Loading...
HomeMy WebLinkAboutCost Estimate SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No. 12327 Primrose School Project Public Sidewalk Construction Engineer's Estimate of Construction Item 1 Description I Unit I Estimated I Unit Price I Total Quantity General Items 1 Mobilization, Overhead and Construction Staking LS 1 $ 1,000.00 $ 1,000.00 Erosion & Sediment Control - SWPPP Implementation & Maintenance, Silt 2 Fence, Construction Exit, Rock Filter Dam, etc., complete in place LS 1 $ 1,000.00 $ 1,000.00 3 Hydroseed and Hydromulch, complete in place SY 400 $ 0.60 $ 240.00 General Items Subtotal $ 2,240.00 PUBLIC SIDEWALK 4 Concrete Sidewalk - 4" thick, complete in place SF 1690 $ 4.00 $ 6,760.00 5 Crosswalk, complete in place SF 425 $ 8.00 $ 3,400.00 6 ADA Ramps - Detectable Warning Surfaces, complete in place EA 4 $ 600.00 $ 2,400.00 Public Sidewalk Items Subtotal $ 12,560.00 Public Water Line 7 8" C900 Water Pipe - Structural Backfill, complete in place LF 44 $ 28.00 $ 1,232.00 8 6" C900 Water Pipe - Structural Backfill, complete in place LF 6 $ 24.00 $ 144.00 9 8" M.J. Gate Valve, complete in place EA 1 $ 1,100.00 $ 1,100.00 10 6" M.J. Gate Valve, complete in place EA 2 $ 950.00 $ 1,900.00 11 12 "x 8" Tapping Saddle, complete in place EA 1 $ 900.00 $ 900.00 12 8 "x 2" Tapping Saddle, complete in place EA 1 $ 600.00 $ 600.00 13 8 "x 6" M.J. Tee, complete in place EA 1 $ 500.00 $ 500.00 14 8" x 6" M.J. Reducer, complete in place EA 1 $ 500.00 $ 500.00 15 Fire Hydrant Assembly (w /valve, vert. extension), complete in place EA 1 $ 3,500.00 $ 3,500.00 16 Connect to Existing Water Line, complete in place EA 1 $ 1,000.00 $ 1,000.00 17 Waterline Testing LS 1 $ 500.00 $ 500.00 Public Water Line Items Subtotal $ 11,876.00 TOTAL CONSTRUCTION' $ 26,676.00 OF is( ***** \\* JOSEPH P. SCHULTZ 65889 • /drZ r- / 2 F -12327 SCHULTZ ENGINEERING, LLC. Page 1 of 1 SCHULTZ ENGINEERING, LLC. 2730 Longmire Drive, Suite A College Station, Texas 77845 Firm No.12327 Primrose School Project Public Sidewalk Construction Engineer's Estimate of Construction Itam Description Unit Estimated Unit Price Total uantit General Items I Mobilization, Overhead and Construction Staking LS I $ 1,000.00 1 $ 1,000.00 2 Erosion & Sediment Control - SWPPP Implementation & Maintenance, Silt Fence, Construction Exit, Rock Filter Dam, etc., complete in place LS I $ I,000.00 $ 1,000.00 3 Hydroseed and Hydromulch, complete in place SY 400 $ 0.60 $ 240,00 General Items Subtotal $ 2,240.00 PUBLIC SIDEWALK 4 Concrete Sidewalk - 4" thick, complete in place SF 1690 $ 4.00 $ 6,760.00 5 Crosswalk, complete in place SF 425 $ 8.00 $ 3,400.00 6 ADA Ramps - Detectable Warning Surfaces, complete in place EA 4 $ 600.00 $ 2,400,00 Public Sidewalk Items Subtotal $ 12,569.00 TOTAL CONSTRUCTION $ 14,800.00 SCHUL.TZ ENGINEERING, LLC. 12 Page 1 of 1