CITY OF COLLEGE STATION
MEMORANDUM
March 7, 2005
TO: Planning & Zoning Commission
FROM: Joey Dunn, Director of Planning & Development Services
SUBJECT: Callaway Phase II Rezoning
As the Zoning Administrator for the City of College Station, I am initiating a
rezoning request for a portion of Luther Street Right -of -Way from C -1 General
Commercial to R -6 High Density Multi- Family. This request is in conjunction with
the rezoning request for the Callaway property located on the east side of Marion
Pugh Drive.
This area is planned for the development of an apartment project. This portion of
the Luther Street Right -of -Way is required to be abandoned prior to moving
forward with the platting and site planning of this property.
The rezoning of the Luther Street Right -of -Way is not an approval of the Right -of-
Way abandonment.
Home of Texas A &M University
Callaway Development Corporation
Proposed Rezoning Tract
City of College Station, Texas
J. E. Scott Survey, Abstract No. 50
February 4, 2004
FIELD NOTES
13.768 ACRES
All that certain lot, tract or parcel of land being 13.768 acres situated in the J. E. SCOTT SURVEY,
Abstract No. 50, Brazos County, Texas, and being a part of that certain Called 15.1481 acre tract
as described in deeds to Callaway Development Corporation of record in Volume 3750, Page 237,
Volume 3987, Page 36, Volume 3987, Page 64, and Volume 4036, Page 57, OfficialDeed
Records of Brazos County, Texas (O./D.R.B.C.T.): said 13.768 acre tract being more particularly
described by metes and bounds as follows:
BEGINNING at an "X" in Concrete Found for the southwest corner at the southwest comer of said
15.1481 acre tract, same being the intersection of the northeast right -of -way line of Marion Pugh
Drive with the northwest right -of -way line of Luther Street;
THENCE, along said northeast right -of -way line of Marion Pugh Drive, the following courses:
1.) N 18 °42'37" W, a distance of 994.95 feet to a 5/8" Iron Rod Found for
angle point; and,
2.) N 18 °35'42" W, a distance of 770.57 feet to a 1/2" Iron Rod Found for the northwest comer
at the southwest corner of Callaway House Parking Subdivision according to the plat of record in
Volume 5038, Page 284 (O. /D.R.B.C.T.);
THENCE, N 63 °46'43" E, along the southeast line of said Callaway House Parking Subdivision, a
distance of 245.28 feet to a 1/2" Iron Rod found for the northeast corner at the southeast comer of
said Callaway House Parking Subdivision, same being a point in the westerly right -of -way line of
the Union Pacific Railroad right -of -way;
THENCE, along said westerly right - of-way line of the Union Pacific Railroad right -of -way, the
following courses:
1.) S 26 °13'17" E, a distance of 274.12 feet to a 1/2" Iron Rod Found for
an interior ell corner;
2_} N 63 °46'43" E. a distance of 10.00 feet to a 1/2" Iron Rod Found for
an exterior ell comer;
3.) S 26 °13'17" E, a distance of 375.40 feet to a 1/2" Iron Rod Found for
an exterior ell corner;
4.) S 63 °46'43" W, a distance of 10.00 feet to a 1/2" Iron Rod Found for
an interior ell comer; and,
5.) S 26 °13'17" E, a distance of 944.21 feet to a 5/8" Iron Rod Found for the southeast comer
at the southeast corner of the aforesaid 15.1481 acre tract, same being a point in the aforesaid
northwest right- of-way line of Luther Street;
THENCE, S 45 °38'34" W, along said northwest right- of-way line of Luther Street, a distance of
502.56 feet to the POINT OF BEGINNING AND CONTAINING AN AREA OF 13.768 ACRES OF
LAND, MORE OR LESS, according to a survey performed on the ground on September 23, 2003,
under the supervision of H. Curtis Strong, Texas Registered Professional Land Surveyor No. 4961.
o
,, �1 ' .,T ' ' '
u � 4 ' r = :
U
STAFF REPORT
Project Manager: Jennifer Prochazka, Planner Report Date: June 17, 2005
Email: jprochazka @cstx.gov Meeting Date: June 22, 2005
Item: Public hearing, presentation, discussion, and possible action on a
rezoning for Callaway Subdivision Phase II, consisting of approximately 14
acres, located on the east side of Marion Pugh Drive, approximately 500' south
of the intersection of George Bush Drive, including a portion of the Luther Street
Right -of -Way, from C -1 General Commercial to R -6 High Density Multi - Family.
