Loading...
HomeMy WebLinkAboutSanitary Sewer ReportDoc Bk Vol Rg 00838288 OR 5744 199 CORRECTION SANITARY SEWER EASEMENT DATE: November 10, 2003 GRANTOR: SALCOR HOTEL GROUP, L.P., a Texas Limited Partnership GRANTOR'S MAILING ADDRESS: P. O. Box 2864 (including County) Brazos County Bryan, Texas 77805 GRANTEE: CITY OF COLLEGE STATION, TEXAS GRANTEE'S MAILING ADDRESS: 1101 Texas Avenue (including County) Brazos County College Station, Texas 77840 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration. EASEMENT AREA: All that certain 0.21 acre tract or parcel of land lying and being situated in the Richard Carter League, Abstract No. 8, in College Station, Brazos County, Texas, and being part of Lot 1, Block 1, Greensworld Subdivision - Phase Three, according to the plat recorded in Volume 4059, Page 57, of the Deed Records, Brazos County, Texas; said 0.021 acre tract or parcel of land being more particularly described by metes and bounds in Exhibit "A" attached hereto and made a part hereof for all purposes. This conveyance shall grant the rights herein specified only as to that portion of the above - described Easement Area more particularly described on the attached Exhibit "A" and any additional area outside the Easement Area necessary to install and attach equipment, guy wires, and anchors necessary and incident to the uses of the Easement Area to erect, construct, install, and thereafter use, operate, inspect, repair, maintain, reconstruct, modify and remove the following: Sanitary sewer lines, water lines, connecting lines, access facilities, and related equipment; upon, under, over, and across the said Easement Area as described and any ways, streets, roads, or alleys abutting same; and to cut, trim, and control the growth of trees and other vegetation on and in the Easement Area or on adjoining property of Grantors, which might interfere with or threaten the operation and maintenance of any public utility equipment, accessories, or operations. It being understood and agreed that any and all equipment and facilities placed upon said property shall remain the property of Grantee. Grantors expressly subordinate all rights of surface use incident to the mineral estate to the above described uses of said surface by Grantee, and agree to lender's subordinations on behalf of Grantee. Grantors will provide Grantee with the names and addresses of all lenders. Page 1 BgRegal ... group(o) /easements /salcor hotel - hampton inn 10.21 acre sanitary sewer easement/correction sanitary sewer easement.doc 11/10/2003 Doc Bk Vol Pg 00838288 OR 5744 200 RESERVATIONS AND RESTRICTIONS: None TO HAVE AND TO HOLD, the rights and interests herein described unto the CITY OF COLLEGE STATION, TEXAS, and its successors and assigns, forever, and Grantors do hereby bind themselves, their heirs, executors, administrators, successors and assigns, to warrant and forever defend, all and singular, these rights and interests unto the CITY OF COLLEGE STATION, TEXAS, and its successors and assigns, against every person whomsoever lawfully claiming, or to claim same, or any part thereof. This CORRECTION SANITARY SEWER EASEMENT is in lieu of and in place of Sanitary Sewer Easement dated November 10, 2003 executed by Salim M. Ismail to the City of College Station, Texas, recorded in Volume 5720, Page 267, Official Records of Brazos County, Texas, wherein the name of Grantor was erroneously shown as Salim M. Ismail when in fact it should have been shown as Salcor Hotel Group, L.P., a Texas Limited Partnership and the name of Lienholder was erroneously shown as Planters & Merchants State Bank when in fact it should have been shown as Wallis State Bank. Other than correcting the name of Grantor and Lienholder, no changes were made in the Sanitary Sewer Easement as originally executed, and the effective date of this Correction Sanitary Sewer Easement relates back to the effective date of the Sanitary Sewer Easement being corrected. SALCOR HOTEL GROUP. L.P., a Texas Limited Partnership By: SALIM ISMAIL, L.L.C., a Texas limited liability cmmnanv (Teneral Partner CONSENT AND SUBORDINATION BY LIENHOLDER Lienholder, as the holder of liens(s) on the fee simple title to the Easement Property, consents to the above grant of an easement, including the terms and conditions of such grant, and Lienholder subordinates its lien(s) to the rights and interests of the easement, such that a foreclosure of the lien(s) will not extinguish the rights and interests of the easement. WALLIS STATE BANK BY: Printed Title: I lc [' APPROVED: City Attorney Page 2 Bgaegal ... group(o) /easements /salcor hotel - hampton inn 10.21 acre sanitary sewer easement/correction sanitary sewer easement.doc 11110/2003 SALIM ISMAIL, President Doc Bk 00838288 OR THE STATE OF TEXAS § COUNTY OF BRAZOS § ACKNOWLEDGMENT 57441 201 This instrument