May 13, 2003
TO: Lee Adams, MDG, Via fax 693 -4243
FROM: Natalie Thomas Ruiz, Development a
SUBJECT: SPRING MEADOWS SUB. PHA (FP) - FinaqPla
Staff received the final plat application for the Spring Meadows final plat. A complete
review could not be performed due to an incomplete submittal. However, staff did
perform a cursory review and the engineering comments are attached.
Please submit the following information by an established deadline date to be
scheduled for the next available Planning and Zoning Commission meeting.
$100 application fee (The fee that was submitted was $300 for an
amending plat. A final plat was submitted which is $400.);
Variance request to the City's Subdivision Regulations with respect to the
non - buildable lots within the 100 year floodplain and the application fee of
$100.
Development permit fee of $200.
Thirteen folded copies of the plat. (The only copies of the plat that were
submitted were attached to the construction documents and not legible.)
Once the required information is received, staff will perform a complete review and
return comments. If you have any questions or need additional information, please call
Spencer Thompson or myself at 764 -3570.
Attachments: Staff review comments
cc: Frank Thurmond and Jerry Windham, PO Box 10195, College Station, TX 77842
Case file #03 -120
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: SPRING MEADOWS SUB. PH.1 (FP) - 03- 00500120
ENGINEERING
1. You can not neglect the portion of property fronting Green's Prairie Road.
2. Please remove all building lines, except those for the zero -lot line area and those
you wish to plat separately from City Ordinance.
3. Remove (TYP.) from PUE note on Lot 31 Block 3. The typical designation would
make all the 15 -ft setback areas on Rock Spring Court PUE and drainage
easements.
4. You cannot plat easements outside of plat boundary.
5. Change zero -lot line note to include Block information.
6. Add note that all common areas to be owned and maintained by homeowners
association.
7. City data shows an easement in the middle of this tract: Vol. 2615 pg 160. Did your
title report show this easement? Doesn't it need to be abandoned?
8. Remove Bob Mosley from certification.
9. You must request the variance to the subdivision regulations, as with the previous
plat.
10. The plat copy included with the construction was hardly legible. Please make
adjustments.
11. Engineering construction comments to be returned separately.
Reviewed by: Spencer Thompson Date: May 12, 2003
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 2
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
May 20, 2003
TO: Lee Adams, MDG, Via fax 693.4243
FROM: Bridgette George, Assistant Development Manager
SUBJECT: Spring Meadows Subdivision Phase I, Final Plat
Staff reviewed the above - mentioned engineering documents as requested. The
following page is a list of staff review comments detailing items that need to be
addressed. Please address the comments and submit the following information for
further staff review and approval of the plans:
Two (2) sets of revised construction documents.
If you have any questions or need additional information, please call Spencer
Thompson or myself at 764.3570.
Attachments: Staff Review Comments
Cc: Frank Thurmond / Jerry Windham, PO Box 10195, College Station,
Case file no. 03 -120
TX, 778
42
Home of Texas ABM University
SPRING MEADOWS SUB. PH.1 (FP) - (03- 00500120)
ENGINEERING REVIEW
COMMENTS No. 1
Please see Subdivision Regulations pertaining to platting and required drawings.
Streets and storm sewer drawing can be on one sheet. Separate sheets are required
for sanitary sewer and public water drawings. Please resubmit accordingly.
1. Sanitary sewer in conflict with storm drain, 7 +25?
2. Sheet C15 shows a curved storm sewer. Curved storm sewers are not allowed per
City Design Manual, however, they have been allowed when all curve data and
material information has been provided to the City to ensure proper design and
installation.
3. C17, remove storm sewer grate. The City will not accept the grate on the public
sewer. No flow information has been received for this inlet and the City is not willing
to accept surface flow from the area into the public storm sewer.
4. In addition to above comment, please review previous comments concerning this
project. When fill is placed in the floodplain labeled AE that does not have a
regulatory floodway, the applicant must demonstrate the effect of the fill in the
floodplain. See code citation below.
5. Sheet C17, scale?
6. Headwall is to be at Sta. 6 +22.37?
7. Sheet C18, elevations not denoted on profile. Drawing scale?
8. C25, is it possible to locate hydrant on end of line rather than BOV? And use 22 -1/2
bend?
9. Extend MH S8. Laterals are too long.
10. C27, show all tees, sizes and branches.
11.8" 3 -way tee and 8" 90 deg bend? Sta.?
12. Why the air relief in the middle of the line.
13. Why 8" crossing the street to two double services?
14. When proposing bends in water line, please demonstrate that the proposed bend
meets City requirements.
15. C28, check information at MH 10. Does not match what is shown.
16.C29, bend information on waterline missing.
17.C29, waterline should be reduced to 6" after hydrant.
Reviewed by: Spencer Thompson Date: May 15, 2003
Chapter 13, Drainage Ordinance, Section 5., G., (4).
When a regulatory floodway has not been designated, no new construction, substantial
improvements, or other development, including fill, shall be permitted within zones
designated AI -A30 and AE on the community's FIRM, unless it is demonstrated that the
cumulative effect of the proposed development, when combined with all other existing
and anticipated development, will not increase the water surface elevation of the base
flood more than one foot at any point within the community.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City of College Station will constitute a completely new review.
Page 2 of 3