Loading...
HomeMy WebLinkAboutCost EstimateENGINEER'S ESTIMATE for Water Improvements to HAMPTON INN AND SUITES Lot 1, Blk 1 Greensword Subdivision Ph. III to the City of College Station Brazos County, Texas TOTAL WATER IMPROVEMENTS = $9,237.00 WATERLINE "B" 0 +00 -2t84.02 NO. DESCRIPTION QUANTITY Revised 8/14/2003 UNIT COST TOTAL COST 1 8" PVC Water Line (C900, DR14) 285 LF WATERLINE "A" 0 +00 -2 +26.89 $5,985.00 2 Standard Fire Hydrant NO. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST 1 8" PVC Water Line (C900, DR14) 247 LF $21.00 $5,187.00 2 Standard Fire Hydrant 1 EA $2,500.00 $2,500.00 3 8" x 8" MJ Tee 3 EA $400.00 $1,200.00 4 8" x 90 MJ Bend 1 EA $350.00 $350.00 TOTAL WATER IMPROVEMENTS = $9,237.00 WATERLINE "B" 0 +00 -2t84.02 NO. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST 1 8" PVC Water Line (C900, DR14) 285 LF $21.00 $5,985.00 2 Standard Fire Hydrant 1 EA $2,500.00 $2,500.00 3 8" x 45 MJ Bend 1 EA $350.00 $350.00 TOTAL WATER IMPROVEMENTS = $8,835.00 WATER LINE "C" 0 +00 -1 +62.78 NO. DE SCRIPTION QUANTITY UNIT UNIT COST TOTAL COST 1 2 3 4 5 _6 7 8" PVC Water Line (C900, DR14) Standard Fire Hydrant 8" x 45 MJ Bend 8" x 6 x 8" MJ 8"R 6 x 8" MJ 8" Gate Valve 8" MJ Plug 183 1 1 L WATER IMPROVEMENTS = ID TOTAL IMPROVEMENTS = LF $21.00 $3,843.00 EA $2,500.00 $2,500.00 EA $350.00 $350.00 EA $400.00 $400.00 EA $400.00 $400.00 EA $1,000.00 $1,000.00 EA $100.00 $100.00 $8,593.00 $26,665.00 X:\700\3518- HAMPTON INN \DOCUMENTS \Hampton WaterEst ENGINEER'S ESTIMATE for Water Improvements to HAMPTON INN AND SUITES Lot 1, Blk 1 Greensword Subdivision Ph. III to the City of College Station Brazos County, Texas 7/10/2003 WATER LINE "A" 0 +00 -2 +26.89 NO. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST 1 8" PVC Water Line (C900, DR14) 227 LF $21.00 $4,767.00 2 Standard Fire Hydrant 1 EA $2,500.00 $2,500.00 3 8" x 8" MJ Tee 3 EA $400.00 $1,200.00 4 8" MJ Plugs 1 EA $250.00 $250.00 5 8" x 90 MJ Bend 1 EA $350.00 $350.00 TOTAL WATER IMPROVEMENTS = $9,067.00 WATER LINE "B" 0 +00 - 2 +88.02 NO. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST 1 8" PVC Water Line (C900, DR14) 289 LF $21.00 $6,069.00 2 Standard Fire Hydrant 1 EA $2,500.00 $2,500.00 3 8" x 45 MJ Bend 1 EA $350.00 $350.00 TOTAL WATER IMPROVEMENTS = $8,919.00 WATER! LINE "C" 0 +00 -1 +62.78 NO. DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST 1 8" PVC Water Line (C900, DR14) 163 LF $21.00 $3,423.00 2 Standard Fire Hydrant 1 EA $2,500.00 $2,500.00 3 8" x 45 MJ Bend 1 EA $350.00 $350.00 4 8" x 8" MJ Tee 1 EA $400.00 $400.00 TOTAL WATER IMPROVEMENTS = $6,673.00 GRAND TOTAL IMPROVEMENTS = $24,659.00 X: \700\3518- HAMPTON INN \DOCUMENTS \Hamptor_WaterEst