Applicant: Rabon Metcalf Engineering, agent for Callaway Development
Corporation, and the City of College Station, owner of the Luther Street Right -of-
Way.
Staff Recommendations: Staff recommends approval of the rezoning with the
condition that the Developer, extend Marion Pugh Drive from Luther Street to
Holleman Street at the time the property is developed.
Item Summary: The purpose of this request is to develop the property as a
multi - family housing complex. This item came before the Commission in March
2004 and received a unanimous recommendation for approval by the
Commission. At that time, the property owner was not ready to move forward to
the City Council for final approval of the R -6 zoning. The Planning & Zoning
commission again heard this case on April 7, 2005 and again recommended
approval unanimously. The City Council denied the rezoning request on April
14, 2005 because of traffic and accessibility concerns. On May 5, 2005 the
Planning & Zoning Commission waived the required 180 day waiting period
required by the Unified Development Ordinance for re- application of rezonings
because of available new information.
The new information submitted by the applicant is a letter for a proposed
development participation agreement with the City for the construction of the
portion of Marion Pugh Drive between approximately Luther Street and Holleman
Drive. The applicant has also submitted a Traffic Impact Analysis to assess the
traffic issues associated with the development of the subject tract. This analysis
assumes the extension of Marion Pugh Drive to Holleman Drive is constructed,
as the developer has indicated in his letter. Even though existing traffic volumes
in this area are high, the primary finding of the TIA is that the traffic that this
development generates will be accommodated by the transportation system with
the Marion Pugh Drive extension. This is primarily due to the significant number
of trips that will take place using modes other than the automobile, since the
project is in close proximity to TAMU. In addition, it is expected that the traffic
peak for the proposed apartment complex will be different than the overall
transportation network's morning and afternoon peaks that are associated with
commutes to work. In the long term (2010 and beyond), traffic conditions should
significantly improve with the construction of the Wellborn Road / George Bush
Drive grade separation and the eventual extension of Jones - Butler Drive to
George Bush Drive. The staff Traffic Engineer has reviewed the subject TIA and
is in general agreement with the assumptions and conclusions of the report. The
Executive Summary of the TIA is included as an attachment to this staff report
for your information.
The property to the west, across Marion Pugh Drive, is zoned R -6 and is
developed as apartments. The property to the south, across the Luther right -of-
way, is zoned R -4 and M -1 and is not developed. The property to the east,
across the railroad right -of -way and Wellborn Road, is zoned R -1 and A -P and
developed as single - family homes and offices. The northern property is
developed as a parking lot for the Callaway House Dormitory and is zoned C -1.
The rezoning of the Luther Street Right -of -Way is not an approval of the right -of-
way abandonment. The right -of -way abandonment will be submitted to the City
Council for consideration through an abandonment ordinance.
Comprehensive Plan Considerations: The Land Use Plan designates this
property as Residential Attached, therefore the rezoning request is in compliance
with the Land Use Plan. The location of the rezoning request is also supported
by the City's development policies which attempt to locate multi - family in close
proximity to Texas A &M University.
Marion Pugh Drive is designated as a major collector on the Thoroughfare Plan,
Wellborn Road is designated as a major arterial, and Luther is a residential
street in this area.
Item Background: The property was annexed in to the City and zoned Industrial
in 1958. When the zoning was changed to M -2, the district also included C -1
uses. In 1984 an amendment was made to the Zoning Ordinance that prohibited
C -1 uses in M -2 zones, however, this particular property was specifically
exempted from the exclusion of C -1 uses in an M -2 zone, and allowed the
General Commercial uses. With the adoption of the Unified Development
Ordinance, City Staff worked with the property owners by giving them the choice
of retaining the M -2 classification without the commercial uses or being rezoned
to C -1 to include the commercial uses. The property is zoned C -1.