was acknowledged before me on the 1 day of NO 2003, by SALIM ISMAIL, as President of SALIM ISMAIL, L.L.C., a Texas limited liability company, as General Partner of SALCOR HOTEL GROUP., L.P., a Texas limited partnership, on behalf of said SALCOR HOTEL GROUP, L.P. 0 50 THE STATE OFT XAS § § COUNTY OF § L ,L�- W I zAA 1L RkW 1 ACKNOWLEDGMENT is ' nstrument was ackpowled d before e o the l day of XW , 2003, by as , of WALLIS STATE BANK, on behalf of aid bank. 7 PHEOBE KAY DYCHES MYCOMMiSSKNJExPIRES Notary Public in d r the Stat of TEXAS r g�ptomb�r 26, 2004 F lo', PREPARED IN THE OFFICE OF: RETURN ORIGINAL DOCUMENT TO: City of College Station City of College Station Legal Department Legal Department P.O. Box 9960 P.O. Box 9960 College Station, Texas 77842 -9960 College Station, Texas 77842 -9960 Page 3 Bgll egal ... group(o)leasements/salcor hotel - hampton inn 10.21 acre sanitary sewer easement/correction sanitary sewer easement.doc 11/10/2003 Lot 1, Blk 1 Doc Bk 00 OR — 20 ."V S Sewer Easemen Re -Route on 21" Sanitary Sewer Line Greensworld Subdivision - Phase Three Volume 4059, Page 57 Richard Carter Survey, A -8 College Station, Brazos County, Texas 5744 202 9 Field notes of a 20-' wide sanitary sewer easement, lying and being situated in the Richard Carter Survey, Abstract No. 8, College Station, Brazos County, Texas, and being part of Lot 1, Blk 1 of Greensworld Subdivision - Phase Three according to the plat recorded in Volume 4059, Page 57, of the Official Records of Brazos County, Texas, and being more particularly described as follows: COMMENCING at 1 /" iron rod found marking the northwest corner of the beforementioned Lot 1, Blk 1 - Greensworld Subdivision - Phase Three in the east right -of -way line of Earl Rudder Freeway (State Highway No. 6 - East By- Pass); THENCE N 75 00' 38" E along the north line of the beforementioned Lot 1, Blk 1 - Greensworld Subdivision - Phase Three for a distance of 32.61 feet to a 60d nail set in the southwest line of a 20' City of College Station sanitary sewer easement recorded in Volume 399, Page 107, of the Deed Records of Brazos County, Texas; THENCE S 35 45'18" E along the southwest line of the beforementioned 20' wide sanitary sewer easement and through the interior of the beforementioned Lot 1, Blk 1 - Greensworld Subdivision - Phase Three, for a distance of 126.73 feet to a nail set at the PLACE OF BEGINNING of this description; THENCE continuing along the southwest line of the beforementioned 20' wide sanitary sewer easement, as follows: S 35 45' 18" E for a distance of 4.62 feet to an angle point comer, S 56 45' 14" E for a distance of 29.87 feet to a nail set; THENCE thru the interior of the beforementioned Lot 1, Blk 1, as follows: S 18 13'02" E for a distance of 133.64 feet to a nail set, S 75 09' 11" E for a distance of 263.79 feet to a nail set in the southwest line of the beforementioned 20' wide sanitary sewer easement (3991107); THENCE S 56 E along the southwest line of the beforementioned 20' wide sanitary sewer easement for a distance of 54.00 feet to a nail set in the south line of Lot 1, Blk 1 - Greensworld Subdivision - Phase Three, same being in a curve, concave to the north, having a radius of 130.00 feet; THENCE along the south line of the beforementioned Lot 1, Blk 1 - Greensworld Subdivision Phase Three, as follows: Westerly along said curve for an are length of 27.77 feet to a' /" iron rod found at the end of this curve, the chord bears N 81 16'23" W - 27.72 feet; N 75 09' 11" W at a distance of 160.87 feet, pass a' /" iron rod found marking the beginning of a curve where said lot line curves away to the southwest, continue on thru the interior of Lot 1, Blk 1, for a total distance of 298.31 feet to a nail set; THENCE N 18 13' 02" W for a distance of 172.25 feet to the PLACE OF 3EGINNING, encompassing an area of 0.21 acre, more or less. C ,�. f( V K v,- , �-�� Surveyed July 2003 S. M. KLING . repared 07/3112003 2003 S. M. Kling !s03- 03a:Ve- mute21 "ss PYRIPITA R. P. L. S. No. 2003 1EERING AND SURVEYING BRYAN.TEXAS Doc Bk Vol Pg 0P"38288 OR 5744 203 SCALE: 1' -60' NN N'^ EAS EM ENT RE—.ROUTE M 1 /2' IRON R00 FOUND 22.51.'23 "E^' 157 39 I ,Z tR °" r S aoo F0U1+o 0 2 1E R� (00.60' Ar 9• A: " lop CHD: S 82 a°o Q.8 „1kf' S 76 9 3 20 "E, S $'08'02 "EN9 yr IRON , i�` Q ?4. 8' Q aoo FOUND 56r i. 1 /r IRON R00 FOUND O GREENSWORLD PHASE III ti Nye LOT BLOCK ONE �9r ; •. ' . PLATTED — VOL 4059, PG. 57 1/r IRON 3 N a. R00 FOUND rwb , ' .1,�t. ' p°� 0 h� PORTION OF ', �h EASEMENT TO BE `'i 1�AR 1 W �' ABANDONED ' • �� , grr r IIr IRON V •i f Q ROD FOUND O 6 $< Ab 1z cy he C 7 c I V di 1/2' IRON i /r IRON " . ) Q ROD FOUND , ' i ' r.,'� `7 R00 FOUND $ N < > r S 18' 13'02 "EN 133.64' >��.'�• > :'' h ' t j O O S 35 "E ......,..,..•l ## €< } : ; { •� M ! h ,w►.,•n , r.�f+:: S+'"•!