HomeMy WebLinkAboutCorrespondenceComment: Developer pours transformer pad(s) per city specs and design.
Answer: Acknowledged.
�. Comment: Developer provides easements for electric infrastructure as installed for
electric lines (including street lights). Developer provides easements on
final plat per city design plan.
Answer: Easements per discussions with Tony Michalsky & Sam Weido have been
provided.
Comment: Developer installs street light per city spec and design (on public streets).
Answer: Acknowledged.
Comment: CSU will provide electric design plan for installation of conduit.
Answer: Acknowledged.
Thank you for your cooperation on this project
questions.
S cerely,
Veronica J.B. orgaf, Pfi..
Managing PcWtner U
Please let us know if you have any
Cc: Dan Bensimon
File
\\Mm- server \Projects \Prof \0458 - Autumn- Chase - Villas - NEW \docs \0458 city comments (FP) 050527.doc
M
1 h
MORGAN
City of College Station
Public Works
2613 Texas Ave.
College Station, TX 77842
Attn: Bob Mosley, P.E.
November 2, 2005
RE: Autumn Chase Subdivision Final Plat Filing and Letter of Credit
Dear Bob,
My client, Dan Bensimon, has requested to post a letter of credit, per the subdivision
regulations, for the completion of the infrastructure on the above referenced project. The
letter of credit that he would like to post would be based upon the following:
1. The waterlines are complete, installed and are acceptable with the only exception being
any punch list type items.
2. The sanitary sewer lines are complete, installed and are acceptable with the only
exception being any punch list items.
3. The street curb, sidewalk, drainage inlet throats and street valley gutters are installed
and are acceptable.
4. The base material on the street is installed and is acceptable.
5. The drainage is installed, and is acceptable.
The asphalt will still need to be installed, the detention pond will need to be graded and
seeded, the brick manhole will need to be replaced, the flume and headwall work in the
pond will still need to be completed, the electrical piping will need to be repaired per the
last interim punch list and the street lights will still need to be installed.
511 UNIVERSITY DRIVE EAST, SUITE 204 COLLEGE STATION, TX 77840 • T 979.260.6963 • E 979.260.3564
CIVIL ENGINEERING • HYDRAULICS HYDROLOGY UTILITIES • STREETS • SITE PLANS • SUBDIVISIONS
info @mitchellandmorgan.com www.mitchellandmorgan.com