Luther Street was closed in this area in the 1990s.
Information on Multi- family Housing in College Station: The Comprehensive
Plan proposes 1,043 acres of Residential Attached in specific locations.
There are currently 1,357 acres zoned multi - family, R -4 or R -6.
950 total acres developed as multi - family
841 acres developed as apartments & condominiums and
109 acres developed as group housing (off campus dorms)
203 acres zoned multi - family, but undeveloped. However, these are
not necessarily in areas where we desire multi - family growth.
Approximately 204 acres zoned multi - family, but developed as other
uses.
Approximately 26 acres (in various locations) currently zoned for multi-
family, but undeveloped, within one mile of Texas A &M University
campus.
Current occupancy rates for multi - family units (2004):
90.6% B /CS area
A certain level of vacancy is generally needed for ease of movement, housing
choice, and affordability.
Commission Action Options: The Commission acts as a recommending body
on the question of rezoning, which will be ultimately decided by City Council.
The Commission's options are:
1. Recommend approval;
2. Recommend denial;
3. Table indefinitely; or,
4. Defer action to a specified date.
Supporting Materials:
1. Location Map
2. Aerial
3. Application & Staff Memo
4. Infrastructure and Facilities
5. Letter in opposition to request
6. Letter from applicant's representative for proposed Development Agreement
7. Traffic Impact Analysis Executive Summary
INFRASTRUCTURE AND FACILITIES
Water Service: Service can be taken from the 18" main along Marin
Pugh.
Sewer Service: Service can be taken from the main along the railroad
ROW.
Streets /Access: The property fronts on and has access to Marion Pugh.
Any access to this property must meet the Driveway Ordinance.
Drainage: A Development Permit is required for development of the site.
It appears the site drains to the southeast, along the railroad ROW.
Flood Plain: The subject tract is not located within the 100 -year flood
plain.
Oversize request: None.
Impact Fees: None.
NOTIFICATION:
Legal Notice Publication(s): The Eagle; 6 -4 -05 and 6 -6 -05
Advertised Commission Hearing Dates(s): 6 -22 -05
Advertised Council Hearing Dates: 6 -23 -05
Number of Notices Mailed to Property Owners within 200': 22
Response Received: None as of date of staff report.
STAFF REPORT
Project Manager: Jennifer Prochazka, Planner Report Date: May 18, 2005
Email: jprochazka @cstx.gov Meeting Date: June 2, 2005
Item: Public hearing, presentation, discussion, and possible action on a
rezoning for Callaway Subdivision Phase II, consisting of approximatly 14 acres,
located on the east side of Marion Pugh Drive, approximately 500' south of the
intersection of George Bush Drive, including a portion of the Luther Street Right -
of -Way, from C -1 General Commercial to R -6 High Density Multi - Family.
Applicant: Rabon Metcalf Engineering, agent for Callaway Development
Corporation, and the City of College Station, owner of the Luther Street Right -of-
Way.
Staff Recommendations: Staff recommends approval of the rezoning.
Item Summary: The purpose of this request is to develop the property as a
multi - family housing complex. This item came before the Commission in March
2004 and received a unanimous recommendation for approval by the
Commission. At that time, the property owner was not ready to move forward to
the City Council for final approval of the R -6 zoning. The Planning & Zoning
commission again heard this case on April 7, 2005 and again recommended
approval unanimously. The City Council denied the rezoning request on April
14, 2005 because of traffic and accessibility concerns. On May 5, 2005 the
Planning & Zoning Commission waived the required 180 day waiting period
required by the Unified Development Ordinance for re- application of rezonings
because of available new information.