�¢,:. <i:.t < >:S':M1i`if >i;ij23i .I it•:i >r >. t y. ,# N �S •yak' i �t �.3: ( �, y � '.Ji i ,•ii;3�i�.,. #> i , £ #;3t1,3t� >, 3•. 4.6'1 � �'• �, �•`I:�ti�'i� .� {„ ;i < >' t�} ;� Z N 18' 13'02" W- 172.25' �, / 45 a.�r� 6• P.O.B. 32.61' --- - - - - -- - - - - - - - - - - - - - - - - - - CITY OF COLLEGE STATION y P M', i 20' ELECTRICAL EASEMENT V01, 2478, PG. 255 N 18 *13'02 Fl ir3 86 VOL 1198, PG. 483 1/r IaoN STATE HIGHWAY 6 - ACCESS ROAD �° R00 FOUND ROD FOUND CURVE TABLE C # DELTA RADIUS LENGTH BEARING CHORD C1 12'14'25' 130.00' 27.77' N 81 27.72' itakom TAB; SSESMT KUNG ENGINEERING & SURVEYING PROJECT OrCREEN5IMORLO PH 3 BRYAN, TEXAS : H1 F1 I1 f, Z o m 2 ru g a .az .. i.4 it In t �tLy, C �s f SANITARY SEWER ANALYSIS Greensworld Phase 3 Richard Carter Survey, A -8 College Station, Brazos County, Texas August 8, 2003 PREPARED BY: Kling Engineering & Surveying 4011 Texas Ave., Suite A Bryan, Texas 77802 (979) 846 -6212 SANITARY SEWER ANALYSIS Greensworld Phase 3 Richard Carter Survey, A -8 College Station, Brazos County, Texas August 8, 2003 PURPOSE: The purpose of this report is to document design considerations for the proposed reroute of the existing 21" sanitary sewer line. This is not a comprehensive system analysis and only accounts for an approximate 1317 lineal feet of existing 21" sanitary sewer line (from City of College Station designated manhole M006 to M012). The realignment of the sanitary sewer line due to the development of the subject property. It is assumed that the existing 21" trunk line is operating near full flow capacity & that there is existing capacity to support the proposed development of Greensworld Phase 3. The subject property for this report is located on the southwest side of Carter's Creek, adjacent to State Highway 6 approximately 600 If southeast of the F.M. 60 / State Highway 6 intersection. Current development plans for the subject property include a 79 room, three story hotel with associated parking and site amenities. Currently there is no developed land use and the property is vacant. Sanitary Sewer Analysis Page 2 of 5 Greensworld Phase 3 August 8, 2003 EXISTING CONDITIONS ANALYSIS: The sanitary sewer manholes (SSMH) were field located and flowlines at the center of the manhole measured. For purposes of this report, flowline elevations into and out of the manhole are were assumed to be 0.05' higher and 0.05' lower than the measured center elevation. This is to account for an assumed 0.1' drop from the entrance flowline elevation to the exit flowline elevation. The existing sewer line pipe material is concrete with an assumed Manning's n value of 0.013. The sanitary sewer flow rate through this section of the system was assumed to be the maximum flow capacity of the existing 21" sanitary sewer line between SSMH M011 and SSMH M012. This flowrate was calculated using Manning's formula to be 6.62 cfs. Full flow capacity of the 21" line was calculated to be 6.16 cfs (refer to Appendix A for computation). The hydraulic grade line (HGL) elevations into and out of the SSMH's were computed using the Standard Step Method. The Standard Method was used to estimate headloss through the SSMH's. A headloss coefficient of 0.60 was used in the analysis at each SSMH. The following table summarizes the existing conditions analysis. Existing Conditions Upstream Downstream Section Upstream Downstream Constructed n Qfull Q Upstrm Dwnstrm SSMH SSMH Size Invert Invert Slope HGL HGL Elevation Elevation Elev Elev (ft) (ft) (ft/ft) (cfs) (cfs) (ft) (ft) M006 M011 21 inch 249.21 248.30 0.00110 0.013 5.26 6.62 251.58 250.14 M011 M012 21 inch 248.20 247.46 0.00151 0.013 6.16 6.62 250.07 249.21 Table 1 PROPOSED REROUTE ANALYSIS: Design Considerations: The proposed reroute of the 21" sanitary sewer line will begin at existing SSMH M011 and end at existing SSMH M012. The existing 21" A.C. line will be grout filled and abandoned in place. The proposed reroute will require approximately 500 If of new sewer line and the addition of two SSMH. The new sanitary sewer line is to be constructed out of 24" DR -25 AWWA C -905 PVC pipe. It was decided that an increase in line size from 21" to 24" was necessary for two reasons: 1) due to the increased length of line between existing manholes the slope of the line decreased, to maintain existing system capacity additional flow area had to be provided 2) 21" DR -25 AVW11A C -905 pipe is not available The Manning's n value used for the analysis is 0.013 in accordance with TNRCC for minimum acceptable "n ". "The minimum acceptable "n" for design and construction shall be 0.013. The "n" used takes into consideration the slime, grit and grease layers that will affect hydraulics or hinder flow as the pipe matures." - TRNCC Rules Ch 317 Design Criteria for Sewerage Systems, §317.1.c.2 Sanitary Sewer Analysis Greensworld Phase 3 August 8, 