MEMORANDUM
May 22, 2003
TO: Wallace Phillips, Greens Prairie Investors, Ltd., Via Fax 690.1041
FROM: Bridgette George, Assistant Development Manager
SUBJECT: CASTLEGATE SUBDIVISION SECTION 13 (FP) - Final Plat
Staff reviewed the above - mentioned final plat as requested. The following page is a list
of staff review comments detailing items that need to be addressed. If all comments
have been addressed and the following information submitted by Tuesday, May 27,
2002, 10:00 a.m., your project will be placed on the next available Planning and Zoning
Commission meeting scheduled for Thursday, June 5, 2003, 7:00 p.m. in the City Hall
Council Chambers, 1101 Texas Avenue.
Two (2) copies of the revised final plat;
Impact Fees in the amount of $349.55 per dwelling unit must be submitted
prior to the filing of the final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart@ci.college - station.tx.us
Upon receipt of the required documents for the Planning & Zoning meeting, your project
will be considered formally filed with the City of College Station. Please note that if all
comments have not been addressed your project will not be scheduled for a Planning &
Zoning Commission meeting. Your project may be placed on a future agenda once all
the revisions have been made and the appropriate fees paid. If you have any questions
or need additional information, please call Carol Cotter or myself at 764 -3570.
Attachments: Staff review comments
cc: Joe Schultz, P.E. Texcon, Via fax 690.9797
Case file #03- 00500118
Home of Texas ABM University
STAFF REVIEW COMMENTS NO. 1
Project: CASTLEGATE SUBDIVISION SECTION 13 (FP) - 03- 00500118
ENGINEERING
1. Impact Fees required in order to file Final Plat.
These comments concern the construction documents required for Final Plat.
2. Provide radii of curb returns and street bends.
3. Show ROW and street width.
4. Station all long side service taps.
5. Specify service line material.
6. Specify Fire hydrant detail /type.
7. Drop connection required on Manhole No. 133 for service line with FL IN = 301.80.
Reviewed by: Carol Cotter Date: May 20, 2003
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs
first 10'. City installs remainder.
3. Developer installs pull boxes as per city specs and design.(pull boxes
provided by the city.
4. Developer provides digital AutoCAD 2000i version of plat and /or site plan.
email to rbolin ci.college- station.tx.us
5. Developer provides temporary blanket easement for construction
purposes.
6. Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
7. Developer installs street lighting per city specs and design.
Reviewed by: Ronnie Bolin Date: 5 -22 -03
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and `bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 3
Castlegate Subdivision — Section 13
Response to City of College Station Staff Review Comments (No. 1)
Engineering:
1. Impact Fees required in order to file Final Plat. — Fees will be paid prior to filing of
Final Plat.
2. Provide radii of curb returns and street bends. — Added to Sheet 2
3. Show ROW and street width. — Added to Sheet 2
4. Station all long side service taps. — All of the water services were stationed and shown
in the profile on Sheet 3.
5. Specify service line material. — The water service line material specifications were
added to Sheets 3 and 6. The sewer service line material is provided on Sheets 4 and
7.
6. Specify Fire hydrant detail /type. — The fire hydrant type was provided on Sheet 6.
7. Drop connection required to Manhole No. 133 for service line with FL IN = 301.80. —
The flowline in for the service was revised to 301.00. A drop connection is not
necessary.
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
May 28, 2003
TO: Wallace Phillips, Greens Prairie Investors, Ltd., Via Fax 690.1041
FROM: Bridgette George, Assistant Development Manager
SUBJECT: Castlegate Sect. 13 Construction Documents
Staff reviewed the above - mentioned engineering documents as requested. The
following page is a list of staff review comments detailing items that need to be
addressed. Please address the comment and submit the following information
for further staff review and approval of the plans:
Three (3) sets of revised construction documents.
If you have any questions or need additional information, please call Carol Cotter
or myself at 764.3570.
Attachments: Staff Review Comments
Cc: Joe Schultz, P.E. Texcon, Via fax 690.9797
Case file no. 03 -118
Home of Texas A&M University
CASTLEGATE SUBDIVISION SECTION 13 (FP) - (03- 00500118)
ENGINEERING REVIEW
COMMENTS No. 1
1. Sewer service lines in the ROW shall be SDR 21 or Schedule 40.
Reviewed by: Carol Cotter Date: May 28, 2003
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must
be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on
these plans that have not been pointed out to the City of College Station will constitute a
completely new review.
Page 2 of 2
Elevation 305.0. These finish floor elevations will also be at least 1 foot above the base
flood elevation determined by the Floodplain Analysis for the Castlegate Subdivision.
If you have any questions, please give me a call at (979) 764 -7743.
Sincerely Yours,
Joe Schultz, P.E.
Engineering Manager
A f
low
"
� ..............
1 ®SEPy c
cc: Randy French, Stylecraft Builders
Wallace Phillips, Greens Prairie Investors, Ltd.
Oct 21 03 05:08p TEXCON ENGINEERING 9797647759
Elevation 305.0. These finish floor elevations will also be at least 1 foot above the base
flood elevation determined by the Floodplain Analysis for the Castlegate Subdivision.
If you have any questions, please give me a call at (979) 764-774' 3.
Sincerely Yours,
Joe Schultz, P.E.
Engineering Manager
i
� � \brrt��u *�� ✓•�
IV ' `
p.3
cc: Randy French, Stylecraft Builders
Wallace Phillips, Greens Prairie Investors. Ltd.