The new information submitted by the applicant is a letter for a proposed
development participation agreement with the City for the construction of the
portion of Marion Pugh Drive between approximately Luther Street and Holleman
Drive. The applicant has also submitted a Traffic Impact Analysis to assess the
traffic issues associated with the development of the subject tract. This analysis
assumes the extension of Marion Pugh Drive to Holleman Drive is constructed,
as the developer has indicated in his letter. Even though existing traffic volumes
in this area are high, the primary finding of the TIA is that the traffic that this
development generates will be accommodated by the transportation system with
the Marion Pugh Drive extension. This is primarily due to the significant number
of trips that will take place using modes other than the automobile, since the
project is in close proximity to TAMU. In addition, it is expected that the traffic
peak for the proposed apartment complex will be different than the overall
transportation network's morning and afternoon peaks that are associated with
commutes to work. In the long term (2010 and beyond), traffic conditions should
significantly improve with the construction of the Wellborn Road / George Bush
Drive grade separation and the eventual extension of Jones - Butler Drive to
George Bush Drive. The Executive Summary of the TIA is included as an
attachment to this staff report for your information.
The property to the west, across Marion Pugh Drive, is zoned R -6 and is
developed as apartments. The property to the south, across the Luther right -of-
way, is zoned R -4 and M -1 and is not developed. The property to the east,
across the railroad right -of -way and Wellborn Road, is zoned R -1 and A -P and
developed as single - family homes and offices. The northern property is
developed as a parking lot for the Callaway House Dormitory and is zoned C -1.
The rezoning of the Luther Street Right -of -Way is not an approval of the right -of-
way abandonment. The right -of -way abandonment will be submitted to the City
Council for consideration through an abandonment ordinance.
Comprehensive Plan Considerations: The Land Use Plan designates this
property as Residential Attached, therefore the rezoning request is in compliance
with the Land Use Plan. The location of the rezoning request is also supported
by the City's development policies which attempt to locate multi - family in close
proximity to Texas A &M University.
Marion Pugh Drive is designated as a major collector on the Thoroughfare Plan,
Wellborn Road is designated as a major arterial, and Luther is a residential
street in this area.
Item Background: The property was annexed in to the City and zoned Industrial
in 1958. When the zoning was changed to M -2, the district also included C -1
uses. In 1984 an amendment was made to the Zoning Ordinance that prohibited
C -1 uses in M -2 zones, however, this particular property was specifically
exempted from the exclusion of C -1 uses in an M -2 zone, and allowed the
General Commercial uses. With the adoption of the Unified Development
Ordinance, City Staff worked with the property owners by giving them the choice
of retaining the M -2 classification without the commercial uses or being rezoned
to C -1 to include the commercial uses. The property is zoned C -1.
Luther Street was closed in this area in the 1990s.
Information on Multi- family Housing in College Station: The Comprehensive
Plan proposes 1,043 acres of Residential Attached in specific locations.
There are currently 1,357 acres zoned multi - family, R -4 or R -6.
950 total acres developed as multi - family
841 acres developed as apartments & condominiums and
109 acres developed as group housing (off campus dorms)
203 acres zoned multi - family, but undeveloped. However, these are
not necessarily in areas where we desire multi - family growth.
Approximately 204 acres zoned multi - family, but developed as other
uses.
Approximately 26 acres (in various locations) currently zoned for multi-
family, but undeveloped, within one mile of Texas A &M University
campus.
Current occupancy rates for multi - family units:
86% B /CS area
87% College Station
Current occupancy rates for all rental units:
85% B /CS
86% College Station
Texas rental vacancy rates in 2003 (Census Bureau) were 14.1 %.
A certain level of vacancy is generally needed for ease of movement, housing
choice, and affordability.
Commission Action Options: The Commission acts as a recommending body
on the question of rezoning, which will be ultimately decided by City Council.
The Commission's options are:
1. Recommend approval;
2. Recommend denial;
3. Table indefinitely; or,
4. Defer action to a specified date.
Supporting Materials:
1. Location Map
2. Aerial
3. Application & Staff Memo
4. Infrastructure and Facilities
5. Letter in opposition to request
6. Letter from applicant's representative for proposed Development Agreement
7. Traffic Impact Analysis Executive Summary
INFRASTRUCTURE AND FACILITIES
Water Service: Service can be taken from the 18" main along Marin
Pugh.