2003 Page 3 of 5 An exception to TNRCC Design Details for manhole inverts ( §317.1.c.5.E) to match flowlines of different sized pipes instead of tops of pipes is proposed with the reroute constraints generating this design exception are as follows: 1) The upstream existing SSMH -M011 will not be removed /replaced, the bottom bench and invert channel will be reshaped to conform to the new SSMH entrance & outlet pipe configuration. Proposed flowline out is to equal the existing flowline out 2) Due to the existing 21" line having a small slope of approximately 0.15% and the proposed reroute having a similarly small slope, matching tops of pipes at SSMH -M011 resulting in a 3" vertical drop eliminates approximately 167 If of horizontal run required for the reroute to be accomplished 3) A portion of existing 21" line is to remain in place at the end of the reroute. A new SSMH, proposed SSMH -2, will be installed into the existing line. Matching tops of the two lines at this location would cause the upstream flowline to be lower than the existing downstream flowline The The new SSMH's are proposed to be constructed with a smooth "U" shaped channel having a minimum 18" depth. The minimum slope of the channel is to equal the slope of the proposed line (approximately 0.15 %). This results in an approximate 0.01' difference in flowline in / flowline out of a 6' inside diameter SSMH as opposed to the usual design convention of 0.1'. Analysis 1: Proposed Design Conditions The following table summarizes the proposed reroute conditions analysis (refer to Appendix A for computation summary) Proposed Reroute Conditions Upstream Downstream Section Upstream Downstream Constructed n Qfull Q Upstrm Dwnstrm SSMH SSMH Size Invert Invert Slope HGL HGL Elevation Elevation Elev Elev (ft) (ft) (ft/ft) (cfs) (cfs) (ft) (ft) EX M006 EX M011 21 inch 249.26 248.25 0.00122 0.013 5.54 6.62 251.18 249.83 EXM011 PROP SSMH -1 24 inch 248.25 . 248.00 0.00150 0.013 8.75 6.62 249.77 249.62 PROP SSMH -1 PROP SSMH -2 24 inch 247.99 247.50 0.00148 0.013 8.70 6.62 249.56 249.31 PROP SSMH -2 EX M012 21 inch 247.49 247.41 0.00174 0.013 6.61 6.62 249.24 249.16 Table 2 Sanitary Sewer Manhole Design: As stated above, the SSMH's are proposed to be constructed without the usual 0.1' difference in flowline in / flowline out. A comparison of the hydraulics resulting from both the proposed SSMH design and a SSMH with a 0.1' drop was performed for reference. The following table summarizes & compares the results (refer to Appendix A for computation summary). Sanitary Sewer Analysis Greensworld Phase 3 August 8, 2003 SSMH Hvdraulic Comparison (0.1' Drop in SSMH Page 4 of 5 SSMH Flowline Flowline Vel In Vel Out HGL In HGL Out EGL In EGL Out In Out Elev Elev Elev Elev (ft) (ft) (ft/s) (ftts) (ft) (ft) (ft) (ft) EX M011 248.20 2.89 2.59 249.83 249.77 249.97 249.87 PROP SSMH -1 248.00 247.90 2.42 2.36 249.63 249.57 249.72 249.66 PROP SSMH -2 247.59 247.49 2.30 2.75 249.31 249.24 249.39 249.36 EX M012 247.41 2.75 249.16 249.28 Table 3 SSMH Hvdraulic Comparison (0.01' Drop in SSMH SSMH Flowline Flowline Vel In Vel Out HGL In HGL Out EGL In EGL Out In Out Elev Elev Elev Elev (ft) (ft) (ft/s) (ft/s) (ft) (ft) (ft) (ft) EX M011 248.25 2.90 2.59 249.83 249.77 249.96 249.87 PROP SSMH -1 248.00 247.99 2.43 2.50 249.62 249.56 249.71 249.66 PROP SSMH -2 247.50 247.49 2.21 2.75 249.31 249.24 249.39 249.36 EX M012 247.41 2.75 249.16 249.28 Table 4 As seen above, the omission of the 0.1' drop across the SSMH has a minor reducing effect on the headloss through proposed SSMH -1. This is evidenced by the slight reduction of the energy grade line elevation at proposed SSMH -1. No effect was seen at proposed SSMH -2. Holding a 0.1' drop across the SSMH decreases the slope of rerouted line from proposed SSMH -1 to proposed SSMH -2 to 0.094 %. At these small slopes, it is appears more desirable to maximize the line slope than hold a 0.1' drop in the manhole. Sanitary Sewer Analysis Greensworld Phase 3 August 8, 2003 CONCLUSIONS: Page 5 of 5 The following table compares the hydraulic grade line elevations at the entrance and exits of the SSMH Hvdraulic Comparison The proposed reroute design does not adversely affect the existing sanitary sewer line flow characteristics upstream or downstream. As shown in table 3 above, for the given design considerations, the rerouted sanitary sewer reduces the hydraulic grade line elevation at the beginning SSMH -M011 and ending SSMH -M012. The hydraulic grade line through the proposed SSMH -1 and SSMH -2 decreases in elevation from flowline in to flowline out by an average of 0.06' per SSMH. u b'� State of Texas No. 24705 HGL Elev In HGL Elev Out SSMH Existing Proposed Existing Proposed (ft) (ft) (ft) (ft) EX M006 251.58 251.18 251.58 251.18 EX M011 250.14 249.83 250.07 249.77 PROP SSMH -1 N/A 249.62 