HomeMy WebLinkAboutStaff Comments STAFF REVIEW COMMENTS NO. 1
Project: FEDORA SUBDIVISION (PP) - 02- 00500267
ENGINEERING
1. Please remove all site plan information from the preliminary plat.
2. All public utilities and meters must be in an easement or right -of -way
3. Show all easements as either proposed or existing. Please provide the volume and
page number for those recorded as a separate instrument.
4. The drive must be a "shared" access drive and must be within an access easement.
5. Please show the location of the zoning district boundary and zoning of subject
property.
6. Please provide the proposed land use for the subject property.
7. Please provide a note as to whether or not the property lies within a designated flood
plain.
8. Please tie the plat to a College Station monument or known platted point.
9. This property lies within the 92 -01 Impact Fee area. Impact fees will be due at the
time of building permit.
Reviewed by: Carol Cotter and Jennifer Flanery Date: December 31, 2002
ELECTRICAL
1. Developer installs conduit per city specs and design.
2. Developer provides 30' of #4 rigid conduit for riser pole(s).
3. Developer pours transformer pad(s) per city specs and design.
4. Developer installs pull boxes as per city specs and design.(pull boxes provided by
the city.
5. Developer provides digital AutoCAD 2000i version of plat and /or site plan.
Email to rbolinci.college-station.tx.us
6. Developer provides load data for project.
7. Developer provides temporary blanket easement for construction purposes.
8. Developer provides easements for electric infrastructure as installed for electric
lines.
Reviewed by: Ronnie Bolin Date: December 27, 2002
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
2 of 2