Sewer Service: Service can be taken from the main along the railroad
ROW.
Streets /Access: The property fronts on and has access to Marion Pugh.
Any access to this property must meet the Driveway Ordinance.
Drainage: A Development Permit is required for development of the site.
It appears the site drains to the southeast, along the railroad ROW.
Flood Plain: The subject tract is not located within the 100 -year flood
plain.
Oversize request: None.
Impact Fees: None.
NOTIFICATION:
Legal Notice Publication(s): The Eagle; 5 -17 -05 and 6 -6 -05
Advertised Commission Hearing Dates(s): 6 -2 -05
Advertised Council Hearing Dates: 6 -23 -05
Number of Notices Mailed to Property Owners within 200': 22
Response Received: None as of date of staff report.
CITY OF COLLEGE STATION
Planning er Development Services
CITY OF COLLEGE STATION
PLANNING & DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979)764 -3570 / Fax (979)764 -3496
TO: CALLAWAY DEVELOPMENT CORPORATION
RE: CALLAWAY SUBDIVISION PHASE II
FAX: 210 -820 -3361
FROM: Lisa Lindgren, Staff Assistant
DATE: June 20, 2005
RE: Agenda & Staff Report
P &Z Meeting, June 22, 2005
Following this coversheet is a copy of the Staff Report that was prepared for the above
referenced project. Please keep in mind that staff's responsibility is to provide the
Planning & Zoning Commission with all pertinent facts of a development case, but that
staff is not acting as an advocate for the applicants. Therefore, it is in the applicant's best
interest to send a representative to the Planning & Zoning Commission meeting to speak
on behalf of the proposal.
This item is scheduled for the June 22, 2005, Planning & Zoning Commission
Meeting. This meeting will begin at 11:30 A.M. in the City Hall Council Chambers., 1101
Texas Avenue. I have included a copy of the agenda for this meeting. Please contact our
office at (979) 764 -3570 if you should have any questions. Thanks.
4ff il5111114
CITY OF COLLEGE STATION
Planning t* Development Services
CITY OF COLLEGE STATION
PLANNING & DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979)764 -3570 / Fax (979)764 -3496
TO: RABON METCALF, P.E.
RABON METCALF ENGINEERING
RE: CALLAWAY SUBDIVISION PHASE II
FAX: 979 - 690 -0329
FROM: Lisa Lindgren, Staff Assistant
DATE: June 20, 2005
RE: Agenda & Staff Report
P &Z Meeting, June 22, 2005
Following this coversheet is a copy of the Staff Report that was prepared for the above
referenced project. Please keep in mind that staffs responsibility is to provide the
Planning & Zoning Commission with all pertinent facts of a development case, but that
staff is not acting as an advocate for the applicants. Therefore, it is in the applicant's best
interest to send a representative to the Planning & Zoning Commission meeting to speak
on behalf of the proposal.
This item is scheduled for the June 22, 2005, Planning & Zoning Commission
Meeting. This meeting will begin at 11:30 A.M. in the City Hall Council Chambers., 1101
Texas Avenue. 1 have included a copy of the agenda for this meeting. Please contact our
office at (979) 764 -3570 if you should have any questions. Thanks.
CITY OF COLLEGE STATION
Planning ear Development Services
CITY OF COLLEGE STATION
PLANNING & DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979)764 -3570 / Fax (979)764 -3496
TO: CALLAWAY DEVELOPMENT CORPORATION
RE: CALLAWAY SUBDIVISION PHASE II
FAX: 210- 82Q41240 3 3i, i
FROM: Lisa Lindgren, Staff Assistant
DATE: May 31, 2005
RE: Agenda & Staff Report
P &Z Meeting, June 2, 2005
Following this coversheet is a copy of the Staff Report that was prepared for the above
referenced project. Please keep in mind that staff's responsibility is to provide the
Planning & Zoning Commission with all pertinent facts of a development case, but that
staff is not acting as an advocate for the applicants. Therefore, it is in the applicant's best
interest to send a representative to the Planning & Zoning Commission meeting to speak
on behalf of the proposal.