N/A 249.56 PROP SSMH -2 N/A 249.31 N/A 249.24 EX M012 249.21 249.16 249.21 249.16 Table 5 The proposed reroute design does not adversely affect the existing sanitary sewer line flow characteristics upstream or downstream. As shown in table 3 above, for the given design considerations, the rerouted sanitary sewer reduces the hydraulic grade line elevation at the beginning SSMH -M011 and ending SSMH -M012. The hydraulic grade line through the proposed SSMH -1 and SSMH -2 decreases in elevation from flowline in to flowline out by an average of 0.06' per SSMH. u b'� State of Texas No. 24705 APPENDIX A HYDRAULIC COMPUTATION SUMMARY 21 " AC Worksheet for Circular Channel Project Description Project File hAengineering projects \greensworld phase 3 \san swr.fm2 Worksheet 21 "AC Flow Element Circular Channel Method Manning's Formula Solve For Full Flow Capacity Input Data Mannings Coefficient 0.013 Channel Slope 0.001510 ft/ft Diameter 21.0 in Results Depth 21.0 in Discharge 6.157 cfs Flow Area 2.41 ft 2 Wetted Perimeter 5.50 ft Top Width 0.00 ft Critical Depth 0.91 ft Percent Full 100.00 Critical Slope 0.005200 ft/ft Velocity 2.56 ft/s Velocity Head 0.10 ft Specific Energy FULL ft Froude Number FULL Maximum Discharge 6.62 cfs Full Flow Capacity 6.16 cfs Full Flow Slope 0.001510 ft/ft 08/07/03 FlowMaster v5.12 10:58:22 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755 -1666 Page 1 of 1 Vial.. EX SSMH -MO12 EX SSMH -Mi Project Title: GREENSWORLD PHASE 3 - RE -ROUTE Project Engineer: KLING ENGINEERING h:\..\greensworld phase 3\san- exis.stm KLING ENGINEERING Storm CAD v1.0 08/06/03 01:39:18 PM m Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755 -1666 Page 1 of 1 o :r v ova O J � M w (D -I O Vf O L) � :L X a my m D m � m G m r � O x x D = ni Un N 3 m w m M 0 c 0 m 61 CD N d 4 3 m O a N 7 n W J ca O O a r m Z O m m Z a M m m m M c 0 -i 0 4 J 0 co c D N O W J VI O) O O W O m m co X Z G) wm o Z 3 0 0 z cD O m ° z , b0 p;r C) C !2 W 7o .... no PD Y O O ;:P;3� U1r�7C� 502 »� mm A p�NN EnTo 33 N �1 , 1 NQ1� �a m rn� O fdA� c -- 33: O ^'m lw x w N oa•3 3 0 A N N ( N� N N N N N N N 8 OI W O N G W 0 O N O 8888880088 0R-0 co 0 ' ) |e XX c fl)§ 0 �k \jm �T a =m �q 2|® q ([ )) C� TI . &-0 §i �� § -� hi N @(D �m F4, �ƒ ) , . , k� 0 /�� E o m , e m �k� (§ E k S B - �k << ! 9 9■�� 0 cx m ■ v% �k�� 4 m 0 ¢ ; §k co \� 99 J; ° tj ° \k ° m kk k/� ° o i z k oo a c § § ƒ aw \ �@ 4 E S ( d § 2 0 <� kk(D w �: o m ) <, G k , 0 N¥ )m �• § @ 7 £ m �§ a)k ] \ �U o2\ \ � @w OD (D z 0 em om! E§ 20z wQ am 0 >m °° \�7 �bc N ■ � g � N ■ $ � � ■ � ■ F �5 iG,'l C..gNJi naYS EX SSMH -MO12 SSMH -2 Project Title: GREENSWORLD PHASE 3 - RE -ROUTE Project Engineer: KLING ENGINEERING h: \..\greensworld phase 3\san -prol .stm KLING ENGINEERING StormCAD v1.0 08/06/03 11:24:27 AM ®Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755 -1666 Page 1 of 1 C-A JJlvll--I— IVIUU0 OD 2�D d�\ jkj )Eq 2 \ w2 /§ � a §3: R \§ k � k 7 c � p� e �& E � I ! \ \ CD 0 �8 (, \k k§ m /2 ƒ Q \ j co E » F \ T G E � _0 £ \ \ ; X Q gz 2\2 \02 a±z : be o )� ; d Mi f � � � � � k � a88a88a8888 o :r -V OD c O m O w= � N m o a 00 m m v m z w = v v o = N N 3 m w m M O c O m x m m d a S O a N O w J m O O a r (D Z m C) o m m Z a O 5 Z oT m m v6 c Q n 0 J O OD c V) D N W J (71 M O) 2 . m _ W O r Z O m o Z �3 G) d n Z m v m 1 ^ Z vvv _v, W N D N - v m m X x c v co N 0 m tnWmm 3 K 3 3 - g X � � X N G7 0 C A 3v�to3 3 A L + fn M v 888 m � 3 � 0) (D 4 un d c ry ;L rn ° N N ,N,pp A V V 00 & d N LA �88N 3 w VV 01 j p 8 O O 8 vf � 0 0 0 0 N7 88_ 3- 0 2 A 0 o O O O c to O O O O W W W W � N rn O 0o p O N A Q Ic N N N N n N N N N Q N N W N N�pp N 0 .N. 0 - W Al A A 0 w w (D J x N 1 A �i w vr01 0) N W N N N N] N f f 5D v d m ' a l< W N 0 V W 01 �mf m St a 50 (5!O !D CD OD (NWO - (O J Ol CO 5 pt �D �D 3 S1 N H r � O O =-0 °) ' o co 0 0 O w � y (D L ya o m D Z w � O 0 2 N D 3 m w T M O c 1 0 m 2 d W a co 0 a N 5 n w J c7 O O N a r O o m C 6 a m m 9 8 3- 6 c l/ O O) J O OD c D N O w J ()1 N O) D) D) O 0 m m r Z G) S m O Z 0 Z m O m ° z ' V n V T Cl) A 3 N Ul A W N (D T v m m ;u ;uxx c C U T N G7 G7 N O N O (1) 2 2 3 T 3 3 3 g X � � X f C N N =NN= 3 3 3 A A N O F' o o 0 (D O N A� v0 ( 8 O ( 01 Dl N A W m �,3 M p w 8 0 O (D d �N v X 74 N m ( J m 0 v V 01 OD OD �(n d am D) w � w 0, O .OAI p 8 0 0 O O O O N 0 g g g o 2 N � A A O O (D 0 0000 c 1 ° 0 0 0 0 J J J J W W W W (� d O) O) V 0 y O) 0 OD N •.• n -� N W 0) N 0 O) 0) O W N O) b) 0) 0) 0) N N N N N N N N O .yi v r W ( OI ( �G O (0 N W N 0 O N v `� N A A A Ln = N '' A. r d -4 O (o (0 <o ro O w w N N N 0 I ( ( (AO J „ w Go N M,< D1 O ' 7 N N N N A A A A .-. 