HomeMy WebLinkAboutCorrespondenceComment: Developer pours transformer pad(s) per city specs and design. Answer: Acknowledged. �. Comment: Developer provides easements for electric infrastructure as installed for electric lines (including street lights). Developer provides easements on final plat per city design plan. Answer: Easements per discussions with Tony Michalsky & Sam Weido have been provided. Comment: Developer installs street light per city spec and design (on public streets). Answer: Acknowledged. Comment: CSU will provide electric design plan for installation of conduit. Answer: Acknowledged. Thank you for your cooperation on this project questions. S cerely, Veronica J.B. orgaf, Pfi.. Managing PcWtner U Please let us know if you have any Cc: Dan Bensimon File \\Mm- server \Projects \Prof \0458 - Autumn- Chase - Villas - NEW \docs \0458 city comments (FP) 050527.doc M 1 h MORGAN City of College Station Public Works 2613 Texas Ave. College Station, TX 77842 Attn: Bob Mosley, P.E. November 2, 2005 RE: Autumn Chase Subdivision Final Plat Filing and Letter of Credit Dear Bob, My client, Dan Bensimon, has requested to post a letter of credit, per the subdivision regulations, for the completion of the infrastructure on the above referenced project. The letter of credit that he would like to post would be based upon the following: 1. The waterlines are complete, installed and are acceptable with the only exception being any punch list type items. 2. The sanitary sewer lines are complete, installed and are acceptable with the only exception being any punch list items. 3. The street curb, sidewalk, drainage inlet throats and street valley gutters are installed and are acceptable. 4. The base material on the street is installed and is acceptable. 5. The drainage is installed, and is acceptable. The asphalt will still need to be installed, the detention pond will need to be graded and seeded, the brick manhole will need to be replaced, the flume and headwall work in the pond will still need to be completed, the electrical piping will need to be repaired per the last interim punch list and the street lights will still need to be installed. 511 UNIVERSITY DRIVE EAST, SUITE 204 COLLEGE STATION, TX 77840 • T 979.260.6963 • E 979.260.3564 CIVIL ENGINEERING • HYDRAULICS HYDROLOGY UTILITIES • STREETS • SITE PLANS • SUBDIVISIONS info @mitchellandmorgan.com www.mitchellandmorgan.com