HomeMy WebLinkAboutDevelopment Permit rff" DEVELOPMENT PERMIT
PERMIT NO. 13 -05 a
F OR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
`' "F " "` `s " " "" RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION: SITE ADDRESS:
Traditions Ph 23 BioMedical Way
DRAINAGE BASIN:
White Creek
DATE OF ISSUE: August 9, 2013 VALID FOR 24 MONTHS
OWNER: CONTRACTOR:
Bryan Commerce & Development Civil Constructors Inc
P.O. Box 1000 1707 Graham Rd
Bryan, Tx 77805 College Station, Tx 77845
TYPE OF DEVELOPMENT: Full Development Permit
CONDITIONS:
1. No work beyond limits covered in permit is authorized.
2. The permit may be revoked if any false statements are made herein. If revoked, all work must cease until permit is re-
issued.
3. The permit will expire if no significant work is progressing within 24 months of issuance.
4. Other permits may have been required to fulfill local, state and federal requirements. Construction will be in
compliance with all necessary State and Federal Permits.
5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project.
6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing
drainage facilities. Construction Site Notice or Notice of Intent (NOI) along with Stormwater Pollution Prevention Plan
(SWP3) will be kept and maintained on -site during construction as per TPDES permitting requirements. If it is
determined that the prescribed erosion control measures are ineffective to retain all sediment on -site, it is the
Contractor's responsibility to implement measures that will meet City, State, and Federal requirements.
7. All disturbed areas will be re- vegetated prior to Letter of Completion or Certificate of Occupancy.
8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the
Landscaping and Tree Protection Section of the City's Unified Development Ordinance, prior to any operations of this
permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as, but not limited to, paint, oil,
solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to
remain is also prohibited.
9. All construction shall be in accordance with the stamped approved plans and specifications for the above -named
project and all of the codes and ordinances of the City of College Station, as well as State and Federal Regulations
that apply. Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically
requested and approved will be allowed.
10. Special Conditions: PERMIT FOR WATER. Note: this system will not fully meet CS requirements for CIADM fireflow
plus domestic based on current conditions without the P37 Masterplanned Waterline in City of Bryan being inplace.
j
I, er, _. t , the Contractor, hereby agree to comply with all conditions herein.
( r 11 --.
6 - 12
(Con# ctor Signature Date
Phone number E -mail
f A ,Ag -L ete
1 hereby grant this permit for development. Contact C A 8 (9 the Public Works
Inspector assigned to this project 24 hours prior to beginning construction for scheduling required Inspections.
8 -9 -t?
• y ngineer /Re esentative Date