This item is scheduled for the June 2, 2005, Planning & Zoning Commission Meeting.
This meeting will begin at 7:00 P.M. in the City Hall Council Chambers., 1101 Texas
Avenue. I have included a copy of the agenda for this meeting. Please contact our office
at (979) 764 -3570 if you should have any questions. Thanks.
(1111 ff 115411114
CITY OF COLLEGE STATION
Planning er Development Services
CITY OF COLLEGE STATION
PLANNING & DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979)764 -3570 / Fax (979)764 -3496
TO: RABON METCALF, P.E.
RABON METCALF ENGINEERING
RE: CALLAWAY SUBDIVISION PHASE II
FAX: 979 - 690 -0329
FROM: Lisa Lindgren, Staff Assistant
DATE: May 31, 2005
RE: Agenda & Staff Report
P &Z Meeting, June 2, 2005
Following this coversheet is a copy of the Staff Report that was prepared for the above
referenced project. Please keep in mind that staffs responsibility is to provide the
Planning & Zoning Commission with all pertinent facts of a development case, but that
staff is not acting as an advocate for the applicants. Therefore, it is in the applicant's best
interest to send a representative to the Planning & Zoning Commission meeting to speak
on behalf of the proposal.
This item is scheduled for the June 2, 2005, Planning & Zoning Commission Meeting.
This meeting will begin at 7:00 P.M. in the City Hall Council Chambers., 1101 Texas
Avenue. I have included a copy of the agenda for this meeting. Please contact our office
at (979) 764 -3570 if you should have any questions. Thanks.
Jamespoint Dal Texas Suite 220
Dallas, 75240
Phone: 972/234 -1551
Management Fax: 972/234 -1580
E -mail: claningham@jmc- mgmt.com
Company
Divisionaf ChatianEnisipises,Inc.
May 26, 2005
Ms. Jennifer Prochazka
Staff Planner City Planning Office
City of College Station
1101 Texas Avenue South
P 0 Box 9960
College Station, TX 77842
Re: Rezoning of 14 ac. Tract at 305 Marion Pugh Dr.
Dear Ms. Prochazka,
I am writing in response to your notice of a proposed rezoning of the above captioned tract from
C -1 Commercial to R-6 High Density Multi- family.
We operate the Meadows Point Apartment complex at 800 Marion Pugh along with nine other
apartment complexes across College Station. Speaking on behalf of the property owners and our own
experience in the community since 1981, we strongly oppose this rezoning request for the following
reasons:
Traffic congestion.
Marion Pugh starts at George Bush and ends at our property entrance. The traffic congestion at Marion
Pugh and George Bush is already unbearable and is further congested by the railroad grade crossing
on George Bush. At the south end, traffic is already cutting through our complex to get to the homes,
duplexes and apartment complexes located between Meadows Point and FM 2818, the Harvey
Mitchell Parkway. Luther Street, adjacent to our property, is under utilized in part due to invisibility of
the intersection, in part due to limited development along Luther and in part due to the traffic attracting
entrance design of Meadows Point Apartments.
The addition of 14 acres of high density multi - family housing will exceed the capacity of Marion Pugh to
handle traffic and turn our apartment complex driveways into traffic arteries for persons trying to avoid
the permanent bottleneck that will be created at Marion Pugh and George Bush. A bottleneck that will
become catastrophic each time one of the several trains per day crosses that intersection. If this zoning
change is granted, how does the City and developer propose reimbursing Meadows Point for damages
to our driveways and loss of property value resulting from this excessive traffic?
Also, as I understand your notice, the right of way to extend Luther Street across the railroad tracks will
be lost, eliminating this corridor as a means to relieve traffic at the south end of Marion Pugh.