7 N N N (o (o (o N N V N D) co (o ' V n V T Cl) A 3 N Ul SANITARY SEWER ANALYSIS Greensworld Phase 3 Richard Carter Survey, A -8 College Station, Brazos County, Texas August 8, 2003 PREPARED BY: Kling Engineering & Surveying 4011 Texas Ave., Suite A Bryan, Texas 77802 (979) 846 -6212 SANITARY SEWER ANALYSIS Greensworld Phase 3 Richard Carter Survey, A -8 College Station, Brazos County, Texas August 8, 2003 PURPOSE: The purpose of this report is to document design considerations for the proposed reroute of the existing 21" sanitary sewer line. This is not a comprehensive system analysis and only accounts for an approximate 1317 lineal feet of existing 21" sanitary sewer line (from City of College Station designated manhole M006 to M012). The realignment of the sanitary sewer line due to the development of the subject property. It is assumed that the existing 21" trunk line is operating near full flow capacity & that there is existing capacity to support the proposed development of Greensworld Phase 3. The subject property for this report is located on the southwest side of Carter's Creek, adjacent to State Highway 6 approximately 600 If southeast of the F.M. 60 / State Highway 6 intersection. Current development plans for the subject property include a 79 room, three story hotel with associated parking and site amenities. Currently there is no developed land use and the property is vacant. Sanitary Sewer Analysis Page 2 of 5 Greensworld Phase 3 August 8, 2003 EXISTING CONDITIONS ANALYSIS: The sanitary sewer manholes (SSMH) were field located and flowlines at the center of the manhole measured. For purposes of this report, flowline elevations into and out of the manhole are were assumed to be 0.05' higher and 0.05' lower than the measured center elevation. This is to account for an assumed 0.1' drop from the entrance flowline elevation to the exit flowline elevation. The existing sewer line pipe material is concrete with an assumed Manning's n value of 0.013. The sanitary sewer flow rate through this section of the system was assumed to be the maximum flow capacity of the existing 21" sanitary sewer line between SSMH M011 and SSMH M012. This flowrate was calculated using Manning's formula to be 6.62 cfs. Full flow capacity of the 21" line was calculated to be 6.16 cfs (refer to Appendix A for computation). The hydraulic grade line (HGL) elevations into and out of the SSMH's were computed using the Standard Step Method. The Standard Method was used to estimate headloss through the SSMH's. A headloss coefficient of 0.60 was used in the analysis at each SSMH. The following table summarizes the existing conditions analysis. The proposed reroute of the 21" sanitary sewer line will begin at existing SSMH M011 and end at existing SSMH M012. The existing 21" A.C. line will be grout filled and abandoned in place. The proposed reroute will require approximately 500 If of new sewer line and the addition of two SSMH. The new sanitary sewer line is to be constructed out of 24" DR -25 AWWA C -905 PVC pipe. It was decided that an increase in line size from 21" to 24" was necessary for two reasons: 1) due to the increased length of line between existing manholes the slope of the line decreased, to maintain existing system capacity additional flow area had to be provided 2) 21" DR -25 AWWA C -905 pipe is not available The Manning's n value used for the analysis is 0.013 in accordance with TNRCC for minimum acceptable "n ". "The minimum acceptable "n" for design and construction shall be 0.013. The "n" used takes into consideration the slime, grit and grease layers that will affect hydraulics or hinder flow as the pipe matures." - TRNCC Rules Ch 317 Design Criteria for Sewerage Systems, §317.1.c.2 Q 1-t Existing Conditions Upstream Downstream Section Upstream Downstream Constructed n Qfull Q Upstrm Dwnstrm SSMH SSMH Size Invert Invert Slope HGL HGL Elevation Elevation ski Elev Elev (ft) (ft) (ft/ft) (cfs) (cfs) (ft) (ft) M006 M011 21 inch 249.21 248.30 0.00110 0.013 5.26 6.62 251.58 250.14 M011 M012 21 inch 248.20 247.46 0.00151 0.013 6.16 6.62 250.07 249.21 Table 1 PROPOSED REROUTE ANALYSIS: Design Considerations: The proposed reroute of the 21" sanitary sewer line will begin at existing SSMH M011 and end at existing SSMH M012. The existing 21" A.C. line will be grout filled and abandoned in place. The proposed reroute will require approximately 500 If of new sewer line and the addition of two SSMH. The new sanitary sewer line is to be constructed out of 24" DR -25 AWWA C -905 PVC pipe. It was decided that an increase in line size from 21" to 24" was necessary for two reasons: 1) due to the increased length of line between existing manholes the slope of the line decreased, to maintain existing system capacity additional flow area had to be provided 2) 21" DR -25 AWWA C -905 pipe is not available The Manning's n value used for the analysis is 0.013 in accordance with TNRCC for minimum acceptable "n ". "The minimum acceptable "n" for design and construction shall be 0.013. The "n" used takes into consideration the slime, grit