential buildings. • Landscaping plans (This was indicated as Sheet C1.3, but was not included). • Sheet C2.1 — Miscellaneous site details was not included. The development of this use adjacent to the Oak Forest Mobile Home Park will require the installation of a 10' bufferyard and a fence. Since a fence exists that would fulfill part of this requirement, a note on the site plan to indicate that the office property owner will replace the fence should it be removed, will suffice. Please note that all roof and ground- mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right -of -way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Reviewed by: Trey Fletcher Date: 5 -27 -2005 LAN DSCAPING /STREETSCAPING /BUFFER See above comments, landscaping plans not submitted therefore unable to complete review. 2. Please note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights -of -way, and adjacent property disturbed during construction. Reviewed by: Trey Fletcher Date: 5 -27 -2005 ENGINEERING 1. Verify if fire lane exists in parking lot. 2. Development Permit application will require a drainage report, grading plan, erosion control plan, etc. Reviewed by: Josh Norton Date: May 24, 2005 ELECTRICAL 1. Developer will install conduit per city specs and design. 2. Developer will intercept existing 4" pvc conduit at northeast corner of property and extend to meter /service location. 3. City will furnish and install service wire. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 3 4. Developer will provide digital AutoCAD 2004 version of plat and /or site plan and email to .gmartinez(a)-cstx.gov 5. Service voltage will be 120/208, 3- phase. 6. To discuss any of the above electrical comments, please contact Gilbert Martinez at 7. 979.764.6255. Reviewed by: Gilbert Martinez Date: 05 -26 -05 MISCELLANEOUS 1. Irrigation system must be protected by a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 3 of 3 (*O r"" CITY OF COLLEGE STATION Planning 6- Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM June 13, 2005 TO: Rabon Metcalf (via fax 690 -0329) FROM: Trey Fletcher, Project Manager SUBJECT: KM CUSTOM HOMES (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: One (1) set of the following materials: • One (1) copy of building elevation for all buildings. • A list of building materials for all facades and screening for non- residential buildings. • Color samples for all non - residential buildings. Two (2) revised site plans One (1) landscaping plan One (1) detention design plan, as well as a drainage report If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: Craig Browne (via fax 846 -7924) Kenny Melesky (via fax 846 -5589) Case file #05 -88 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 2 Project: KM CUSTOM HOMES (SP) - 05- 00500088 PLANNING 1. The Site Plan Application is still deficient of the following: • One (1) copy of building elevation for all buildings. • A list of building materials for all facades and screening for non - residential buildings. • Color samples for all non - residential buildings. 2. Lots 8A — 8E exist as a result of a Replat of Block D of the Ashford Square subdivision in 2001. A Common Area and PUE is hashed on the aforementioned plat and referenced on your site plan submittal; however, a shared parking agreement is required to reduce the number of off - street parking spaces required for this development on -site. 3. As indicated on the site plan, the minimum parking required for this use (office) is 1 per 250 sq. ft. Based on the size of the structure (2006 sq. ft), 8 parking spaces are required. You have provided three spaces, which already exist on site. Each of the required spaces must be provided on -site, or evidence of a shared parking agreement must be provided. Alternatively, you may request a variance to the Zoning Board of Adjustments. This must be resolved prior to site plan approval. 4. A Fire Lane is shown on the adjacent lot (813) as well as Lots 8D and 8E, you indicated upon request that one does not exist. For the purpose of making these existing fire lanes functional, a fire lane must be shown between the building and the parking. 5. A minimum of one (1) 1.25 -inch caliper non - canopy tree per 15 linear feet of landscaping buffer. Thus a minimum of three of these required. 6. KM Custom Homes (05 -88): Sanitation is ok with this project. Reviewed by: TREY FLETCHER Date: 6 -10 -2005 ENGINEERING 1. Please provide a detention design plan, as well as a drainage report. Reviewed by: Josh Norton Date: June 13, 2005 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out tn the ritv will constitute a completely new review. 2 of 2 MEMORANDUM jgy.��� 4 AJ Azt ��4 TO: Planning and Zoning Commission FROM: Spencer Thompson, Deverv, Eng. Email: sthompson @ci.college - station.tx.us SUBJECT: FINAL PLAT for ASHFORD SQUARE BILK D LOT 8 Item: Discussion and possible action on a FINAL PLAT for ASHFORD SQUARE BLK D LOT 8, consisting of 5 lots. (1- 500190) Applicant: ROSTELLE CHAPMAN Staff Recommendations: Staff recommends approval as submitted. Item Summary: This item is a re -plat of the subject property in which the owner is subdividing the tract into 5 individual lots. The property is current) zoned C -1. The re- platted lots meet minimum lot size for C -1 zonin he Applicant a scussed with Staff construction of o_ffi`­ce_ with accessory storage space. ccess to e o s is by way of 2 Private Access Easements. The north -south easement extends to Southwest Parkway and the east -west easement extends to the shopping center to the west and dead -ends into Ashford Drive to east. Access to Ashford drive is blocked by a 6 -ft. privacy fence. Sufficient utilities are in the area for commercial development. An 8 -inch waterline is in place along both Access Easements as is an 8 -inch sewer line. The Developer must comply with the City Drainage .Policy. It may be that there is sufficient storage capacity in the regional detention pond in the Krenek Tap Mobile Home Park to the south. Comprehensive Plan Considerations: Land Use Plan: The LUP depicts this area as Retail Regional. Thoroughfare Plan: The private accesses are private access easements. The easements allow access to Southwest Parkway, which is a Minor Arterial. Parkland Dedication: N/A Open Space Dedication: N/A Special Area Plans: N/A Budgetary & Financial Summary: N/A Attachments: 1. Area map 2. Application 3. Copy of Plat