Perhaps the developer will pay for extending Marion Pugh to FM 2818. It is not reasonable to expect
the citizens to pay for extending Marion Pugh, as development under the present commercial zoning
will not overload Marion Pugh' s traffic capacity.
• Page 2 May 26, 2005
Train noise pollution.
The present zoning is compatible with trains moving adjacent to the long axis of the property.
Residential zoning is not. Visit the web site: apartmentratings.com and view the resident's complaints
about train noise at Sterling University. The property's desirability and value has suffered from its
proximity to the rail lines. Consider, that Sterling is not piled on the tracks, as this development would
be. A high priority for thirty years has been to move the rail lines further west to the mutual benefit of the
rail operators and the city. No progress has been made. If that move is ever made, a rezoning request
of this nature will make more sense, due to the parcel's proximity to Texas A &M.
Multi- family development tracts.
Several parcels of multi - family zoned property are available along the east side of Wellborn. They offer
some relief from the noise issue and should be developed before more land is changed to multi - family
use. College Station has several apartment development sites with adequate road and utility
infrastructure to meet a developer's needs; sites that also offer a reasonable environment for the
occupants. College Station has an oversupply of existing multi - family housing and a supply of vacant
land zoned for multi - family development. The community doesn't need to ferret out potential
development sites to meet a pent up demand for housing. I can't speak to commercial development
needs, except to state the present zoning appears in all respects to be properly zoned.
Sincerely,
Charles Laningham
President
STAFF REPORT
Project Manager: Jennifer Prochazka, Planner Report Date: June 17, 2005
Email: jprochazka @cstx.gov Meeting Date: June 22, 2005
Item: Public hearing, presentation, discussion, and possible action on a
rezoning for Callaway Subdivision Phase II, consisting of approximately 14
acres, located on the east side of Marion Pugh Drive, approximately 500' south
of the intersection of George Bush Drive, including a portion of the Luther Street
Right -of -Way, from C -1 General Commercial to R -6 High Density Multi - Family.
Applicant: Rabon Metcalf Engineering, agent for Callaway Development
Corporation, and the City of College Station, owner of the Luther Street Right -of-
Way.
Staff Recommendations: Staff recommends approval of the rezoning with the
condition that the Developer, extend Marion Pugh Drive from Luther Street to
Holleman Street at the time the property is developed.
Item Summary: The purpose of this request is to develop the property as a
multi - family housing complex. This item came before the Commission in March
2004 and received a unanimous recommendation for approval by the
Commission. At that time, the property owner was not ready to move forward to
the City Council for final approval of the R -6 zoning. The Planning & Zoning
commission again heard this case on April 7, 2005 and again recommended
approval unanimously. The City Council denied the rezoning request on April
14, 2005 because of traffic and accessibility concerns. On May 5, 2005 the
Planning & Zoning Commission waived the required 180 day waiting period
required by the Unified Development Ordinance for re- application of rezonings
because of available new information.
The new information submitted by the applicant is a letter for a proposed
development participation agreement with the City for the construction of the
portion of Marion Pugh Drive between approximately Luther Street and Holleman
Drive. The applicant has also submitted a Traffic Impact Analysis to assess the
traffic issues associated with the development of the subject tract. This analysis
assumes the extension of Marion Pugh Drive to Holleman Drive is constructed,
as the developer has indicated in his letter. Even though existing traffic volumes
in this area are high, the primary finding of the TIA is that the traffic that this
development generates will be accommodated by the transportation system with
the Marion Pugh Drive extension. This is primarily due to the significant number
of trips that will take place using modes other than the automobile, since the
project is in close proximity to TAMU. In addition, it is expected that the traffic
peak for the proposed apartment complex will be different than the overall
transportation network's morning and afternoon peaks that are associated with
commutes to work. In the long term (2010 and beyond), traffic conditions should
significantly improve with the construction of the Wellborn Road / George Bush
Drive grade separation and the eventual extension of Jones - Butler Drive to
George Bush Drive. The staff Traffic Engineer has reviewed the subject TIA and
is in general agreement with the assumptions and conclusions of the report. The
Executive Summary of the TIA is included as an attachment to this staff report
for your information.