and grease layers that will affect hydraulics or hinder flow as the pipe matures." - TRNCC Rules Ch 317 Design Criteria for Sewerage Systems, §317.1.c.2 Sanitary Sewer Analysis Greensworld Phase 3 August 8, 2003 Page 3 of 5 An exception to TNRCC Design Details for manhole inverts ( §317.1.c.5.E) to match flowlines of different sized pipes instead of tops of pipes is proposed with the reroute constraints generating this design exception are as follows: 1) The upstream existing SSMH -M011 will not be removed /replaced, the bottom bench and invert channel will be reshaped to conform to the new SSMH entrance & outlet pipe configuration. Proposed flowline out is to equal the existing flowline out 2) Due to the existing 21" line having a small slope of approximately 0.15% and the proposed reroute having a similarly small slope, matching tops of pipes at SSMH -M011 resulting in a 3" vertical drop eliminates approximately 167 If of horizontal run required for the reroute to be accomplished 3) A portion of existing 21" line is to remain in place at the end of the reroute. A new SSMH, proposed SSMH -2, will be installed into the existing line. Matching tops of the two lines at this location would cause the upstream flowline to be lower than the existing downstream flowline The The new SSMH's are proposed to be constructed with a smooth "U" shaped channel having a minimum 18" depth. The minimum slope of the channel is to equal the slope of the proposed line (approximately 0.15 %). This results in an approximate 0.01' difference in flowline in / flowline out of a 6' inside diameter SSMH as opposed to the usual design convention of 0.1'. Analysis 1: Proposed Design Conditions The following table summarizes the proposed reroute conditions analysis (refer to Appendix A for computation summary) Proposed Reroute Conditions Upstream Downstream Section Upstream Downstream Constructed n Qfull Q Upstrm Dwnstrm SSMH SSMH Size Invert Invert Slope HGL HGL Elevation Elevation Elev Elev (ft) (ft) (ft/ft) (cfs) (cfs) (ft) (ft) EX M006 EX M011 21 inch 249.26 248.25 0.00122 0.013 5.54 6.62 251.18 249.83 EX M011 PROP SSMH -1 24 inch 248.25 . 248.00 0.00150 0.013 8.75 6.62 249.77 249.62 PROP SSMH -1 PROP SSMH -2 24 inch 247.99 247.50 0.00148 0.013 8.70 6.62 249.56 249.31 PROP SSMH -2 EX M012 21 inch 247.49 247.41 0.00174 0.013 6.61 6.62 249.24 249.16 Table 2 Sanitary Sewer Manhole Design: As stated above, the SSMH's are proposed to be constructed without the usual 0.1' difference in flowirne in / flowline out. A comparison of the hydraulics resulting from both the proposed SSMH design and a SSMH with a 0.1' drop was performed for reference. The following table summarizes & compares the results (refer to Appendix A for computation summary). Sanitary Sewer Analysis Greensworld Phase 3 August 8, 2003 SSMH Hvdraulic Comparison (0.1' Drop in SSMH Page 4 of 5 SSMH Flowline Flowline Vel In Vel Out HGL In HGL Out EGL In EGL Out In Out _ Elev Elev Elev Elev (ft) (ft) (ft/s) (ft/s) (ft) (ft) (ft) (ft) EX M011 248.20 2.89 2.59 249.83 249.77 249.97 249.87 PROP SSMH -1 248.00 247.90 2.42 2.36 249.63 249.57 249.72 249.66 PROP SSMH -2 247.59 247.49 2.30 2.75 249.31 249.24 249.39 249.36 EX M012 247.41 2.75 249.16 249.28 Table 3 SSMH Hvdraulic Comparison (0.01' Drop in SSMH SSMH Flowline Flowline Vel In Vel Out HGL In HGL Out EGL In EGL Out In Out Elev Elev Elev Elev (ft) (ft) (ft/s) (ft/s) (ft) (ft) (ft) (ft) EX M011 248.25 2.90 2.59 249.83 249.77 249.96 249.87 PROP SSMH -1 248.00 247.99 2.43 2.50 249.62 249.56 249.71 249.66 PROP SSMH -2 247.50 247.49 2.21 2.75 249.31 249.24 249.39 249.36 EX M012 247.41 2.75 249.16 249.28 Table 4 As seen above, the omission of the 0.1' drop across the SSMH has a minor reducing effect on the headloss through proposed SSMH -1. This is evidenced by the slight reduction of the energy grade line elevation at proposed SSMH -1. No effect was seen at proposed SSMH -2. Holding a 0.1' drop across the SSMH decreases the slope of rerouted line from proposed SSMH -1 to proposed SSMH -2 to 0.094 %. At these small slopes, it is appears more desirable to maximize the line slope than hold a 0.1' drop in the manhole. Sanitary Sewer Analysis Greensworld Phase 3 August 8, 2003 CONCLUSIONS: Page 5 of 5 The following table compares the hydraulic grade line elevations at the entrance and exits of the SSMH Hvdraulic Comparison The proposed reroute design does not adversely affect the existing sanitary sewer line flow characteristics upstream or downstream. As shown in table 3 above, for the given design considerations, the rerouted sanitary sewer reduces the hydraulic grade line elevation at the beginning SSMH -M011 and ending SSMH -M012. The hydraulic grade line through the proposed SSMH -1 and SSMH -2 decreases in elevation from flowline in to flowline out by an average of 0.06' per