Loading...
HomeMy WebLinkAboutStaff CommentsCITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM June 16, 2003 TO: David Scarmardo, DWS Development, Inc., Via fax 822.1763 FROM: Bridgette George, Assistant Development Manager SUBJECT: GATEWAY PH 2 (FP) -Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday, June 23, 10:00 a.m. to be placed on the next available Planning and Zoning Commission meeting scheduled for July 3, 2003, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) copies of the revised final plat; and, One (1) Mylar original with the appropriate signatures. If you have any questions or need additional information, please call me at 764 -3570. Attachments: Staff review comments cc: V Stewart Kling, Kling Engineering & Surveying, Via fax 846.8252 Case file #03- 00500129 Home of Texas A &M University STAFF REVIEW COMMENTS NO. 2 Project: GATEWAY PH 2 (FP) - 03- 00500129 ENGINEERING 1. The way the PUE was changed will not work. The water services must be in the PUE up to the meter. Sewer services need to be in easement to wye. The proposal last time was to place a Drainage Easement on top of the PUE where the storm drain is needed. Replace PUE as previously shown. Add Private Drainage Easement on top. 2. 1 take it the water line branch for Phase 4 will be off the 12" main. Otherwise, additional easement will be necessary. 3. Volume and page information for easements is not needed for the plat, at this time, but will be required for the Site Plan. Reviewed by: Spencer Thompson Date: June 12, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 ofz CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM June 2, 2003 TO: ' Scarmardo, DWS Development, Inc., Via fax 822.1763 FROM: Bridgette George, Assistant Development Manager SUBJECT: GATEWAY PH 2 (FP) - Final Plat Staff reviewed the above - mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, June 9, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, June 19, 2003, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. Two (2) copies of the revised final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to n man hart @ci. college-station .tx. us Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. If you have any questions or need additional information, please call Spencer Thompson or myself at 764 -3570. Attachments: Staff review comments cc: /Stewart Kling, Kling Engineering & Surveying, Via fax 846.8252 Case file #03- 00500129 Home of Texas ABM University STAFF REVIEW COMMENTS NO. 1 Project: GATEWAY PH 2 (FP) - 03- 00500129 ENGINEERING 1. The access easement across Gateway Phase 1 must be shown, volume and page. 2. The PUE on the rear property line on Lot 1, Block 1, Phase 2 adjacent to Bryan will be dedicated with this plat. However, the PUE on Lot 1, Block 1, Phase 4 will not be dedicated with this plat. According to CSU, this easement is needed for this project and must be dedicated by separate instrument. 3. Show additional easement as required for looping waterline. 4. Note Private Drainage Easement where private storm drain is proposed in PUE. 5. In order to plat this property separately from Phase 4, water must be extended to Phase 4. Reviewed by: Spencer Thompson Date: May 30, 2003 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 2000i version of plat and /or site plan. email to rbolin - ci.college- station.tx.us 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). Reviewed by: Ronnie Bolin Date: 6 -2 -03 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 2