Loading...
HomeMy WebLinkAboutStaff Comments CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM January 12, 2004 TO: Robert L. Payne, Jr., Via fax 696.8114 FROM: Bridgette George, Assistant Development Manager SUBJECT: MONTELONGO'S (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: Six (6) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached (please submit additional copies to be stamped for your records). Two (2) revised site plans; and One (1) landscaping plan. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764.3570. Attachments: Staff review comments cc: Jesse Montelongo, Jr., Via fax 764.0899 Case file #03- 00500296 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 2 Project: MONTELONGO'S (SP) - 03- 00500296 PLANNING 1. Sanitation area (where you are keeping your roll off container) must be screened from all right -of -way, including the adjacent alley. The screening must be taller than the container and must be an opaque screen. Please indicate the height and material on the site plan. 2. As previously discussed please note on the site plan where trash pick up will be from. 3. You are required one more canopy tree to meet the streetscape requirement. Reviewed by: Jennifer Prochazka Date: 12 -23 -03 ENGINEERING 1. No comments. Reviewed by: Carol Cotter Date: January 8, 2004 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM December 9, 2003 TO: Robert L. Payne, Jr., Via fax 696.8114 FROM: Bridgette George, Assistant Development Manager SUBJECT: MONTELONGO'S (SP) - Site Plan Staff reviewed the above - mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) complete set of construction documents for the proposed development with the revised site and landscaping plans attached; One (1) copy of the Development Permit Application (the fee has already been paid); Two (2) copies of the Drainage Report; and Easement Dedication Sheet and required documents. Please note that the Easement Dedication Sheet and the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Jesse Montelongo, Jr., Via fax 764.0899 v Case file #03- 00500296 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 1 Project: MONTELONGO'S (SP) — 03- 00500296 PLANNING 1. Provide a general note that all roof and ground- mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right - of -way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 2. Please locate and dimension existing opposite and adjacent driveways to the proposed driveway. 3. Please reference the FEMA / FIRM map that verifies floodplain information. 4. Please provide the size of all utilities shown on plan. 5. The rear setback for C -3 is 15 feet. 6. Please provide height information. 7. Please show the existing sidewalk along University Drive. 8. Please locate the closest fire hydrant. If it is already shown on the site, please include the symbol in the legend; I could not locate it. 9. All curbs must be monolithic. The curb detail provided is not acceptable. 10. Where will sanitation pick up be? Dumpster approach area must be 6" pavement. Please modify note. 11.All public utilities must be in an easement or in the Right -of -way. Reviewed by: Jennifer Prochazka Date: 11 -25 -03 LANDSCAPING /STREETSCAPING /BUFFER 1. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights -of -way, and adjacent property disturbed during construction. 2. What material is in the end islands? Please label the areas on site that are sod or enhanced paving. 3. Please modify the irrigation note to also indicate that the irrigation plan must be approved by our department prior to C.O. 4. Streetscape is required on BOTH streets. How are you getting 105' of frontage? If it is by excluding the visibility triangle, please state that. 5. Please add "single cane" or "single trunk" after "1.25 "caliper minimum" for the size of the Crepe Myrtle. All non - canopy measurements are taken 12" from the ground on a single cane. 6. Sanitation location must be screened from all rights -of -way and adjacent properties. 7. Transformers, utility connection points, A/C units, etc. must all be screened from the right -of -way. This can usually be accomplished with plantings. Please show these items on the plan and show that they have been screened. Reviewed by: Jennifer Prochazka Date: 11 -25 -03 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 3 ENGINEERING 1. Submit development permit application and drainage report. 2. Provide proposed flow lines of rip -rap channel. 3. Are you planning a separate irrigation meter? 4. What is Waterline Connection Detail 12 for? It appears that you will be tying into existing meter and not tapping the main 5. Verify that the Concrete Drainway Detail 10 will be bolted down, capable of supporting a truck, and that the surface will meet ADA requirements. 6. Concrete Drainway Detail 10 shows brass screws at 6 feet C -C. Verify unit. 7. Identify on the Site Plan where hay bales for erosion control will be required. Reviewed by: Carol Cotter Date: December 9, 2003 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 2004 version of plat and /or site plan. email to rbolin @cstx.gov 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines. Reviewed by: Ronnie Bolin Date: 11 - 26 - 03 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 3 of 3