SSMH. UA� State of Texas No. 24705 HGL Elev In HGL Elev Out SSMH Existing Proposed Existing Proposed (ft) (ft) (ft) (ft) EX M006 251.58 251.18 251.58 251.18 EX M011 250.14 249.83 250.07 249.77 PROP SSMH -1 N/A 249.62 N/A 249.56 PROP SSMH -2 N/A 249.31 N/A 249.24 EX M012 249.21 249.16 249.21 249.16 Table 5 The proposed reroute design does not adversely affect the existing sanitary sewer line flow characteristics upstream or downstream. As shown in table 3 above, for the given design considerations, the rerouted sanitary sewer reduces the hydraulic grade line elevation at the beginning SSMH -M011 and ending SSMH -M012. The hydraulic grade line through the proposed SSMH -1 and SSMH -2 decreases in elevation from flowline in to flowline out by an average of 0.06' per SSMH. UA� State of Texas No. 24705 APPENDIX A HYDRAULIC COMPUTATION SUMMARY 21 " AC Worksheet for Circular Channel Project Description Project File h: \engineering projects \greensworld phase 3 \san swr.fm2 Worksheet 21 " AC Flow Element Circular Channel Method Manning's Formula Solve For Full Flow Capacity Input Data Mannings Coefficient 0.013 Channel Slope 0.001510 ft/ft Diameter 21.00 in Results Depth 21.0 in Discharge 6.157 cfs Flow Area 2.41 ftZ Wetted Perimeter 5.50 ft Top Width 0.00 ft Critical Depth 0.91 ft Percent Full 100.00 Critical Slope 0.005200 ft/ft Velocity 2.56 ft/s Velocity Head 0.10 ft Specific Energy FULL ft Froude Number FULL Maximum Discharge 6.62 cfs Full Flow Capacity 6.16 cfs Full Flow Slope 0.001510 ft/ft 08/07/03 FlowMaster v5.12 10:58:22 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755 -1666 Page 1 of 1 Vi1."11. EX SSMH -MO12 EX SSMH -M Project Title: GREENSWORLD PHASE 3 - RE -ROUTE Project Engineer: KLING ENGINEERING h: \...\greensworld phase 3\san- exis.stm KLING ENGINEERING StormCAD v1.0 08/06/03 01:39:18 PM C Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755 -1666 Page 1 of 1 0 'p 00 O O CD 4 c6 O O ^' 7 p � A O Z CL = m- m 0 D J ZZ 3 m d w m ;o 7 p x x D = ni ut 3 m w m O C O m _ 01 . 0) CL m s O a 01 7 O w v O O O A r o 0 01 m a 0 m m m M v c n 0 4 v 0 co C cn D N O J N N 0) 01 m Fib 0 m CD 7 CD m r z 0 mm o Z �3 O m n z m vm z �b0 f 7 $74,0 9 0 Imo + .Y .T 4 � !1 ( 0u� o A O 7' AA gmro �o N 8 U)MO 33 ry v N .. A• .1 A x W m En 3 = 3 N N N NON O N N" N ( N N N N N N N 99 01 W O N A Ol 90 O N. 8888008088 CO \/7 B CD �k\ ° =_ k�m � §( |7 §k |m e ( [ _ I } + ( q ( (E z§ k§ ƒ§ ¢§ ) \ \ _ ( § \ \ � f M \ ; [ § $z �]Q �/\ §j§ & � e M ) / W 0 0 & 3: :1 �§ 6 9 X X 7 CL 3 C (D E( , § § J [�k S B E�§ §§ 2 /�k k w § , CD to a< ID @ , 4 OD (D § � ° 0 kk k e o E 9 9 � e e a w w . 9 @ � k} q q 0 < � v 0 m e � £� N� f 0 Ul �. § og r. 2 co § ", . MID §(A 5w ;# #d �E§ Q m■ �§ Cl) ■ � g � � ■ $ » � ■ � ■ vi, LAS laIJ avvi 77WS EX SSMH -MO12 SSMH -2 Project Title: GREENSWORLD PHASE 3 - RE -ROUTE Project Engineer: KLING ENGINEERING h:l..\greensworld phase 3\san- prol.stm KLING ENGINEERING Storm CAD v1.0 08/06/03 11:24:27 AM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755 -1666 Page 1 of 1 CSC JJlvlrl— lvluu7 7 77 2/D dCD \\ j )Iq 2( CD (E Cro. \ƒ }§ M c /& k � U E � I i } , \ cor. oc-0 4& 0 8 k� ;3?A! )§ E§ K /§ c ) \ \ 00 § > \ § � A k , 'o k 9 \ § § Q $§ � §Q k\\ \ ±Z �BQ m mo )� ) � � � � � � k ■A §pk2kK�kk 88888888888 O:r au O J O m w O � N � O a CO N w D v 0 N 3 N. X a r m Z 0 o m Z a C) m m m m 22 c N O J N N Of O) N 0 CD H m m O 7 0 O z C) �m o Z v 3 n 2 fD O m 2 o ,!) v v v v v A W N V N �n M M X X C V-0 C N y CO W N O CL w Cl) CO 2 = 3 m v -0 m g x ;o ;u x N a - 0 CO 00 CL Co N x 3 CO ? d A A co O n n n c O O m m L- 3 �o MI _ < � � W �: 3 pN NN O O O ( v v A w rn 7 N Rd ( m A (0 N N ;L p O) W N W MI A A ANA A N V V W OD v < < T O N (� p O 8 (Nn 7 m OAI VV (D p p S O O S v � 0 0 $0 ° J , A O 0 0 0 0 o S 0 0 0 0 W W W W N 0 CD OD U) y 0 O N .. 01 W Of N N pOpf�� N N N N N N N N q N N N N v� m O A F 7 N N N n (N(pp CA - W N N N N /) A W V OD r O f w to w w v r 1 0) - N W N ID N N N N Ln G) M N .( ( . ( A ° R c 0 �m:E ct ( (AO ( 'P O 0 a � OD 0 W ( - N 01 co pf pl co CD �D 1 7 O1 N O o v 00 O W W O 1 y (D N �a M � v m D :r Z w v D N (/1 3 m 0 2 N lD N d a m 0 a N 5 w J 07 O O a r m z � GI 0 m m a m m a c Q C) -i 0 m J O O c D N O W V N O O) O) O m O r z G) �m o Z v3 � m n z om ° z T v v v (D T v m m ;u ;u X X c C N D (n CL M W g X � � X to U T N 0 co (j) A A to N F a 7 7 7 7 0 0 (7 o O 7 A m L- N W OO V o 3� 89ton m p p �M,3 p N A W 8 l Ln 0 d V V OO tO N tO J 0 tU m A ID °�� Al M to A W O N Of � Vp 9) ry �m 8 O 8 8 00 0 N Q o 8 V 8 1 j j [4Z�! m c2 N A A O O m 0 0000 c 1 ° 0 0 0 0 J J J W W W W N m 0) 0) V to N W .rn A 0) m O O N d m 0) m 0 N N N N N N N N O N n V la CO to N V K d Pi CO t . W V N v r A V N A A A A t0 0 tO t0 F ,N �- r � rn w t co d N N N N ,nM N .( fA0 5 -N+ m W V N `� 2. �mf v 0 0 . `-°• t t 550 C O . N W N V 01 CO CO �J r V T N ID G fD -1 D 7 N y