The property to the west, across Marion Pugh Drive, is zoned R -6 and is
developed as apartments. The property to the south, across the Luther right -of-
way, is zoned R -4 and M -1 and is not developed. The property to the east,
across the railroad right -of -way and Wellborn Road, is zoned R -1 and A -P and
developed as single - family homes and offices. The northern property is
developed as a parking lot for the Callaway House Dormitory and is zoned C -1.
The rezoning of the Luther Street Right -of -Way is not an approval of the right -of-
way abandonment. The right -of -way abandonment will be submitted to the City
Council for consideration through an abandonment ordinance.
Comprehensive Plan Considerations: The Land Use Plan designates this
property as Residential Attached, therefore the rezoning request is in compliance
with the Land Use Plan. The location of the rezoning request is also supported
by the City's development policies which attempt to locate multi - family in close
proximity to Texas A &M University.
Marion Pugh Drive is designated as a major collector on the Thoroughfare Plan,
Wellborn Road is designated as a major arterial, and Luther is a residential
street in this area.
Item Background: The property was annexed in to the City and zoned Industrial
in 1958. When the zoning was changed to M -2, the district also included C -1
uses. In 1984 an amendment was made to the Zoning Ordinance that prohibited
C -1 uses in M -2 zones, however, this particular property was specifically
exempted from the exclusion of C -1 uses in an M -2 zone, and allowed the
General Commercial uses. With the adoption of the Unified Development
Ordinance, City Staff worked with the property owners by giving them the choice
of retaining the M -2 classification without the commercial uses or being rezoned
to C -1 to include the commercial uses. The property is zoned C -1.
Luther Street was closed in this area in the 1990s.
Information on Multi- family Housing in College Station: The Comprehensive
Plan proposes 1,043 acres of Residential Attached in specific locations.
There are currently 1,357 acres zoned multi - family, R -4 or R -6.
950 total acres developed as multi - family
841 acres developed as apartments & condominiums and
109 acres developed as group housing (off campus dorms)
203 acres zoned multi - family, but undeveloped. However, these are
not necessarily in areas where we desire multi - family growth.
Approximately 204 acres zoned multi - family, but developed as other
uses.
Approximately 26 acres (in various locations) currently zoned for multi-
family, but undeveloped, within one mile of Texas A &M University
campus.
Current occupancy rates for multi - family units (2004):
90.6% B /CS area
A certain level of vacancy is generally needed for ease of movement, housing
choice, and affordability.
Commission Action Options: The Commission acts as a recommending body
on the question of rezoning, which will be ultimately decided by City Council.
The Commission's options are:
1. Recommend approval;
2. Recommend denial;
3. Table indefinitely; or,
4. Defer action to a specified date.
Supporting Materials:
1. Location Map
2. Aerial
3. Application & Staff Memo
4. Infrastructure and Facilities
5. Letter in opposition to request
6. Letter from applicant's representative for proposed Development Agreement
7. Traffic Impact Analysis Executive Summary
INFRASTRUCTURE AND FACILITIES
Water Service: Service can be taken from the 18" main along Marin
Pugh.
Sewer Service: Service can be taken from the main along the railroad
ROW.
Streets /Access: The property fronts on and has access to Marion Pugh.
Any access to this property must meet the Driveway Ordinance.
Drainage: A Development Permit is required for development of the site.
It appears the site drains to the southeast, along the railroad ROW.
Flood Plain: The subject tract is not located within the 100 -year flood
plain.
Oversize request: None.
Impact Fees: None.
NOTIFICATION:
Legal Notice Publication(s): The Eagle; 6 -4 -05 and 6 -6 -05
Advertised Commission Hearing Dates(s): 6 -22 -05
Advertised Council Hearing Dates: 6 -23 -05
Number of Notices Mailed to Property Owners within 200': 22
Response Received: None as of date of staff report.